A04_Picnic_Table_Statement_of_work_.docx
DOCX document 19 KB Posted
- Attached to
- GRSM PICNIC TABLES Federal contract opportunity
- Solicitation number
- 140P5325Q0053
About this file
This Statement of Work (SOW) details the procurement of 40 universally accessible picnic tables for Great Smoky Mountains National Park. The tables must be 6-foot long, constructed with 100% recycled plastic in brown color, featuring ADA-compliant design with wheelchair access at both ends. Specific technical requirements include steel frame construction with hot-dip galvanized finish, 2" x 10" planks, and compliance with ADA specifications such as 30" width access and 27" height clearance.
The contract is a supply-only procurement with specific delivery requirements, including unassembled kit delivery to 187 Park Headquarters Road in Gatlinburg, TN. Delivery is limited to Monday-Friday, 8:00 AM-5:00 PM, excluding federal holidays. The contractor must provide 72-hour advance delivery notice, comply with OSHA safety regulations, and ensure personnel wear appropriate personal protective equipment. Final acceptance is contingent on a comprehensive inspection by the Contracting Officer's Representative (COR) to verify count, condition, and compliance with specified requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre_Solicitation_Questions_09_16_25_0001.pdf | ||
| IMG_1162_0001.jpg | JPG image | |
| Table_doc1_9_16_25_0001.pdf | ||
| IMG_1161_0001.jpg | JPG image | |
| Sol_140P5325Q0053_Amd_0001.pdf | ||
| Sol_140P5325Q0053.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Great Smoky Mountains National Park Procurement request for 40 Picnic tables
1.1 Background: Requesting the procurement and delivery of universally accessible outdoor picnic tables for The Great Smoky Mountains National Park, 187 Park Headquarters Road, Gatlinburg, TN 37738. These tables will be used to improve the usability and ADA compliance of public recreation and picnic areas, supporting inclusivity and sustainable practices through the use of 100% recycled plastic materials.
1.2 Work Covered by the Contract Documents: The Contractor shall furnish and deliver, in unassembled kit form, 40, 6-foot long, universally accessible rectangular picnic tables meeting All Specifications outlined below:
· Length: 6 feet (nominal)
· Design: Walk-through, non-tip, non-trip frame configuration with ADA-compliant dual-end wheelchair access
· ADA Compliance:
· Minimum 30" width access
· Minimum 27" height clearance
· 24" combined knee and toe clearance (19" knee + 5" toe) at each end
· Frame Construction:
· Single-piece welded end frames fabricated from 2-3/8" O.D. x 10-gauge steel pipe
· Hot-dip galvanized after fabrication per ASTM A123, minimum 2.0 oz. zinc/sq. ft.
· Diagonal steel braces (1-5/16" O.D. x 14-gauge) to support top
· Die-formed center steel channel for alignment and reinforcement
· Hot-dip galvanized finish applied to all frame components
· Seating and Tabletop:
· Top and seats constructed from 2" x 10" nominal-size planks
· Made of solid-color, 100% recycled plastic
· Brown color with integrated UV stabilizers for ultraviolet protection
· Mounted on galvanized steel subframe supports
· Fasteners: All corrosion-resistant hardware required for assembly shall be included
· Warranty: Limited lifetime warranty on steel frames
· Design Features shall Include:
· Wheelchair accessibility at both ends without reducing full seating capacity
· Non-obstructed walk-through frame layout
· Structural stability design preventing tipping from uneven loading Period of Performance: All picnic tables must be delivered, in unassembled condition. The Contractor is responsible for delivery coordination and shall provide the COR at least 72 hours’ notice prior to arrival.
ITEM 2 – CONTRACTOR’S USE OF PREMISES
· All delivery vehicles must comply with applicable park traffic regulations.
· Deliveries must be made during normal business hours: Monday–Friday, 8:00 AM–5:00 PM, excluding federal holidays.
· Tables shall be delivered in boxed or palletized kits to The Great Smoky Mountains National Park, 187 Park Headquarters Road, Gatlinburg, TN 37738
ITEM 3 – ABBREVIATIONS
· ADA – Americans with Disabilities Act
· ASTM – American Society for Testing and Materials
· OSHA – Occupational Safety and Health Administration
· ANSI – American National Standards Institute
· NPS – National Park Service
· EPA – Environmental Protection Agency
· UV – Ultraviolet
ITEM 7 – ACCIDENT PREVENTION
· Comply with OSHA 29 CFR 1926 for all delivery and material handling.
· Personnel must wear ANSI-rated PPE while on federal property.
ITEM 8– EXECUTION
This is a supply-only contract. No assembly or installation is required.
Phase 1 – Delivery Coordination:
· Contractor shall confirm delivery schedule with COR 72 hours in advance.
· All materials must arrive in boxed or palletized form, clean, and undamaged.
Phase 2 – Unloading and Site Handling:
· Park staff or COR will oversee offloading to ensure proper staging.
· Contractor must protect all components with sufficient packaging to avoid surface damage during shipping and unloading.
Phase 3 – Final Inspection:
· COR will conduct a final inspection to verify count, condition, and compliance.
· Any discrepancies must be corrected before final acceptance.