Attachment 2 - Div 2 - 626 Pages.docx

DOCX document 10 MB Posted

Attached to
TAPR - Rehabilitate Ranch House and Terrace Walls
Solicitation number
140P6019R0019
Issued by

About this file

This solicitation is for rehabilitation work at the Spring Hill Ranch House and stone terrace walls located within the Tallgrass Prairie National Preserve. The solicitation includes specifications for the rehabilitation of cast-in-place concrete, selective historic demolition, removal and disposal of lead contaminated soils and lead paint, and other exterior improvements. Key requirements include the removal and disposal of deteriorated concrete and reinforcement; epoxy crack injection; selective demolition and removal of materials containing lead paint; off-site transportation and disposal of waste; and rehabilitation of the ranch house, stone terraces, and site features. The solicitation is issued by the U.S. Department of the Interior National Park Service Midwest Region. The response due date and award date are not provided in the document.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REHABILITATE SPRING HILL RANCH HOUSE & REHABILITATE STONE TERRACE WALLS

SPRING HILL RANCH HOUSE

TAPR

PMIS NO. 227638/233366

BID SET CD SPECIFICATIONS DIVISIONS 2 - 33

NATIONAL PARK SERVICE

SECTION 00 01 07 - SEALS PAGE

PART 1 - GENERAL

1.1 SUMMARY

A. Professional seals by Design Professionals and others responsible for preparing Construction Documents:

1. Civil Engineer:

TAPR – 233366

031414 00 01 07 - 1

SEALS PAGE

2. Landscape Architect:

3. Architect:

4. Structural Engineer

5. Mechanical Engineer:

6. Electrical Engineer:

TABLE OF CONTENTS

DIVISION 2 – EXISTING CONDITIONS

02 41 00
Site Demolition
02 41 10
Building Demolition
02 41 91
Selective Historic Demolition
02 61 00
Removal and Disposal of Lead Contaminated Soils
02 81 01
Off-site Transportation and Disposal
02 83 13
Lead Paint Abatement

DIVISION 3 – CONCRETE

03 01 30.71
Rehabilitation of Cast-in-Place Concrete
03 10 00
Concrete Forming and Accessories
03 20 00
Concrete Reinforcing
03 30 00
Cast-in-Place Concrete

DIVISION 4 – MASONRY

04 01 40.91 Stone Restoration

DIVISION 5 – METALS

05 52 00 Steel Railings

DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES

06 01 40.91
Architectural Woodwork Restoration
06 10 00
Rough Carpentry
06 15 00
Wood Decking
06 20 00
Finish Carpentry

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

07 53 23
Ethylene-Propylene-Diene-Monomer (EPDM) Roofing
07 62 00
Sheet Metal Flashing and Trim
07 92 00
Joint Sealants

DIVISION 8 – OPENINGS

08 01 52.91
Wood Window Restoration
08 14 33
Stile and Rail Wood Doors
08 71 00
Door Hardware
08 80 00
Glazing

TAPR - 010000

TOC-3

DIVISION 9 – FINISHES

09 01 20.91
Plaster Restoration
09 21 16
Gypsum Board Assemblies
09 72 23
Wallpapering
09 90 00
Painting and Coating
09 96 00
Performance Coatings

DIVISION 22 – PLUMBING

22 05 00
Common Work Results for Plumbing
22 05 17
Sleeves and Sleeve Seals for Plumbing Piping
22 05 18
Escutcheons for Plumbing Piping
22 05 23
General-Duty Valve for Plumbing Piping
22 05 29
Hanger and Supports for Plumbing Piping and Equipment
22 05 53
Identification for Plumbing Piping and Equipment
22 07 19
Plumbing Piping Insulation
22 11 16
Domestic Water Piping
22 13 16
Sanitary Waste and Vent Piping
22 33 00
Electric, Domestic-Water Heaters

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

23 01 30.52
Existing HVAC Air Distribution System Cleaning
23 05 00
Common Work Results for HVAC
23 05 13
Common Motor Requirements for HVAC Equipment
23 05 17
Sleeves and Sleeve Seals for HVAC Piping
23 05 29
Hangers and Supports for HVAC Piping and Equipment
23 05 53
Identification and HVAC Piping and Equipment
23 05 93
Testing, Adjusting, and Balancing for HVAC
23 07 13
Duct Insulation
23 07 19
HVAC Piping Insulation
23 08 00
Commissioning of HVAC
23 09 23
Direct Digital Control (DDC) System for HVAC
23 09 23.12
Control Dampers
23 09 23.18
Lead Detection Instruments
23 09 23.19
Moisture Instruments
23 09 23.27
Temperature Instruments
23 11 26
Facility Liquefied-Petroleum Gas Piping
23 23 00
Refrigerant Piping
23 31 13
Metal Ducts
23 33 00
Air Duct Accessories
23 37 13
Diffusers, Registers, and Grilles
23 54 16.13
Gas-Fired Furnaces
23 63 13
Air-Cooled Refrigerant Condensers
23 82 19
Fan Coil Units
23 82 36
Radiation Heaters
23 84 16.16
Indoor, Mechanical Dehumidification Units

DIVISION 26 – ELECTRICAL

26 05 00
Common Work Results for Electrical
26 05 19
Low-Voltage Electrical Power Conductors and Cables
26 05 26
Grounding and Bonding for Electrical Systems
26 05 29
Hangers and Supports for Electrical Systems
26 05 33
Raceway and Boxes for Electrical Systems
26 05 44
Sleeves and Sleeve Seals for Electrical Raceways and Cabling
26 05 53
Identification for Electrical Systems
26 05 73
Electrical System Studies
26 08 00
Commissioning of Electrical Systems
26 27 26
Wiring Devices
26 28 16
Enclosed Switches and Circuit Breakers
26 41 13
Lighting Protection for Structures
26 51 00
Lighting Fixtures

