ANJO-REPLACE ELECTRIC SUPPLY WIRE
Solicitation number
140P5326Q0003
Issued by

About this file

This is Amendment 0004 to Solicitation No. 140P5326Q0003, issued by the National Park Service, Southeast Region - North MABO (Gatlinburg, TN) with an effective date of 01/15/2026. The amendment reopens the solicitation and requests revised quotations from prospective contractors for a firm-fixed-price construction contract. Quoters must submit revised quotations or confirm their existing quotation with required supplemental information no later than 02/13/2026 at 1500 ES, with late submissions ineligible for consideration. Award will be made on a Lowest Price Technically Acceptable (LPTA) basis to the responsible quoter whose quotation is determined technically acceptable, with no tradeoffs permitted.

To achieve technical acceptability (Pass/Fail rating), quotations must include three mandatory components: (A) documentation of two completed projects within the last five years relevant to directional drilling and/or underground conduit installation, including customer/owner, scope, location, performance period, and point of contact; (B) identification of whether directional drilling (HDD) will be self-performed or subcontracted, with the subcontractor name if applicable; and (C) a one-page SOW Compliance Checklist explicitly confirming compliance with minimum requirements including electrical conductors (four #4/0 AWG and one #4 AWG ground, THWN-2 copper, continuous run), electrical conduit (2.5" HDPE SDR 11 with tracer wire), telecom conduit (2" HDPE SDR 11 with pull tape and tracer wire), water-based directional drilling fluids with offsite disposal, and basement penetration specifications. Quoters must submit either a revised total lump sum price for CLIN 0001 or confirm that the previously submitted price remains unchanged. The period of performance is 02/17/2026 to 04/04/2026.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

William Leady

See continuation page

NPS, SER - North MABO 107 Park Headquarters Road Gatlinburg TN 37738

PSN

140P5326Q0003

01/15/2026

01/15/2026

1 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P5326Q0003/0004

MENDMENT 0004 ¿ REOPENING / CLARIFICATION OF

QUOTE SUBMISSION REQUIREMENTS; REQUEST FOR

REVISED QUOTATIONS

Reopening / Revised Quotations. The Government hereby amends and reopens Solicitation No.

140P5326Q0003. Quoters shall submit revised quotations (or confirm their existing quotation and provide the required supplemental information) no later than 02/13/2026 at 1500

ES. Late submissions may not be considered.

Basis of Award (LPTA). The Government intends to award a firm-fixed-price construction contract to the responsible quoter whose quotation is determined Technically Acceptable and offers the lowest evaluated total price. No tradeoffs will be made.

Technical Acceptability (Pass/Fail) ¿ Minimum

Quotation Requirements. To be rated Technically

Acceptable (PASS), the quotation must include all items A¿C below. Failure to submit any required item, or failure to meet a minimum requirement, will result in a rating of

Technically Unacceptable (FAIL) and the quotation will be ineligible for award.

Quotations will be evaluated impartially and in accordance with the factors stated in the solicitation.

A. Relevant Experience (PASS/FAIL): Provide two

(2) completed projects performed within the last five (5) years that are relevant to this requirement (directional drilling and/or underground conduit installation to a structure). For each project provide:

customer/owner, brief scope, location, performance period, and a point of contact.

B. HDD Performer Identification (PASS/FAIL):

State whether directional drilling (HDD) will be self-performed or subcontracted. If subcontracted, the quotation shall identify the

HDD subcontractor by name.

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P5326Q0003/0004

C. One-Page SOW Compliance Checklist

(PASS/FAIL): Provide a one (1) page checklist that explicitly confirms compliance with the following minimum requirements (mark ¿Comply¿ or ¿Does Not Comply¿ and include a brief note if needed):

Electrical conductors: four (4) #4/0 AWG and one (1) #4 AWG ground, THWN¿2 copper, continuous run (no splices).

Electrical conduit: 2.5¿ HDPE SDR 11, continuous run requirements, tracer wire.

Telecom conduit: 2¿ HDPE SDR 11, pull tape and tracer wire, pull box requirement, reducer/transition requirement (as applicable per SOW).

Directional drilling fluids: water-based only;

containment/cleanup; offsite disposal.

Basement penetration: reuse existing penetration or submit request for CO approval prior to any new penetration.

Price Submission. Quoters shall submit either:

(i) a revised total lump sum price for CLIN

0001, or

(ii) a statement that the previously submitted total lump sum price remains unchanged.

All other terms and conditions remain unchanged.

Period of Performance: 02/17/2026 to

04/04/2026

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .