This document appears to be an attachment containing questions and answers related to Amendment 1 of Solicitation 140P5424R0015 for Roof Replacements at the CASA and FOMA sites for the Department of the Interior National Park Service Southeast Region.
The key details include specifications for the roofing materials, such as the required profile, gauge, substrate, and coatings for the standing seam metal roof at Fort Matanzas, as well as guidance on the Brava shake roof at Castillo. The agency clarifies that the existing gutters should be reused with care, and provides details on the preferred fastener type, underlayment, and valley installation methods. The document also addresses staging areas, access to the maintenance building, and the handling of the restroom facility during construction. Lastly, it provides information on warranty requirements, color preferences, and installation instructions for the Brava shake roof.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5424R0015_Amd_0001.pdf | ||
| Atch_2_DBA_WD_St_Johns_County.pdf | ||
| Atch_1_SOW.pdf | ||
| Atch_3_Site_Visit_Info.pdf | ||
| Sol_140P5424R0015.pdf | ||
| Atch_4_Photos.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P5424R0015 Amendment 1 Attachment 1
Question #1: Regarding the Brava Shake, is this guideline is a strict guideline, or if would be possible to use the traditional Grade A Blue Label Cedar Shakes which the National Parks normally uses for these types of looks?
Answer: The solicitation does say “or approved equal”, but the NPS would not consider a traditional cedar shake comparable. With the composite, there is a 10 to 15 year longer life expectancy, composite usually costs less, requires less maintenance, and it does not lose it's color/newer look like the natural shingles.
Question #2: Your posted package shows the approximate squares of each of the buildings. Is the pitch and waste factored into the amount of squares listed for each building?
Answer: Per the statement of work, "Measurements and quantities are approximations and offerors must field verify all proposed dimensions and materials necessary before submitting a proposal."
Question #3: Does the NPS want new gutters with each building as well?
Answer: No. Extreme care should be exercised not to damage existing gutters. Any damage resulting from the contractor's operation shall be repaired and/or replaced with like-in-kind material at the approval of the COR, at no additional cost to the Government.
Question #4: What gauge does the NPS prefer for the metal roof? 24 gauge? 26 gauge?
Answer: 24 gauge for steel and 0.040 inch thick for Aluminum and Aluminum-Alloy
Question #5: Are you looking for steel, or aluminum? The reason I ask is because aluminum will be the only panel That carries a warranty that is close to water.
Answer: Per the statement of work, the roofing material at Castillo must be weathered shake to match the HQ building roof. At Fort Matanzas Restrooms – a warranty period will be an evaluation factor in the choice of material for the metal roof. Provide warranty data with material option (s). Additionally, provide the cost and benefits for each type of material you include in your estimate(s). (Florida's coastal areas also pose a challenge with salt-laden air, which can accelerate corrosion. The FBC requires that metal roofing materials used in these areas be corrosion-resistant. This often means using materials like aluminum, zinc-coated steel, or stainless steel, and ensuring proper coatings are applied to prevent rust and corrosion over time. ***Include these details in Volume II, Tab 4 of your proposal***
Question #6: Can you specify underlayment type?
Answer: The underlayment type shall meet the Florida Building Code and be installed in accordance with both the underlayment manufacturers and roof covering manufacturer’s installation guide/instructions. Include material details in your estimate so the NPS can verify recommended material with the roof covering manufacturer and Florida Building Code***Include these details in Volume II, Tab 4 of your proposal***
Question #7: Can you specify the fastener type (stainless steel or galvanized)?
Answer: No. Dependent on manufacturer and Florida Building Code.
Example :
Standard Fasteners (Brava) All shakes should be installed with two corrosion resistant fasteners of sufficient length to penetrate no less than 3/4-inches into the deck or completely through the roof deck. Ring shank roofing nails or screws may be used depending on application and code requirements. Brava recommends using screws whenever high winds are typical. Always ensure fasteners are in compliance with building codes and design requirements and that corrosion protection is sufficient for regional conditions.