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 11 Digital, Addressable Fire-Alarm System

DIVISION 31 - EARTHWORK

31 10 00
Site Clearing
31 20 00
Earth Moving
31 23 33
Trenching and Backfilling
31 25 00
Temporary Erosion and Sedimentation Control
31 37 19.1
Rockery Boulder Cheek Walls
31 37 19.2
Rockery Stone Retaining Walls – Dry Laid

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 13 13
Concrete Paving
32 13 73
Concrete Paving Joint Sealants
32 17 23
Pavement Markings
32 32 53.1
Stone Retaining Walls – with Mortar
32 32 53.2
Stone Stairs – Dry Laid
32 84 00
Irrigation Systems
32 91 13
Soil Preparation
32 91 19.13
Topsoil
32 92 19
Seeding and Mulching
32 93 43
Planting

DIVISION 33 - UTILITIES

33 11 00Water Utility Distribution Piping
33 41 00Storm Utility Drainage Piping

TABLE OF CONTENTS

Mortar Samples Report and Map Environmental Assessment Services Geotechnical Exploration Report NPS Final Accessibility Inspection Report

TAPR - 010000

TOC-1

SECTION 02 41 00 – SITE DEMOLITION PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section of the Work includes:

1. Demolition and removal of tree stumps

2. Removal of existing shrubs

3. Removal of gravel road for proposed walk

4. Remove and salvage concrete pavers at back patio

5. Utility demolition per civil and electrical drawings

6. Remove and salvage upper ground surface 4” depth

7. Remove and salvage signs and miscellaneous site furnishings

8. Remove and salvage damaged stone/rock in existing walls and steps

9. Remove and reinstall existing walls and steps

10. Remove wall mortar patches at dry stack walls

11. Remove and reinstall wrought iron fence and gate

12. Remove concrete landing below existing middle wall stairs

13. The Work also includes incidental filling and grading, and disposal of unsalvageable materials

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Preserve ready for reuse.

C. Remove and Reinstall: Number and key items to be detached, detach items from existing construction, prepare for reuse, and reinstall where indicated.

D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.4 QUALITY CONTROL

A. Comply with safety requirements for demolition, ANSI A10.6-83.

1.5 PROJECT CONDITIONS

A. Keep dust to a minimum at removal areas. Use water trucks as necessary.

B. Ensure safety of persons in demolition area. Provide temporary barricades as required per Division 01 Section “Temporary Facilities and Controls”.

TAPR –227638/233366

03/29/2019 02 41 00-4

SITE DEMOLITION

1.6 PRECONSTRUCTION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review work for items to be detached including numbering and keying, and stockpile areas.

6. Review areas where existing construction is to remain and requires protection.

7. Review areas where salvaged materials will be stored. Coordinate with Contracting Officer Representative during conference.

1.7 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and for noise control. Indicate proposed locations and construction of barriers.

B. Record of items to be removed and re-installed: Submit keyed plans for stone walls or steps and wrought iron fence to be deconstructed prior to the commencement of any work. Prepare drawings that identify each stone to be removed. Assign two numbers to each piece of stone or fence. One number shall be an identification number and the second number shall be the items shape and size. Identify items that need replacement based upon visual inspection and record any characteristics that will be necessary to manufacture a replacement piece

C. Marking of items to be deconstructed: Prior to any commencement of work, identify the method of marking stones and fencing with numbers for approval by the Contracting Officer Representative. Marking shall not damage any item and be able to withstand the weather and conditions at the stockpile location.

D. Schedule of Demolition Activities indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Contracting Officer Representative and Preserve’s on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted. Per Division 01 Section “Temporary Facilities and Controls”.

3. Coordination for shutoff, capping, and continuation of utility services. Per Division 01 Section “Temporary Facilities and Controls”.

E. Inventory: Submit a list of items to be removed and salvaged and deliver to Contracting Officer Representative prior to start of demolition.

F. Preconstruction Photographs or Video: Submit before Work begins. Per Division 01 Section “Photo Documentation for Historic Preservation Projects”.

1.8 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

PART 2 - PRODUCTS

2.1 FILL MATERIALS

A. Native soils, free of debris, frozen materials, roots, and other organic matter. See Division 31 Section “Earth Moving”.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect structures, pavement, trails, utilities, and vegetation to remain.

B. Set up all barriers, including those for tree protection, in accordance with Division 01 Section “Summary of Work” and Division 01 Section “Tree Protection and Retention”, prior to proceeding with any demolition.

3.2 DEMOLITION

A. Pavement, Slabs, and Miscellaneous Concrete Items:

1. Remove concrete slabs-on-grade and miscellaneous concrete items as directed. Where concrete to be removed abuts concrete to remain, pavement shall be uniformly saw-cut along an existing joint. Jagged or crooked edges will not be acceptable. Concrete shall be broken up, hauled and disposed off site. All recyclable materials shall be hauled to nearest recycling center and any non-recyclable materials shall be hauled to an approved Disposal Site designated by the Contracting Officer Representative.

2. Remove road base material that is exposed after removing the pavement. This material shall be hauled and disposed off site unless otherwise directed by the Contracting Officer Representative. All recyclable materials shall be hauled to nearest recycling center and any non- recyclable materials shall be hauled to an approved Disposal Site designated by the Contracting Officer Representative.

