This document is a Price and Payment section (Section 01270) for a sewer system improvements project for the National Park Service. The contract details a comprehensive set of payment terms for various infrastructure components, including 4" and 6" PVC and HDPE pipes, sanitary sewer manholes, septic tanks, dosing tanks, access hatches, concrete lids, meter box lids, chain link fencing, gates, and restoration/hydroseeding work. Payment will be made on a lump sum basis with partial payments based on actual quantities installed, measured horizontally for linear items and per unit for discrete components like manholes and tanks. The measurement and payment terms specify that the contractor's compensation includes all labor, materials, equipment, tools, and associated appurtenances required to complete each specific task, with the understanding that estimated quantities are approximate and the contractor cannot claim damages for differences between estimated and actual work performed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10/23/2024 01270 Price & Payment- 1 of 6
GRSM 304884
SECTION 01270
PRICE AND PAYMENT
PART 1 - GENERAL
1.01 SUMMARY
A. Work covered by this section includes method of measurement and basis of payment for all divisions included.
B. Payment for the various items of the Schedules, as further specified herein, shall include all compensation to be received by the contractor for furnishing all tools, equipment, materials, labor, supplies, manufactured articles, transportation, and temporary facilities required to complete the work in accordance with contract documents including incidentals.
C. Respective prices and payment shall constitute full compensation for all work completed including incidentals.
D. All items not expressly listed as being provided by others that are necessary for the completion of work shall be furnished and installed by the contractor.
1.02 ESTIMATED QUANTITIES
A. All quantities stipulated in the schedule or other contract documents are approximate and are to be used: (1) as a basis for estimating the probable cost of the work and (2) for the purpose of comparing the bids submitted.
B. The contractor shall be paid based upon a lump sum contract for this project.
Partial payments will be based upon actual quantities installed during the time-period addressed by the invoice. Quantities included in the invoice will be measured in the field. The actual amounts of work completed and materials furnished may differ from estimated quantities. The contractor shall make no claim for damages, anticipated profits, or otherwise, on account of differences between the estimated amounts and the actual amount of work performed and materials furnished.
1.03 SURVEY AND MEASUREMENTS
A. All quantity measurements shall be the responsibility of the contractor and will be verified by the COTR.
B. All measurements and subsequent payments will be based on completed and accepted work performed in strict accordance with the drawings, specifications, and other contract documents.
10/23/2024 01270 Price & Payment- 2 of 6
PART 2 – SCHEDULE ITEMS
2.01 GENERAL
A. Payment shall be full compensation to complete the work items in good faith, including incidental work.
B. In addition to the those things listed under each item, the unit price shall be full compensation for all of the following:
1. General requirements in Division 01, but not limited to the following.
a. Submittals
b. Record drawings
c. Schedules and Plans
2. Specific requirements in Division 02, including but not limited to the following (unless otherwise expressly defined as a line item in the bid schedule):
a. Erosion control
b. Clearing and grubbing
c. Removal and replacement of obstructions
d. Associated trenching, excavation and backfill including the removal of any nuisance water, bedding, haunching, and compaction.
e. Disposal of any excess material
f. Traffic control
g. Rough grading
h. Finish work, where called for, including finish grading, topsoiling, and landscaping
2.02 ITEMS
A. Sewer System Improvements Schedule
1. Mobilization
a. Measurement: By the Lump Sum.
b. Basis of Payment: Includes all labor, materials, equipment, tools and all other appurtenances required to transport equipment, materials, and/or staff to the job site.
2. 4” PVC, SDR 35 Pipe
a. Measurement: By the linear foot as installed measured horizontally along the length of the line.
10/23/2024 01270 Price & Payment- 3 of 6
b. Basis of payment: Includes all labor, materials, equipment, tools and other appurtenances required to complete the installation and testing of the pipe.