Florida's coastal areas also pose a challenge with salt-laden air, which can accelerate corrosion. The FBC requires that metal roofing materials used in these areas be corrosion-resistant. This often means using materials like aluminum, zinc-coated steel, or stainless steel, and ensuring proper coatings are applied to prevent rust and corrosion over time.
Question #8: Can you specify valley installation method (open or closed) and preference for type of metal to be used?
Answer: The valley installation method shall meet the Florida Building Code and be installed in accordance with the roof covering manufacturer’s installation guide/instructions.
Question #9: Can you specify profile, gauge, substrate (aluminum or galvalume), and coating type for standing seam metal roof?
Answer:
- Profile – none specified (provide the most common house profiles for this area in your bid).
- Guage – 24 gauge for steel and 0.040 inch thick for Aluminum and Aluminum-Alloy
- Substrate - The substrate type shall meet the Florida Building Code and be installed in accordance with the roof covering manufacturer’s installation guide/instructions. Include material details in your estimate so the NPS can verify recommended material with the roof covering manufacturer and Florida Building Code.
- Coating Type - Florida's coastal areas also pose a challenge with salt-laden air, which can accelerate corrosion. The FBC requires that metal roofing materials used in these areas be corrosion-resistant. This often means using materials like aluminum, zinc-coated steel, or stainless steel, and ensuring proper coatings are applied to prevent rust and corrosion over time. (Include the recommended coating in your proposal)
Applicable building codes shall be followed, and all products shall have Florida Building Code
Product Approvals. Additionally, provide the cost and benefits for each type of material you include in your estimate(s).
Question #10: Should our proposal include removing the gutters, replacing the roof and re-installing the gutters?
Answer: Extreme care should be exercised not to damage existing gutters. Any damage resulting from the contractor's operation shall be repaired and/or replaced with like-in-kind material at the approval of the COR, at no additional cost to the Government.
Question #11: Regarding the Roofs at CASA, is the metalwork needing to be copper due to the proximity of the building to saltwater? (Valleys and Drips).
Answer: Florida's coastal areas also pose a challenge with salt-laden air, which can accelerate corrosion.
The FBC requires that metal roofing materials used in these areas be corrosion-resistant. This often means using materials like aluminum, zinc-coated steel, or stainless steel, and ensuring proper coatings are applied to prevent rust and corrosion over time.
Attachment 1
Question #12: Regarding the Roofs at CASA, if there are battens should we assume it’s coming off, and is a self-adhered high temp underlayment required to be reinstalled?
Answer: We cannot assume. That is not known. The underlayment type shall meet the Florida Building Code and be installed in accordance with both the underlayment manufacturers and roof covering manufacturer’s installation guide/instructions. Include material details in your estimate so the NPS can verify recommended material with the roof covering manufacturer and Florida Building Code
Question #13: Regarding the roofs at FOMA, what type and gauge of metal is required, is this going to be steel or aluminum, what finish.
Answer: See Question #5 & #9
Question #14: Regarding the roofs at FOMA, what is the height of the seam and the width of the panel?
Answer: -Provide the recommended height of seam and width of the panel in your proposal. Applicable building codes shall be followed, and all products shall have Florida Building Code Product Approvals
Question #15: Regarding the roofs at FOMA, is 040 aluminum what is required for thickness?
Answer: Yes
Question #16: Regarding the roofs at FOMA, would the Government like to price this roof with Brava to match? The Brava warranty lasts for 50 years and looks exactly like what is existing.
Answer: No
Question #17: Regarding the roofs at FOMA, currently the wood shake is on a 7” exposure on wood battens over OSB board, should we assume these battens are coming off?
Answer: Cannot assume. That is not known
Question #18: Regarding the roofs at FOMA, will the bathroom be in use or closed during the construction of the bathroom?
Answer: The bathroom will be in use unless the awardee can justify a reason for closing
Question #19: Regarding both sites, has a laydown area been identified for the construction period?