B. Abandoned Utilities: Refer to division 31 Sections Site Clearing and Earth Moving, Division 32 Utility Sections and the Drawings.

3.3 RESTORATION

A. Backfilling: Ensure that areas to be filled are free of standing water, frost, frozen material, vegetation, including roots and debris. Place fill materials in accordance with Division 31 Section “Earth Moving”.

B. Grading:

1. Restored Areas: Grade surface to blend with original contours and provide free drainage flow. All ruts and depressions where any amount of standing water collects shall be re- graded to a smooth natural appearance to ensure positive drainage.

2. New Construction Areas: Grade as indicated in Division 31 Section “Earth Moving”.

3.4 DISPOSAL

A. Remove trash, debris and waste materials, haul and legally dispose of it off the property. All recyclable materials shall be hauled to nearest recycling center and any non-recyclable materials shall be hauled to an approved Disposal Site designated by the Contracting Officer Representative. See Division 01 Section “Construction Waste Management and Disposal”.

B. Salvaged Material: All salvaged material remains the property of the Preserve. Store or deliver as directed by the Contracting Office Representative r.

END OF SECTION

SECTION 02 41 10 – BUILDING DEMOLITION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Selective salvage

2. Selective demolition.

B. Related Sections:

1. Section 01 73 29: “Cutting and Patching.”

2. Section 02 41 91: “Selective Historic Demolition.”

3. Section 31 10 00: “Site Clearing.”

4. Section 31 20 00: “Earth Moving.”

1.2 DEFINITIONS

A. Remove: Where word “remove” or a remove indication occurs on drawings, or is referred to, it shall mean removal from site, unless it is specified that material or equipment shall be re-used in project or delivered to NPS.

B. Salvage and Return to NPS: To detach items from existing construction and deliver them to the NPS ready for reuse.

C. Salvage for Reuse/Reinstallation: To detach items from existing construction, store in protected place, repair and prepare them for reuse, and reinstall them where indicated.

1.3 SUBMITTALS

A. Schedule:

1. Describe demolition, removal procedures, sequence and schedule.

2. Include schedule for shutting off and capping utilities and re-establishing utility services.

1.4 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with safety requirements for demolition, ANSI A10.6-90.

B. Contractor shall be responsible for repair/replacement of undocumented damage.

1.5 PROJECT/SITE CONDITIONS

TAPR – 227638/233366

02 41 10 - 1

BUILDING DEMOLITION

A. Occupancy:

1. Buildings and other structures to be demolished will be vacated and use discontinued prior to start of work.

B. Condition of Structures:

1. Park staff assume no responsibility for actual condition of items or structures to be demolished.

2. Conditions existing at time of inspection for bidding purposes will be maintained by park staff in so far as practicable.

3. Variations within existing structure may occur by park staff removal and salvage operations prior to start of demolition work.

C. Dust:

1. Keep dust to a minimum at removal site and on haul roads.

2. Use sprinklers or water trucks as necessary.

D. Safety:

1. Ensure safety of persons in demolition area.

2. Provide temporary barricades as required.

PART 2 – PRODUCTS

2.1 MATERIALS

A. Refer to Section 31 20 00, “Earth Moving.”

B. Native soils, stone, gravel, or sand, free from debris, frozen materials, and roots and other organic matter.

C. Pieces of concrete and masonry smaller than 1 SF and suitably shaped for compaction may be used in backfill.

PART 3 - EXECUTION

3.1 PREPARATION

A. Provide, erect, and maintain temporary barriers and security devices.

B. Notify adjacent owners of work which may affect their property, potential noise, utility outage, or disruption.

C. Coordinate with Contracting Officer Representative.

D. Provide bracing and shoring to prevent movement or settlement of adjacent structures.

E. Protect existing landscape, structure, and finishes which are not to be demolished.

F. Protect all existing floors, over which workmen or equipment will travel, by a suitable covering.

G. Erect and maintain weatherproof closures for exterior openings.

H. Erect and maintain temporary partitions to prevent spread of dust, odors and noise.

I. Protect existing items which are not indicated to be removed.

J. Coordinate proposed methods and operations of demolition with Contracting Officer Representative prior to start of demolition.

L. Coordinate with Contracting Officer Representative for shut-off, capping, and continuation of utility services as required.

3.2 DEMOLITION REQUIREMENTS

A. Conduct demolition to minimize interference with adjacent building areas, public and private accesses.

B. Maintain egress and access at all times.

C. Do not close or obstruct roadways or sidewalks without permits.

D. Cease operations immediately if adjacent structures appear to be in danger and notify Contracting Officer Representative.

3.3 DEMOLITION

A. Selectively remove items:

1. Membrane roofing at main roof (Keynote 1, A1.3)

2. Ballasted asphaltic roofing at tower roofs (Keynote 2, A1.3)

3. Concrete steps (Keynote 3, A1.0/A1.1)

4. Concrete pavers (Keynote 10, A1.1)

5. Select concrete slab (Keynote 26, A1.0)

6. Select downspouts and gutters (Keynote 4, A1.0/A1.1, Keynote 14, A1.1, Keynote 15, A1.2, Keynotes 5 and 7, A1.3)

7. Select finishes and plaster to route conduit (Keynote 37, A1.0/A1.1)

8. Select mechanical and electrical equipment, flue, conduit, as noted.

9. Others, as noted.

B. Demolish components indicated in an orderly and careful manner.

E. Rough grade and compact areas affected by demolition to provide subgrade for removed and replaced material.

F. Selective Building Demolition:

1. Provide temporary supports and protection for portion of structure to remain.

2. Protect fixtures and equipment to remain.

3. Protect nearby structures and vegetation as necessary.

4. Cap or disconnect utilities.

5. Provide bypass connections as necessary to maintain utility service to occupied areas of building.

6. Work systematically from top downward.

7. Demolish concrete and masonry in small sections.

8. Avoid excessive loads on supporting walls, floors, and framing by careful location of equipment and prompt removal of demolished materials.

