This is a Contractor Questions and National Park Service (NPS) Response document for solicitation 140P6026Q0014, which covers the supply and delivery of UBC (Recycled Asphalt Pavement) gravel to Arches National Park in Utah. The document addresses seven contractor inquiries regarding operational requirements and logistical constraints for this project.

Key operational requirements include: delivery hours and scheduling as specified in the Statement of Work (SOW), with weigh tickets required at job completion; material must meet specifications outlined in the SOW, with any pit source substitutions requiring prior approval and specification documentation from the park; deliveries must be completed in continuous sequence once started rather than split across multiple daily loads; trucks must be clean before entering the park; and the contractor bears responsibility for obtaining and submitting weigh tickets to the park. The NPS clarified that contractors should contact the Contracting Officer's Representative (COR) before beginning deliveries to receive specific drop-off coordinates, staging area information, and the designated park point of contact. Environmental protocols require dust control and spill prevention measures during material dumping. The NPS indicated that no Value Engineering Change Proposal (VECP) cost-sharing opportunity exists for this contract, and solicitation amendments changed the project title to reflect the correct park name and uploaded this Q&A document for contractor reference.

View the file

Other files

File Type Posted
Sol_140P6026Q0014_Amd_0002.pdf PDF
Sol_140P6026Q0014_Amd_0001.pdf PDF
Sol_140P6026Q0014.pdf PDF
B08_Solicitation_(Attachment_1_-_SOW).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCH - Arches National Park - Supply and Deliver UBC Gravel - 140P6026Q0014 Contractor Questions - NPS Response

1. Are there any restricted access windows, park entry fees, or security protocols for delivery trucks (e.g., hours, escorts, weigh-in)?

The hours and days are stated in the SOW they must report weigh tickets end of Job.

2. Exact drop-off spots inside the park: coordinates or maps?

Any staging area limits? Contact COR before they begin deliveries COR will give point of contact at park.

3. Material specs: Confirm gradation (1" minus?), compaction reqs, and if "functionally equivalent" sources are okay (e.g., local pit swaps to cut freight)?

Needs to met spec. in SOW if they need to swap pit they need to talk with park first and supply spec.

4. Delivery schedule: Can we split into daily loads (150-200 tons) over May-June, or must it be one big push?

Once we start we need to finish.

5. Are there any environmental restrictions, such as dust control, spill kits, or native soil protection, during the dump?

Make sure trucks are clean before entering park

6. Weigh tickets: Who handles them—the scale park side or ours? Any calibration needed?

The contractor is reasonable for Weight tickets to park.

7. VECP opportunity: If we propose a cheaper/local source meeting spec, how are savings shared?