- FOSM - Interpretive Overlook Rehabilitation
- Solicitation number
- 140P6026B0001
About this file
This document is a Project Specifications file for the Trail of Tears Overlook Rehabilitation project (PMIS: FOSM 293791) at Fort Smith National Historic Site in Fort Smith, Arkansas. The project involves constructing an outdoor exhibit and river overlook consisting of approximately 2,000 square feet of colored and stained concrete, installation of 9 ornamental trees with turfgrass seeding, 17 tons of boulders, various signage elements, a mural art piece, 7 NPS interpretive panels, 5 custom pylons, tree protection measures, grading with 87 cubic yards of fill, and removal and replacement of approximately 40 linear feet of existing sidewalk. Two bid options are included: Option 1 consists of installing approximately 1,400 square feet of understory plantings and mulch with cultivated edges and required landscape walkthroughs, while Option 2 involves sandblasting approximately 570 square feet of custom curved pattern on the installed colored concrete sidewalk with creation of pattern guides and mock-ups. The contract period is 365 calendar days from the Notice to Proceed, inclusive of all supply lead times, material deliveries, installation, and final commissioning.
The project specifications are organized into multiple divisions covering concrete formwork (Section 031100), steel concrete reinforcement (Section 032100), cast-in-place concrete (Section 033001), architectural precast concrete (Section 034500), signs (Section 101423), earthwork (Section 310000), site clearing (Section 311000), erosion and sediment control (Section 312513), concrete walks (Section 321300), seeding (Section 329219), and plants (Section 329301). Key requirements include adherence to ACI concrete standards, National Park Service regulations and the Superintendent's Compendium, protection of historical and archaeological resources with archaeologist oversight, compliance with OSHA safety requirements, implementation of erosion and sediment control measures, and a one-year construction warranty from final acceptance. Certification pages are included from a Licensed Landscape Architect (Josh Cheek), Civil Engineer (Andre' M. Rodrigue), and Structural Engineer (Brian Johnson), each certifying specific sections of work according to Arkansas regulations. Design renderings and a geotechnical report are provided as appendices for reference.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Smith National Historic Site (FOSM)
Fort Smith, Arkansas
Trail of Tears Overlook Rehabilitation
PMIS: FOSM 293791
Drawing No: 80064
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
SEPTEMBER 5TH, 2025
Div. 1 V. 2023-11-11 Page | 2
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 03 – CONCRETE
Section 031100 Concrete Formwork Section 032100 Steel Concrete Reinforcement Section 033001 Cast in Place Concrete Section 034500 Architectural Precast Concrete
DIVISION 04 – MASONRY
DIVISION 05 – METALS
DIVISION 09 – FINISHES
DIVISION 10 SPECIALITIES
Section 101423 Signage
DIVISION 31: EARTHWORK
Section 310000 Earthwork Section 311000 Site Clearing Section 312513 Erosion and Sediment Control
DIVISION 32 EXTERIOR IMPROVEMENTS
Section 321300 Concrete Walks Section 329219 Seeding Section 329301 Plants
APPENDICES
Appendix A Design Renderings Appendix B Geotechnical Report
FOSM 293791
09/03/2025 000011 - 1 Project No. 190300191
SECTION 00 0011
Landscape Architect Certification Page
Landscape Architect Certification
I, ________________________________ , hereby specify, pursuant to the state of Arkansas that the documents intended to be authorized by my seal are limited to:
SPECIFICATION SECTIONS
• Section 01 10 00 - Division 01 Short Form General Requirements
• Section 101423 Signage
• Section 034500 Architectural Precast Concrete
• Section 310000 Earthwork
• Section 311000 Site Clearing
• Section 321300 Concrete Walks
• Section 329219 Seeding
• Section 329301 Plants
DRAWINGS
• XD 1.0
• LT 1.0
• LS 1.0-1.3; LS 5.0-5.3
• LP 1.0-1.4; LP 5.0
• LG 1.0-1.3
And disclaim any responsibility for all other plans, specifications, reports or other documents or instruments relating to or intended to be used for any part or parts of the Trail of Tears Interpretive Overlook in Fort Smith, Arkansas.