9. Demolish and remove wood or metal construction below grade.

10. Fill voids to grade.

3.4 RESTORATION

A. Backfilling:

1. Ensure that areas to be filled are free from standing water, frost, frozen material, and debris.

2. Place backfill materials in horizontal layers not exceeding 6 inches in loose depth.

3. Compact each layer, at optimum moisture content to a density equal to surrounding ground.

4. Distribute concrete and masonry pieces in fill material in a way that ensures adequate compaction and at a depth that will not interfere with new construction and grading.

B. Grading Restored Areas: Grade surface to blend with original contours and provide free drainage flow.

C. Restore utility service to normal operation.

3.5 DISPOSAL

A. Dispose of unsuitable and excess material in an approved manner.

3.6 SALVAGED ITEMS

A. Remove, store, and protect following materials and equipment to be reused in new construction. See also 02 41 91.

1. Limestone steps (Keynote 5, A1.0/A1.1).

2. Limestone pavers (Keynote 1, A1.0, Keynote 11, A1.1).

3. Select wood flooring/steps (Keynote 25 & 36 & 38, A1.0)

4. Stones in foundation wall to be removed and reconstructed (Keynote 7, A2.2 & A5.1)

5. Storage location shall be determined with the Contracting Officer Representative during the preconstruction meeting.

B. Perform all work carefully and in a manner so as not to shatter, loosen, crack, or otherwise damage other existing or new work and property which is not to be removed.

3.7 CLEANING

A. Remove demolished materials from site as work progresses.

B. Leave areas of work in clean condition.

C. Repair existing or new work which is not to be removed and which is damaged due to Contractor’s operations, by and at expense of Contractor.

END OF SECTION 02 41 10

SECTION 02 41 91 - SELECTIVE HISTORIC DEMOLITION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Selective historic demolition work and storing salvaged materials.

B. Related Sections:

1. Section 01 35 91: “Historic Preservation Treatment Procedures.”

2. Section 01 73 29: “Cutting and Patching.”

3. Section 31 10 00: “Site Clearing.”

1.2 DEFINITIONS

A. Remove: Where word “remove” or a remove indication occurs on drawings, or is referred to, it shall mean removal from site, unless it is specified that material or equipment shall be re-used in project or delivered to NPS.

B. Salvage and Return to NPS: To detach items from existing construction and deliver them to the NPS ready for reuse.

C. Salvage for Reuse/Reinstallation: To detach items from existing construction, store in protected place, repair and prepare them for reuse, and reinstall them where indicated.

1.3 SUBMITTALS

A. Schedule:

1. Mandatory pre-construction meeting with Contracting Officer Representative and park representatives to review all demolition work.

2. Describe demolition, removal procedures, sequence and schedule.

3. Include schedule for shutting off and capping utilities and re-establishing utility services.

B. Shop Drawings:

1. Plans and details of protection measures for building elements protected in situ. Must be reviewed and approved by the CO prior to installation of protection and start of demolition.

1.4 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with safety requirements for demolition, ANSI A10.6-90.

B. Contractor shall be responsible for repair/replacement of undocumented damage.

TAPR – 227638/ 233366

02 41 91 - 5

SELECTIVE HISTORIC DEMOLITION

1.5 PROJECT/SITE CONDITIONS

A. Dust: Keep dust and dirt pollution to a minimum.

B. Safety:

1. Ensure safety of persons in demolition area.

2. Provide temporary barricades as required.

3. Provide adequate fire protection.

4. Keep clear of hazardous substances and debris.

5. Maintain access to exits at all times.

1.6 SCHEDULING

A. Complete demolition that might damage new construction before starting new work.

PART 2 – PRODUCTS (NONE) PART 3 - EXECUTION

3.1 PREPARATION

A. Provide temporary supports and protection for parts of structure to remain.

B. Provide temporary closures for openings made in exterior walls and roofs.

C. Protect nearby structures and vegetation as necessary.

D. Cap or disconnect utilities.

E. Provide protection prior to demolition and during construction for the following items:

1. Heater in Room 305.

2. Light fixtures and ceiling fans.

3.2 REMOVAL

A. Remove items or materials in inverse order of that used in placing.

B. Methods will be changed by Contracting Officer Representative as necessary.

C. Carefully remove or cut fabric in presence of Contracting Officer Representative.

D. Take every precaution to prevent damage to salvaged items, existing structures and surrounding areas.

E. No flame cutting, vibrating equipment, or explosives will be permitted.

F. Should accidental damage occur, promptly repair damaged area to satisfaction of Contracting

Officer at no additional expense to Government.

G. It may be necessary to halt work temporarily for architectural or archeological investigation as previously inaccessible areas are exposed.

H. Contractor shall work elsewhere on project while investigation is conducted, when possible.

3.3 IDENTIFICATION AND DOCUMENTATION

A. As each section of historic fabric is removed, Contracting Officer Representative will record the date, location, dimensions, origin, and original use.