3. 6” PVC, SDR 35 Pipe
c. Measurement: By the linear foot as installed measured horizontally
d. Basis of payment: Includes all labor, materials, equipment, tools and
4. 6” HDPE, SDR 26 Pipe (Lining for Pipe-Bursted Lines)
e. Measurement: By the linear foot as installed measured horizontally
f. Basis of payment: Includes all labor, materials, equipment, tools and
5. Sanitary Sewer Manholes – 4 Ft. Dia.
a. Measurement: Measured per manhole installed.
other appurtenances required to complete the installation of the manholes.
6. Flow Diversion Manhole
a. Measurement: Measured per Flow Diversion Manhole installed.
b. Basis of Payment: Includes all fittings, base and backfill stone, custom flow diversion assembly, access frame and grate and all other appurtenances required to complete the work as specified.
7. 5000-gallon Septic Tank
a. Measurement: Measured per each septic tank
b. Basis of payment: Includes all labor, materials, equipment, tools, base and backfill stone, and other appurtenances required to provide and install the installation of each septic tank.
aspenwilliams Highlight
10/23/2024 01270 Price & Payment- 4 of 6
8. Dosing Tank Aluminum Access Hatch
a. Measurement: Measured per each access hatch installed.
other appurtenances required to complete the installation of the hatch.
9. Dosing Tank Cast Iron Frame and Lid
a. Measurement: By the Lump Sum for each lid provided and installed. .
b. Basis of Payment: Includes all labor, materials, equipment, tools and all other appurtenances required to provide and install the frame and lid.
10. Dosing Tank Dosing Siphons
a. Measurement: Measured per each dosing siphon provided and installed in the dosing tank.
b. Basis of Payment: Includes all pipe, fittings, flushing, pressure testing, and all other appurtenances required to complete the installation of the dosing siphon in the dosing tank as specified.
11. 6’ x 4’ Precast Concrete Lid
a. Measurement: Per each installed.
b. Basis of Payment: Includes the precast (or poured in place) concrete lid provided and installed on the dosing tank per the construction plans. Price included removing and disposing of the existing lid off-site in an approved landfill. Contractor shall field verify all dimensions to insure a solid fit on the existing dosing tank.
12. 8’ x 4’ Precast Concrete Lid
c. Measurement: Per each installed.
c. Basis of Payment: Includes the precast (or poured in place) concrete lid provided and installed on the dosing tank per the construction plans. Price included removing and disposing of the existing lid off-site in an approved landfill. Contractor shall field verify all dimensions to insure a solid fit on the existing dosing tank.
10/23/2024 01270 Price & Payment- 5 of 6
13. Cast Iron Meter Box Lid
d. Measurement: By each installed.
e. Basis of Payment: Includes providing the appropriately sized cast iron lid and installing the lid on the existing HDPE valve box. The specified lids are designed specifically for HDPE valve boxes. Work also included removing and disposing of the existing HDPE lids in an approved landfill.
14. Chain Link Fence
a. Measurement: Lump Sum payment for the fence to surround the subsurface drain field.
b. Basis of Payment: Includes all posts, footings, supports, connections, and appurtenances required to complete the work as specified.
15. 12 Foot Double Swing Gate
a. Measurement: By each installed.
b. Basis of Payment: Includes all fence material, posts, concrete, supports and other appurtenances required to complete the work as specified.
16. 4 Foot Man-Gate
a. Measurement: By each installed.
b. Basis of Payment: Includes all fence material, posts, concrete, supports and other appurtenances required to complete the work as specified.
17. Restoration/Hydroseeding
a. Measurement: Lump Sum.
b. Basis of Payment: Includes fine-grading and hydroseeding all disturbed areas, removal of all erosion control materials and construction debri, and providing the asphalt surface course mix, and placement to repair all existing disturbed and/or damaged asphalt walkway areas. All asphalt work shall be done in accordance with the Tennessee Department of Transportation Standard Specifications.
END OF SECTION
10/23/2024 01270 Price & Payment- 6 of 6
This Page Intentionally Left Blank
| PRICE AND PAYMENT |
| PART 1 - GENERAL |
| PART 2 – SCHEDULE ITEMS |
| END OF SECTION |