Answer: The awardee will coordinate the staging area with the COR prior to the delivery of any material or equipment.
Question #20: Could you specify what color the metal roof should be at Fort Matanzas?
Answer: Dark Green
Question #21: Will we be given permission to access the north part of the maintenance building that abuts the Ripley’s museum? There will be a need to setup protection and subsequently clean-up at the end of the day.
Answer: Yes. Access to the north gate will be provided.
Question #22: The ranger stated that the gutters on the Chief of Maintenance building are to remain.
The only issue with that, is that the gutters are connected through the existing drip edge with pins and must be removed for the reroof process. I have never been able to successfully remove pinned gutters without some damage happening to them.
Attachment 1
Answer: The gutters on the HQ building were reused. If you feel they cannot be reused, include them in your bid.
Question #23: What specification will be used for the standing seam metal roof at Fort Matanzas? We will need to know material, (Aluminum or steel), thickness of material, finish of material, and the profile of the metal panels.
Answer:
- Florida's coastal areas also pose a challenge with salt-laden air, which can accelerate corrosion. The FBC requires that metal roofing materials used in these areas be corrosion-resistant. This often means using materials like aluminum, zinc-coated steel, or stainless steel, and ensuring proper coatings are applied to prevent rust and corrosion over time.
- Guage – 24 gauge for steel and 0.040 inch thick for Aluminum and Aluminum-Alloy
- Dark Green color
- Profile – none specified (provide the most common house profiles for this area in your bid).
Question #24: Does the roofing contractor have to be a certified Installer of the Brava Shake?
Answer: No. However, the contractor must follow Brava’s written installation instruction.
Warranty Limitations: Warranty does not apply to, and Brava shall not be liable for:
Improper installation or installation not in strict adherence to Brava’s written installation instructions.
Question #25: What is the color coded spec for the fascia and soffit paint? I am sure that touch up will be required and would like to have that info in advance.
Answer: Color is “Tudor Brown”
Question #26: What Color Brava shake would the DOI like? (the leftover shakes for reference did not have a color code stamped on them) Answer: Color is “Weathered”
Question #27: There are two (2) different exposure shake sizes , an 8in and a 10in. What size exposure shake does the DOI want?
Answer: The same exposure as the Brava roof on the headquarters building. During the site inspection and in the statement of work, it was specified that the roofs should match.
Question #28: Per Brava website , the instructions are to nail each brava down. During the site visit, I spoke to an employee who said he and others did the main building a few years back. He was instructed to screw each Brava shake down. Does The DOI want installation want installation done per instructions from Brava (nailed down) or does DOI want them screwed down ?
Answer:
Standard Fasteners (Brava) All shakes should be installed with two corrosion resistant fasteners of sufficient length to penetrate no less than 3/4-inches into the deck or completely through the roof deck. Ring shank roofing nails or screws may be used depending on application and code requirements. Brava recommends using screws whenever high winds are typical. Always ensure fasteners are in compliance with building codes and design requirements and that corrosion protection is sufficient for regional conditions.
Florida's coastal areas also pose a challenge with salt-laden air, which can accelerate corrosion. The FBC requires that metal roofing materials used in these areas be corrosion-resistant. This often means using materials like aluminum, zinc-coated steel, or stainless steel, and ensuring proper coatings are applied to prevent rust and corrosion over time.
Question #29: The Restroom building at Fort Matanzas National Monument ( Image 8 & 9 In attached photos) Does the DOI want a specific color metal for the roof ?
Answer: Dark Green
Question #30: Are we allowed to bring storage containers on the premises to stow products while doing the job ?
Answer: Yes. A designated area will be provided by the COR prior to delivery.
Question #31: Will the DOI allow for a withdrawal to the awarded company for supplies?
Answer: Yes, once proof of the order is verified.
Note: Any answers or clarifications that add to or change any information currently in the statement of work (SOW) will be incorporated before award. Acknowledgement of these answers demonstrates offeror’s receipt of updated info.