3.4 SALVAGE

A. Historic materials to be Salvaged for Reuse:

1. Limestone steps (Keynote 5, A1.0/A1.1).

2. Limestone pavers (Keynote 1, A1.0, Keynote 11, A1.1).

3. Select wood flooring/steps (Keynote 25 & 36 & 38, A1.0)

4. Stones in foundation wall (Keynote 7, A2.2 & A5.1)

B. Historic items to be Salvaged and Return to NPS:

1. Window 214: frame, glazing, sash, hardware (Keynote 32, A1.1)

2. Paneling below Window 214 (Keynote 32, A1.1, A1.5)

3. Sash from Window 111 (Keynote 24, A1.0)

4. Damaged limestone blocks at window well (Keynote 44. A1.1)

5. Window 105-108: lower panes (Keynote 51/A1.4)

6. Door 202B and 204 and jamb material as detailed (Keynote 22/A1.5)

7. Door 101 hardware and hinges (Keynote 49, A1.4)

8. Window 101: exterior quarter round trim (Keynote 6, A2.3)

9. Any removed stones from cellar light wells (Keynote 13, A 3.0 and 26, A7.1)

C. Carefully clean and store materials and items to be salvaged or reused.

D. Items to be salvaged or reused shall be stored on-site where directed by Contracting Officer Representative.

3.5 BELOW GRADE AREAS AND VOIDS

A. Fill voids resulting from demolition work as directed by Contracting Officer Representative.

3.6 RESTORATION

A. Repair adjacent surfaces damaged or soiled by demolition work.

B. Restore utility services to normal operation.

C. Remove equipment, temporary protection and barriers, and debris and rubbish.

D. Dispose of unsalvageable materials.

3.7 CLEANING

A. Remove demolished materials from site as work progresses.

B. Leave areas of work in clean condition.

C. Repair existing or new work which is not to be removed and which is damaged due to Contractor’s operations, by and at expense of Contractor.

END OF SECTION 02 41 91

SECTION 02 61 00 - REMOVAL AND DISPOSAL OF LEAD CONTAMINATED SOILS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E1727 (2016) Standard Practice for Field Collection of Soil Samples for Subsequent Lead Determination

U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (HUD)

HUD 6780 (1995; Errata Aug 1996; R 2012) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.120 Hazardous Waste Operations and Emergency Response

29 CFR 1926.62 Lead

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 268 Land Disposal Restrictions

40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential Structures

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 178 Specifications for Packagings

1.2 DEFINITIONS

1.2.1 Lead

TAPR 227638/233366 SPRING HILL RANCH HOUSE

02 61 00 – 9

REMOVAL AND DISPOSAL OF LEAD CONTAMINATED SOILS

Metallic lead, inorganic lead compounds, and organic lead soaps. Excludes other forms of organic lead compounds.

1.2.2 Lead Contaminated Soil

Bare soils containing concentrations greater than 400 parts per million (ppm) total lead in play areas or 1,200 ppm total lead in non-play areas 40 CFR 745. Renoval and confirmatory sampling will be based on the assumption that excavation areas contain only bare soil.

1.2.3 Material Containing Lead/Paint with Lead (MCL/PWL)

Any material, including paint, which contains lead as determined by the testing laboratory using a valid test method. All MCL/PWL on the exterior will be remediated prior to remediation of lead-contaminated soil. An X- Ray Fluorescence (XRF) instrument is not considered a valid test method for establishing the concentration of lead in soil.

1.2.4 Lead Control Area

A methods to prevent the spread of lead-contaminated soil to adjacent areas that may include temporary containment, ground cover protection, physical boundaries, and warning signs to prevent unauthorized entry of personnel.

1.3 DESCRIPTION OF WORK

The work includes removal and disposal of lead-contaminated soil. Perform work in accordance with 40 CFR 745, 29 CFR 1910.120, HUD 6780, and the requirements specified herein. Excavate to the horizontal and vertical limits of the contaminated soil. After removing contaminated soil, conduct confirmatory sampling, and reexcavate as necessary until soil meeting requirements of Paragraph 1.02B are encountered.

1.3.1 Protection of Existing Areas

All project work including, but not limited to work, storage, transportation, and disposal of lead-contaminated soil shall be performed without damaging or contaminating adjacent areas. Where such areas are damaged or contaminated, restore areas to the preconstruction condition.

1.4 QUALITY ASSURANCE

1.4.1 Qualifications

1.4.1.1 Transportation and Disposal Coordinator

Designate, by position and title, one person to act as the Transportation and Disposal Coordinator (TDC) for this contract. The TDC shall serve as the single point of contact for all environmental regulatory matters and shall have overall responsibility for total environmental compliance at the site including, but not limited to, accurate identification and classification of hazardous waste and hazardous materials; determination of proper shipping names; identification of marking, labeling, packaging and placarding requirements; completion of waste profiles, hazardous waste manifests, bill of ladings, exception and discrepancy reports; and all other environmental documentation. The TDC shall have, at a minimum, one year of specialized experience in the management and transportation of hazardous waste and have been Department of Transportation certified under 49 CFR 172, Subpart H.

1.4.1.2 Training Certification

Submit a certificate for each worker and supervisor, signed and dated by the training provider, stating that the employee has received the required lead training specified in 29 CFR 1926.62(l).

1.4.1.3 Testing Laboratories Certification

The laboratory selected to perform analysis on dust wipe, paint chip and confirmatory soil samples shall be recognized by the EPA's National Lead Laboratory Accreditation Program (NLLAP).

1.4.2 Requirements

Work shall meet or exceed the minimum requirements established by Federal, state, and local laws and regulations which are applicable. These requirements are amended frequently and compliance with amendments is required as they become effective. In the event that compliance exceeds the scope of work or conflicts with specific requirements of the contract, notify the Contracting Officer Representative immediately.