SEAL:
BY: __________________________________________ DATE:___________
September 05, 2025
Josh Cheek
09/05/2025
09/03/2025 000011 - 2 Project No. 190300191
SECTION 00 0011
Civil Engineer Certification Page
Civil Engineer Certification
• Section 312513 Erosion and Sediment Control
DRAWINGS
• XC 1.1-1.3
And disclaim any responsibility for all other plans, specifications, reports or other documents or instruments relating to or intended to be used for any part or parts of
STATE OF
Andre' M. Rodrigue
9/5/2025
09/03/2025 000011 - 3 Project No. 190300191
SECTION 00 0011
Structural Engineer Certification Page
Structural Engineer Certification
• Section 031100 Concrete Formwork
• Section 032100 Steel Concrete Reinforcement
• Section 033001 Cast in Place Concrete
DRAWINGS
• LS5.4
And disclaim any responsibility for all other plans, specifications, reports or other documents or instruments relating to or intended to be used for any part or parts of
END OF SECTION 00 0011
J. KREBS
Structural PE Stamps.dgn
J. KREBS
Text Box Brian Johnson
J. KREBS
Text Box Brian Johnson
J. KREBS
Text Box August 25, 2025
Page | 3
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The Trail of Tears Overlook was a key feature in telling the Federal Indian Policy and Indian Removal stories, two of the main nationally significant Fort Smith NHS park themes.
As a designated site on the Trail of Tears National Historic Trail and due to its location overlooking the Arkansas River and Oklahoma (historically named Indian Territory), which is home today to 39 Sovereign Tribal Nations, and commemorated the water route of the Trail of Tears. It was also a place that tribes’ and tribal members gathered for special commemorative events. Historically, as forcefully removed tribes travelled past Fort Smith, this area/river corridor was where they saw the first glimpse of their new homeland in Indian Territory. It was at this location where a ‘boundary of transition’ lied as it marked a passage from known homelands into the unknown this new territory would host. It is a valuable cultural landscape and is an area encompassing histories and stories deeply intertwined with the park’s 80-year period of significance.
The existing Trail of Tears overlook at Fort Smith National Historic Site were washed out in a recent flood event. NPS is seeking to build an expanded overlook on the existing site. The exhibit features information on the Trail of Tears water route and the Tribal Nations effected.
1.2 Work Covered by the Contract Documents:
A. Project Location: Along riverside path (35°23'19.63"N, 94°25'59.06"W), Fort Smith National Historic Site, Fort Smith Arkansas
a. For Deliveries: 301 Parker Ave, Fort Smith, AR 72901.
B. Work consists of: The Work consists of the construction of an outdoor exhibit and river overlook along an existing sidewalk at Fort Smith National Historic Site. The exhibit and overlook consist of approximately 2,000 SF of concrete with a coloring and stain component. The Work also includes the installation of 9 ornamental trees with turfgrass seeding. The Work also includes the installation of 17 tons of boulders, various signage elements, and the installation of a mural art piece. The Work includes the production and installation of 7 NPS interpretive panels and 5 custom pylons. 3 interpretive panels will be placed in traditional NPS 45 degree angle metal frames and 4 will be affixed to boulders. The work will include tree protection, grading with 87 CY fill, and the removal and replacement of approx. 40 LF of existing sidewalk. Approximate quantities provided for the convenience of the contractor. Contractor shall be responsible for all quantities.
C.
a. Bid Option 1: The Work consists of the installation of approximately 1400 SF of understory plantings and mulch with a cultivated edge along planting bed edges. The understory planting replaces some of the seeded turfgrass areas. Required landscape walkthroughs and approvals with the COR must also be performed.
Page | 4
b. Bid Option 2: The Work consists of sandblasting approximately 570 SF of a custom curved pattern on the installed colored concrete sidewalk. The Work includes the creation of the curved pattern guide and required mock-ups.