1.5 PLANNING DOCUMENTS

1.5.1 Lead-Contaminated Soil Removal and Disposal Plan

Prepare and submit, 15 calendar days prior to initiating work, a detailed job-specific plan of the work procedures to be used in the removal of lead-contaminated soil and restoration of disturbed areas. Ensure that work operations or processes involving lead-contaminated materials are conducted in accordance with 40 CFR 745.

The work plan shall include but not be limited to:

1.5.1.1 Removal

a. Description of work to be performed and procedures that will be used.

b. Site preparation procedures prior to the start of excavation including temporary relocation of vegetation to be saved, removal and disposal of vegetation to be disposed, establishment of temporary controls and monitoring systems.

c. Removal locations as shown on Contract Drawings. Excavate to a depth of 6 inches below the ground surface, perform confirmatory sampling and reexcavate as necessary to achieve limits.

1. Where soil is next to foundation, excavation areas shall extend a minimum of 3 feet from the foundation.

2. Where a concrete or other paved walkway is located adjacent to foundation, sampling area shall extend 1 foot from on the outer edge of the pavement.

3. Excavate a 5 by 5 foot area at the end of concrete down spouts troughes.

4. Remove turf mats located at discharge points for storm sewer lines prior to excavation. Replace turf mats following excavation.

d. A sketch showing the location, size, and details of lead control areas. Include a detailed description of the method of containment of the operation to ensure that lead contamination is not spread or carried outside of the control area.

e. Sequence of operations and schedule of removal.

f. Method of removal and a list of proposed equipment. Method of removal shall account for working around existing structures and protection of existing structures.

f. Personal protective equipment such as respirators or other protective equipment necessary for performance of work.

h. Air sampling program including, training and strategy, sampling methodology, frequency, duration of sampling, and qualifications of air monitoring personnel.

i. Names and qualifications (experience and training) of personnel who will be working on-site with lead- contaminated soils.

j. Estimated quantity of soil to be generated and disposed of.

k. Procedures for restoration of each area following completion of excavation including soil replacement and revegetation. Procedures for restoration of turf mats disturbed during excavation.

1.5.1.2 Processing/Transport/Disposal

a. Description of work to be performed (both on-and off-site) during processing, transport, and disposal of lead- contaminated soil and procedures that will be used.

b. Description and use of on-site processing facilities, if any.

c. Waste characterization sampling and analysis for stabilization (if applicable) and disposal procedures if applicable.

d. Names and qualifications of each contractor that will be responsible for processing, transporting, storing, treating, and disposing of the lead-contaminated soil.

e. Name and location of disposal and/or processing facility off-site locations and a 24-hour point of contact. Documentation that facility(ies) is permitted to handle lead contaminated soil at the anticipated concentrations.

f. Site restoration procedures including identification of the Contractor's source for fill and method for importing the fill material.

g. Spill prevention, containment, and cleanup contingency measures to be implemented.

1.5.2 Confirmatory Sampling Plan

The Contractor shall prepare and submit a confirmatory sampling plan for the sampling and analysis of soil samples to be collected around the perimeter of the Spring Hill Ranch House following initial excavation. The purpose of the sample is to confirm that following excavation, remaining soil does not exceed the limits specified in Paragraph 1.02B. Sampling shall conform to ASTM E1727 and the applicable requirements of this section, including, but not limited to:

1. Samplings areas are shown on the Contract Drawings. Samples should be collected in each area in a gridded pattern.

a. One sample per each location at end of drain spouts or in turf mat areas.

b. One sample approximately every 5 feet around the foundation perimeter.

2. Description of confirmatory sampling program, procedures, and methods.

a. Confirmatory sampling grid.

b. Minimum number of samples to be taken.

c. Number of samples to be taken for quality assurance and quality control purposes.

d. Standard operating procedures for collecting and managing samples.

e. Samples shall be collected as grab samples; compositing of samples shall not be allowed.

3. Names of testing laboratories to be used to analyze contaminated soil.

4. Laboratory sampling procedures, testing methods, and quality control procedures.

5. Sample analytical reports, which show sample identification for location, date, time, sample method, contamination level, name of individual sampler, identification of laboratory, and quality control procedures.

6. Final report and recommendations analyzing the results of the confirmatory sampling and identification of areas requiring reexcavation.

7. Maximum turnaround time of 15 business days is required for laboratory sample analyses in accordance with the standard work week of the contract.

1.5.3 Dust Control Plan

The Contractor shall submit a dust control plan to be used throughout the work at the site. The Dust Control Plan shall identify materials, equipment, and methods to be used to monitor and control dust during project operations. The SSHO shall ensure that dust suppression practices are effective and being used. At a minimum, the following provisions shall be incorporated into the Dust Control Plan as follows:

1. The use of real-time airborne monitoring equipment to measure dust levels along the perimeter of the soil removal and at the site perimeter.

2. The Contractor shall implement dust control measures during all activities that may potentially generate airborne dust including, but not limited to, excavation, soil handling and processing, truck loading and transport. Visible, airborne dust shall be minimized at all times. The Contractor shall cease all dust generating activities when the wind speed, as measured by the on-site meteorological station, exceeds 15 mph for a sustained period of 15 minutes. Potential dust generating activities may resume based on the determination of the SSHO.

3. The Contractor shall provide and use water as a dust-suppressing agent to prevent the creation and dispersion of dust. The Contractor shall avoid methods or application rates that generate slippery conditions or sticky mud.

4. Trucks in which contaminated soil are carried shall be covered and sealed to control dust releases with a double, positive locking mechanism on the tailgates.

5. Stock piles shall be covered at all times when not in use.

The SSHO shall ensure that dust suppression practices are effective and being utilized.

1.5.4 Soil Erosion Control Plan

Develop and implement a soil erosion control plan that identifies materials, equipment and methods to be used to control erosion in disturbed areas during project operations

1.5.5 Closeout Report

Prepare closeout report containing the following items:

1. Initial soil sampling test results and locations.

2. Drawing of the removal area(s) with sample locations indicated (indicate reference benchmark used). Also indicate depth of excavation performed.

3. Chain of custody forms for confirmatory sampling and waste characterization sampling.

4. Results of confirmatory sampling.

5. Results of waste characterization sampling.

6. Description of work completed including the on-site processing of excavated soil (if any), handling and transportation procedures, and disposal site.

7. Certificates of disposal.

8. Truck manifests.

1.6 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-05 Design Data

Lead-Contaminated Soil Removal and Disposal Plan; G Confirmatory Sampling Plan Dust Control Plan

Soil Erosion Control Plan SD-07 Certificates Training Certification

Testing Laboratories Certification Certificate of Disposal SD-11 Closeout Submittals Closeout Report; G Hazardous Waste Manifest; G

PART 2 PRODUCTS NOT USED

PART 3 EXECUTION

3.1 PRE-ENTRY BRIEFING

Prior to commencement of onsite field activities, all site employees, including those assigned only to the Support Zone, must attend a site-specific safety and occupational health training session. This session will be conducted by the Safety and Health Manager and the Site Safety and Health Officer (SSHO) to ensure that all personnel are familiar with requirements and responsibilities for maintaining a safe and healthful work environment.

3.2 WORK PROCEDURES

Perform work following practices and procedures in project work plans and the occupant protection plan.

3.2.1 Lead Hazard Control Areas, Equipment and Procedures

Set up lead hazard control areas and operate equipment within the lead hazard control area in a manner that will minimize migration of lead dust beyond the lead hazard control area boundaries.

3.2.2 Lead Hazard Access Control

Access into lead hazard control areas by the general public shall be prohibited and controlled. Lead hazard control area preparation and restriction requirements follow:

1. Containment features for exterior lead hazard control projects: A roped-off boundary perimeter, using caution tape or a barrier installed at a minimum 50 foot distance from equipment work areas.

2. In areas where general public may be present, temporary fencing should be installed to control access to the area(s).

3.3 SOIL REMOVAL PROCEDURES

Notify the Contracting Officer Representative at least 48 hours prior to the start of removal of contaminated soils. Use methods and equipment in accordance with the Lead-Contaminated Soil Removal and Disposal Plan that result in minimal disturbance to remaining soil beyond the excavation limits.

a. Remove and dispose of any material that becomes contaminated as a result of the Contractor's operation at no additional cost to the Government.

b. Stage operations to minimize the time the contaminated soil is exposed to the weather.

c. Cover open areas when precipitation or high winds are presented or expected and at the end of each day's work.

d. Provide protection measures around the area of contaminated soils to divert runoff of water from within the excavation boundaries.

e. Restore areas to preconstruction conditions as soon as possible after excavation. Contractor is responsible for maintaining all protective measures in place under site is fully restored.

3.3.1 Sampling After Removal

Perform confirmatory soil sampling in accordance with approved Confirmatory Sampling Plan. Use procedures and equipment required to limit occupational exposure and environmental contamination with lead when the work is performed in accordance with 29 CFR 1926.62 and 40 CFR 745, and as specified herein. Dispose of all lead- contaminated soil and associated waste in compliance with federal, State, and local requirements. All samples must show that the soil meets the requirements in Paragraph 1.02B for work to be accepted by the Contracting Officer Representative.

3.3.2 Cleanup

Maintain surfaces of the lead control area free of accumulations of lead. Restrict the spread of dust and soil; keep waste from being distributed over work area. Do not remove the lead control area and warning signs prior to the Contracting Officer Representative's Representative approval.

3.4 TRANSPORTATION AND DISPOSAL

Furnish labor, materials, and equipment necessary to store, transport, and dispose of lead contaminated material in accordance with Federal, State, and local requirements. Prepare and maintain waste shipment records and manifests required by the Resource Conservation and Recovery Act (RCRA), U.S. Federal Department of Transportation (DOT), and State transportation department.

3.4.1 Transportation

Use manifests for transporting hazardous wastes as required by 40 CFR 263 or any applicable state or local law or regulation. Transportation shall comply with all requirements in the Department of Transportation referenced regulations in the 49 CFR series. Prepare hazardous waste manifests for each shipment of hazardous waste shipped offsite. Manifests shall be completed using instructions in 40 CFR 262, Subpart B and any applicable state or local law or regulation. Submit manifests and waste profiles to Contracting Officer Representative for review and approval. Prepare land disposal restriction notifications as required by 40 CFR 268 or any applicable state or local law or regulation for each shipment of hazardous waste. Submit notifications with the manifest to the Contracting Officer Representative for review and approval.

3.4.2 Disposal

1. All material shall be disposed in accordance with all laws and provisions and all federal, State or local regulations.

2. Ensure all waste is properly characterized based on TCLP analysis of the excavated material. Testing frequency will be in accordance with disposal facility requirements.

3. Soil will require stabilization prior to disposal. This may be performed on-site or at a permitted off-site processing facility. Once stabilized, contaminated soil may be disposed at a RCRA Subtitle D facility if allowed in the facility's operating permit.