D. All work will be performed under a single contract.
E. Period of performance: Work shall be completed 365 CALENDAR days of the start date provided on the Notice to Proceed.
a. Clarification: The Notice to Proceed will be issued with a period of performance that is all inclusive of supply lead times, material deliveries, decommissioning, installation, anticipated average weather days for location, final commissioning, and acceptance of completed work. The contractor will be expected to provide a project schedule with adequate critical path details to ensure all work is completed within the stated calendar days from issuance of the Notice to Proceed. If weather impacts project beyond typical average weather patterns, contractor shall provide documentation in request for additional days.
1.3 Existing Condition Protections:
A. Preservation of Historical and Archeological Fabric:
i. The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
ii. IF, in connection with operations under this contract, the Contractor, subcontractors, or employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the discovery and notify the Contracting Officer immediately, when safe to do so, and follow up in writing within 2 days, giving the location and nature of the findings. No objects of cultural resource value may be removed. Contracting Officer will contact other entities as required.
iii. Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with Changes clause.
iv. The Contractor will be responsible for protecting the cultural resources within and adjacent to the project area from damage. In addition, the Contractor will be liable for all damage to the cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or their representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
v. The Contractor agrees to include this language within all subcontracts.
B. Protection of Landscaping and Surrounding Structures: All Ground Disturbance at this project shall have oversite by an Owner provided Archeologist. Coordinate schedules as required.
The Contractor shall take all necessary measures to provide protection for all trees, fencing, walks and other landscape features and surrounding structures near the work site as noted
Page | 5 with the contract. Any such surrounding features damaged, scarred or broken as a result of the Contractor’s operations at the site outside of agreed upon documented extents, shall be treated, repaired or replaced in kind to the satisfaction of the Contracting Officer at no additional expense to the Government.
a. Site Disturbance – Earthen Grade / Soil: The preservation of potential archeological resources is a critical requirement for this project.
i. All effort shall be made to minimize equipment and vehicular traffic while on site to reduce further compaction and aid future site restoration.
ii. Contractor shall not disturb the site or earthen grade during work beyond what is indicated on plans.
iii. Contractor shall protect all earthen grade from damage from humans and equipment with a minimum of two layers of ¾” protective boards or similar protective measures to prevent gouging or impacting soil.
iv. Contractors shall not drive equipment, fencing, signage, or any other accessories or equipment into grade.
v. Contractors and equipment shall not dig, gouge, or move any soil.
vi. The existing dry-laid stacked stone piers that support the ca. 1831 original barn and portions of the ca. 1867 barn structure shall be carefully protected and retained in situ with no modifications or alterations. Do not alter soil in any way in these locations.
vii. Some timber frame sill beams are in contact with grade. These sill beams shall remain in situ, undisturbed, and will be removed later by the Park archeologists.
viii. Concrete piers and concrete slabs are not to be disturbed. These shall be protected and remain in situ, undisturbed, and will be removed later by Park archeologists.
ix. Any items currently impaled in grade will remain intact. Do not remove.
ITEM 2 – PROTECTING EXISTING UTILITIES
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative
(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
Page | 6
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
Superintendent’s Compendium - Fort Smith National Historic Site (U.S. National Park Service)
A. Communications: Contractor shall provide the Contracting Officer and COR with methods of communications including land and/or cell phone numbers (note some areas of work have limited service coverage), email and in case of emergency 24-hour contact options for duration of time operations.
B. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
C. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
D. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. A portion of the trail may be closed with signage, as shown in the drawing set. Trail closure is not to extend past what is marked in the drawing set unless the Contractor receives prior written approval from the COR.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of
8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding
Friday; holidays falling on Sunday will be observed on the following Monday. The specific https://www.nps.gov/fosm/learn/management/superintendent-s-compendium.htm https://www.nps.gov/fosm/learn/management/superintendent-s-compendium.htm
Page | 7 day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Do not disturb site outside of noted disturbance area, as shown in the Construction Drawings, including earthwork and clearing of vegetation.
i. Contractor shall provide appropriate mats for equipment on turf areas to reduce soil compaction.
ii. Contractor shall remediate soil compaction as directed to do so by the CO/COR.
D. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract
Sum as required.
2. Water Service: Water from existing water system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from existing system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Waste Operation:
a. Toilets: Contractor must provide toilets for contractor personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.
b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate as shown on site plan or coordinated with COR.
E. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022
Page | 8 regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Coordinate with COR. Restore damaged areas to original condition, repairing or replacing damaged trees and plants, at no additional expense to the Government.
b. Temporary Barriers or Fencing Plan. Provide temporary fencing enclosure plan to protect park visitors and staff from work site and to secure the site when work is not ongoing. Temporary fencing may include one or more lockable gates and be installed and removed without disturbing the soil or subgrade. Submit layout and narrative description of layout, equipment, product cut sheets, and provisions for protection of potential below-grade archeological resources.
c. Provide temporary barriers to protect existing trees and plants and root zones.
d. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer Representative and remove agreed-on roots and branches that interfere with construction.
e. Do not fasten ropes, cables, or guys to trees.
f. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
4. Pest Control: N/A
5. Temporary Enclosures: Provide temporary enclosures such as snow fence as required for protection of construction in progress and completed, from access by visitors or staff, other construction operations, and similar activities.
i. Temporary Chain-Link Fencing: Minimum 2 inch, 9-gage, galvanized steel, chain-link fabric fencing; minimum 6 feet high with galvanized steel pipe posts;
minimum 2-3/8 inch OD line posts and 2-7/8 inch OD corner and pull posts, with 1-5/8 inch OD top and bottom rails. Provide platform-type galvanized steel bases for supporting posts on top of grade. No portions of the fencing may be installed in the soil.
6. Site Enclosure Fence: Before construction operations begin, furnish, and install portable platform base six (6) foot tall chain link fencing in a manner that will prevent people and animals from easily entering site and or storage areas except by entrance gates.
a. Extent of Fence: As required to enclose portion determined sufficient to accommodate construction operations and storage.
b. Locate vehicular gates to avoid interference with traffic on public thoroughfares.
c. Locate pedestrian entrance gates as required to provide controlled personnel entry.
d. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Provide CO and or COR with one set of keys or utilize double lock with NPS lock.
Page | 9
7. Hot Work Permit: N/A
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage units shall be provided by the contractor and exact location within staging area may be discussed at the preconstruction briefing. All storage units provided by the contractor shall be in a clean and acceptable condition to the COR. Security of the materials and equipment on site is the Contractor’s responsibility. See Construction Documents showing project and allowable construction area. One bay and the parking lot will be available for storage. Limits of use and control shall be subject to Contracting Officer’s approval. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site and impact to park visitors (avoid high use times.)
3.5 Preservation of Natural Features: The entirety of the park is a cultural landscape with historical significance. The Contractor shall strictly adhere to confining construction activity within the limits identified on the Construction Drawings. Avoid impacts to landscape beyond the limits of work and do not encroach near the riverbank with equipment.
3.6 Hauling Restrictions: Contractor shall verify and be responsible for the path accessing the site and obtaining / maintaining all local, state and federal permits/licenses associated with hauling/road requirements and dumping of materials associated with the project.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use appropriate methods to extent possible during this project, salvaging and recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings: N/A
1. Full Government Occupancy: Government will occupy buildings near the construction site during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.
Page | 10
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted preferably electronically by email or optional approved cloud storage and 8 mega pixels minimum within 30 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
D. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926
Page | 11
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management
A. Contractor shall not have personal radios or other media sources and they shall not be broadcasted within NPS property.
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items visible during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the
Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, windstorms, and the rare but possible occurrence of https://www.nps.gov/orgs/1671/do-business-with-us.htm
Page | 12 a snake bite. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain four sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with
Page | 13 guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the local 911 Emergency Response, COR and or the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items are to be submitted prior to the Preconstruction Conference or as specified at the CO’s discretion. The timeline for the documents to be submitted will be addressed at the pre-construction conference for those items that were not received and approved prior. Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies if not resolved as directed.
Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Quality Control Plan.
Page | 14
9.2 Project Submittal Process (Shop Drawings, Product Data, and Samples): Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all product color selections.
Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the
Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: All brand names noted are subject to ‘or equal’ products. If an item in this solicitation is identified as “brand name or equal,” “basis of design or equal,” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification. Contractor shall incorporate and be responsible for all collateral costs due to the or equal proposed as required to provide a complete project.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
Page | 15
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that General Contractor:
1. Has investigated and shall provide documentation in request showing that the proposed item is equal or superior in all respects to the salient characteristics specified.
2. Will meet or exceed warranties for the proposed item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the
Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.
9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.
Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.
ITEM 11 - PROJECT CLOSEOUT
Page | 16
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the
CO.
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of
Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.
B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
Page | 17
C. Information shall include operation and maintenance manuals for each warranted product.
ITEM 12 - DEFINITION OF CONTRACT LINE ITEMS
12.1 Summary
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
12.2 List of Contract Line Items
A. Contract Line Item No.1 – Site Preparation & Improvements
1. This item consists of site clearing, site demolition & relocations, site earthwork, and other site preparation (including tree protection, temporary erosion control, and temporary fencing/barricades). It also includes the installation of concrete walking surfaces, boulders, ornamental trees, signage, ADS drains and pipe, and the seeding of disturbed areas. Work also includes the manufacture and installation of custom signage, precast pylons, and a concrete mural wall.
2. Payment will be made per the contract and percentage of completion level.
B. Contract Line Item No. 2 – Bid Option 1: Understory Plantings
1. This item consists of the installation of groundcover plants and mulch.
2. Payment will be made per the contract and percentage of completion level.
C. Contract Line Item No. 3 – Bid Option 2: Concrete Sandblast.
1. This item consists of sandblasting paving according to the design pattern.
2. Payment will be made per the contract and percentage of completion level.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
Printed 8/26/2025 031100 -1 FOSM 293791
SECTION 031100
CONCRETE FORMWORK
PART 1 GENERAL
1.01 RELATED WORK SPECIFIED ELSEWHERE
A. Steel Concrete Reinforcement: Section 032100.
C. Cast-In-Place Concrete: Section 033001.
1.02 REFERENCES
A. Except as shown or specified otherwise, the Work of this Section shall conform to the requirements of Specifications for Structural Concrete for Buildings ACI 301-16 of the American Concrete Institute.
1.03 DESIGN REQUIREMENTS
A. ACI 301, Section 2.1 – Formwork and formwork accessories, General:
1. Add the following to 2.1.1 Description:
The formwork shall be designed for loads, lateral pressure, and allowable stresses outlined in Chapter 4 - Design of “Guide to Formwork for Concrete” (ACI 347-14).
1.04 SUBMITTALS
B. Product Data: Manufacturer’s catalog sheets, specifications, and installation/application instructions for the following:
1. Form systems and ties.
2. Textured (architectural) form linings.
C. Samples: none
PART 2 PRODUCTS
2.01 MATERIALS
A. Chamfer Strips: Wood, metal, PVC or rubber; 1 inch chamfer, unless otherwise indicated on the Drawings.
PART 3 EXECUTION
Printed 8/26/2025 031100 -2 FOSM 293791
3.01 PREPARATION OF FORM SURFACES
A. Apply form-coating material in accordance with manufacturer’s instructions.
3.02 INSTALLATION
A. Provide chamfer on all exposed external corners of concrete.
B. Provisions for Work of Related Contracts: Provide openings in concrete formwork to accommodate Work of related contracts. Obtain information for size and location of openings, recesses and chases from contractor requiring such items.
C. Shores and Supports:
1. Concrete members subject to additional loads during construction shall be shored in such a manner as will protect the member from damage by the loads.
2. Place shores supporting successive stories directly over those below or so design the shores to transmit the load directly to them.
3. Do not remove shores until the member supported has acquired sufficient strength to safely support its weight and any weight imposed thereon.
3.03 REMOVAL OF FORMS
A. ACI 301, Section 2.3.2 - Removal of Forms:
1. Change paragraph 2.3.2.5 to read as follows:
2.3.2.5 Forms and shoring used to support the weight of concrete in beams, slabs and other structural members shall be removed in accordance with recommendations in paragraph 3.2.5 of “Recommended Practice for Concrete Formwork” (ACI 347-14).
2. Add the following paragraphs:
2.3.2.8 All formwork shall be removed after the concrete has sufficiently hardened, except in inaccessible spaces where approved.
3. Change paragraph 2.3.2.7 to read as follows:
2.3.2.7 After the ends or end fasteners of form ties have been removed, the embedded portion of the ties shall terminate not less than 3/4 inch from the formed surfaces of concrete.
3.04 RE-USE OF FORMS
A. Split, frayed, delaminated or otherwise damaged form facing material shall not be used.
Updated 07/24/2018 Printed 08/11/2025 032100 -1 FOSM 293791
SECTION 032100
STEEL CONCRETE REINFORCEMENT
A. Concrete Formwork: Section 031100.
B. Cast-In-Place Concrete: Section 033001.
A. Except as shown or specified otherwise, the Work of this Section shall conform to the applicable requirements of the following:
1. Specifications for Structural Concrete, ACI 301-16 of the American
Concrete Institute (ACI).
2. Manual of Standard Practice, MSP-1-01 of the Concrete Reinforcing
Steel Institute (CRSI).
1.03 SUBMITTALS
A. Shop Drawings: Placing drawings for bar reinforcement.
B. Samples:
1. Bar Supports: Full size.
2. Fabric Reinforcement: 8 inches square, each wire size.
3. Fabric Reinforcement Supports: 3’-0” long pieces.
4. Reed Clips: 2’-6” long pieces.
C. Quality Control Submittals:
1. Certificates: Affidavit required under Quality Assurance Article.
1.04 QUALITY ASSURANCE
A. Certifications: Affidavit by the bar reinforcement manufacturer certifying that bar material meets the contract requirements.
1. Submit evidence of steel material compliance with this Specification.
Evidence shall consist of certification of source of material, copies of purchase orders and manufacturer's certifications. For stock material, submit copies of latest mill or purchase orders for material replacement.
a. Documentation to confirm compliance with General Conditions Article 25.4 Domestic Steel.
Printed 08/11/2025 032100 -2 FOSM 293791
2. Fabricator's and Erector's Qualifications Data: Name and experience of fabricator and erector.
B. The Contractor agrees, that if the value of this contract exceeds $100,000 all structural steel, reinforcing steel and other major steel items to be incorporated in the Work of this Contract shall be produced and made in whole or substantial part in the United States, its territories or possessions.
A. Bar Reinforcement: ASTM A 615, Grade 60, deformed steel bars.
B. Welded Wire Reinforcement: ASTM A 185, welded wire fabric, fabricated into flat sheets unless otherwise indicated.
C. Bar Supports; Either of the Following Types:
1. Galvanized steel or AISI Type 430 stainless steel, and without plastic tips.
2. Insoluble plastic, with minimum 1,500 psi tensile strength and capable of retaining fabricated shape at temperatures between 5 degrees F and 170 degrees F.
D. Welded Wire Reinforcement Supports:
1. Shall comply with CRSI RB4.1
E. Tie Wire: Black annealed wire, 16-1/2 gage or heavier.
3.01 PLACING
A. ACI 301, Section 3.3 Execution:
1. Replace the first sentence in paragraph 3.3.2.1 Tolerances- with the following:
Place, support, and fasten reinforcement as shown on the project drawing or approved shop submittal.
2. Add the following paragraphs:
3.3.2.3.f Bar Reinforcement: In rectangular panels of two-way construction, place the steel in the short direction first with the longer bars on top in the opposite direction.
3.3.2.5.c Welded Wire Reinforcement: Offset end laps in adjacent sheets to prevent continuous joints at ends…