4. Contractor is responsible for segregation of waste as required by the disposal facility. Collect lead- contaminated waste, scrap, debris, bags, containers, equipment, and lead-contaminated clothing that may produce airborne concentrations of lead particles. Label the containers in accordance with 29 CFR 1926.62 and 40 CFR 261.

5. Dispose of lead-contaminated material classified as hazardous waste at an EPA approved hazardous waste treatment, storage, or disposal facility off Government property.

6. Store waste materials in U.S. Department of Transportation (49 CFR 178) approved 55 gallon drums or approved sealed containers. Properly label each drum or container to identify the type of waste (49 CFR

172) and the date the drum or container was filled. For hazardous waste, the collection drum or container requires marking/labeling in accordance with 40 CFR 262 during the accumulation/collection timeframe. Until waste is characterized, handle all excavated soil as a hazardous waste. The Contracting Officer Representative or an authorized representative will assign an area for interim storage of waste-containing drums or containers. Do not store hazardous waste drums in interim storage longer than 90 calendar days from the date affixed to each drum.

7. Handle, store, transport, and dispose lead-contaminated soil waste in accordance with 40 CFR 260, 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, and 40 CFR 265. Comply with land disposal restriction notification requirements as required by 40 CFR 268.

3.4.2.1 Certificate of Disposal

Submit certificate of disposal to demonstrate the waste treatment, storage, or disposal facility (TSD) is approved for lead disposal by the EPA, State or local regulatory agencies. Submit one copy of the completed hazardous waste manifest or bill of lading (depending on facility and waste characteristics), signed and dated by the initial transporter in accordance with 40 CFR 262. Contractor shall provide a certificate that the waste was accepted by the disposal facility.

3.5 REPORTS

Prepare and submit a remediation closeout report at the completion of the work.

END OF SECTION 02 61 00

SECTION 02 81 01 - OFF-SITE TRANSPORTATION AND DISPOSAL

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes requirements for off-site transportation and disposal of materials generated during removal of structures associated with this Project.

B. The Contractor shall be responsible for sampling, analysis, and characterization of waste materials to be shipped off-site for disposal or recycling as required by the Treatment Storage and/or Disposal Facility.

C. It shall be the Contractor’s sole responsibility to obtain temporary EPA ID number(s) on behalf of the NPS for hazardous waste materials generated and removed from the site(s) during execution of this project. The Contracting Officer Representative will identify appropriate NPS individuals to sign the required paperwork as the generator signatory for the project.

D. Off-site recycling and disposal facilities shall be approved by the Contracting Officer Representative prior to off-site transportation of materials.

E. Transportation of materials shall comply with legal load restrictions of the Kansas Department of Transportation (KDOT).

1.2 RELATED SPECIFICATIONS

A. Section 01 74 19: “Construction Waste Management and Disposal”.

B. Section 02 83 13: “Lead Base Paint Abatement”.

C. Section 02 61 00: “Removal and Disposal of Lead Contaminated Soil”.

1.3 SUBMITTALS

A. The Contractor shall include as a component of the Waste Management Plan (described in Section 01 74 19 “Construction Waste Management and Disposal") a description of planned means and methods for transporting and disposing of all waste materials removed or generated during the Project.

B. Permit profile of the Treatment Storage and/or Disposal Facility.

C. The Contractor shall provide original and/or carbon copies of all Bills of Lading and Manifests for all transported waste material loads from the site with all required generator, transporter, and waste disposal facility receipt/transfer signatures included. These documents shall be provided to the Contracting Officer Representative at a minimum on a weekly basis and be accompanied by a detailed electronic waste tracking sheet. The waste tracking sheet shall be cumulative and updated on a

TAPR 227638/233366 SPRING HILL RANCH HOUSE

02 81 01 - 3

OFF-SITE TRANSPORTATION AND DISPOSAL

weekly basis. This document shall provide the following information:

1. Cumulative load numbers for each shipment,

2. A description of the waste material being shipped for disposal,

3. Company transporting the waste material,

4. Estimated waste volumes for each shipment,

5. Certified weight slips for each shipment,

6. The disposal facility of record for each waste stream, and

7. The specific Manifest or Bill of Lading specific identifier number for the load being shipped for disposal.

D. At the conclusion of the project all waste disposal information collected shall be submitted to the Contracting Officer Representative as an electronic deliverable package as part of the required project closeout record documentation. Payments to the Contractor for waste transportation disposal fees will not be approved without completed disposal tracking documents as described above are received by the Contracting Officer Representative.

1.4 WASTE CONTAINERS

A. The Contractor shall provide waste containers specific to the individual waste to be handled.

1.5 TRANSPORTATION OF WASTES

A. The Contractor shall be responsible for transportation of all wastes generated during the Project that cannot be salvaged, re-used, or recycled. This includes materials generated by final site cleanup activities and the dismantling of the temporary facilities and controls.

B. The Contractor shall be responsible for coordinating the number and schedule of vehicles required for off-site transportation of waste materials generated during execution of the Project.

C. The Contractor shall be responsible to inspect the transportation vehicles before and after loading to ensure compliance with all local, State, and Federal regulations for the safe transport of wastes from the Site to the receiving facility. The Contractor shall provide the necessary labor and materials to insure all trucks and containers are covered prior to departure.

D. The Contractor shall insure that the transporters arriving at the site for loading do not cause undue congestion to local roadways, and shall stage trucks either within the perimeter of the site or at an off-site staging area approved by the Contracting Officer Representative.

E. The Contractor's transporters shall proceed directly from the site to a designated staging area or the designated off-site receiving facility. Temporary staging or storage of material shall only be allowed at designated staging areas approved by the Contracting Officer Representative.

F. The Contractor shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .