B08_-_A9_-_Past_Performance_Questionaire_0003.pdf

PDF 432 KB Posted

Attached to
Great Smoky Mountains NP CONCRETE PADS
Solicitation number
140P5323R0006
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation# 140P5323R0006

PAST PERFORMANCE QUESTIONNAIRE

Please complete this Questionnaire and e-mail to Ashley_Warcewicz@nps.gov

The National Park Service (NPS), great Smoky Mountains NP, is contracting the removal removal of the existing degraded asphalt parking pads and replace with 6” of concrete to the same dimensions at multiple parking sites throughout the Cades Cove Campground.

As part of our quote, we have listed you as a reference on our performance for this type of service with your agency under the previous/current contract listed below. Your input on our performance is therefore requested.

Please complete this Questionnaire and e-mail to Contracting Officer, e-mail:

geraldine_larsen@nps.gov

Questionnaire must be submitted directly to the Contracting Officer from a corporate email account.

If you will not be available for verification (if necessary) of this past performance evaluation, please indicate another POC for the contacting officer to contact.

Alternate POC name:

Alternate POC phone number:

Alternate POC e-mail address:

Thank you.

* NAME OF OFFEROR:

Phone: ________________________ Fax: _____________________

E-Mail: _______________________

I. Current or Historical Contract Information

CONTRACT REFERENCED:

1. Contract or Identifying Number:

2. Contract Value:

3. Period of Performance:

4. Brief description of items provided:

5. Name of Person Completing Questionnaire:

Agency/Company:

Title: Phone:

E-mail:

mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20edward_dingle@nps.gov mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20Contracting%20Officer,%20e-mail:%20edward_dingle@nps.gov

140P5323R0006

II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.

Evaluation Definitions –

The following definitions should be used in the assessment of Contractor performance.

EXCEPTIONAL

Performance EXCEEDS MOST contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns.

VERY GOOD

Performance EXCEEDS SOME contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns, for which the Contractor’s corrective actions were highly effective.

SATISFACTORY

Performance MEETS contractual requirements. The performance of the areas being assessed contains minor issues or concerns, for which corrective actions taken by the Contractor were effective.

MARGINAL

Performance MEETS SOME contractual requirements. The performance of the areas being assessed includes significant problems, issues, or concerns for which corrective actions taken by the Contractor were only somewhat effective.

UNSATISFACTORY

Performance DOES NOT MEET contractual requirement. The performance of the areas being assessed includes serious problems, issues, or concerns for which the Contractor’s corrective actions were ineffective.

NOT APPLICABLE (N/A) Performance information not recent or relevant as defined in the Solicitation. Unable to provide assessment.

Past Performance Evaluation

Question 1. Performance

What is your assessment of the Contractor’s ability to meet your requirements?

Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A

Performance

Comments, if any.

140P5323R0006 -

Questions 2 and 3. Timeliness

What is your assessment of the Contractor’s ability to provide products in a timely manner?

Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A

Timeliness Ability to Resolve Timeliness Problems

Comments, if any.

Question 4. Quality of Work

What is your assessment of the Contractor’s ability to meet requirements of tasks and the overall quality of the work?

Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A Quality of Shipments

Comments, if any.

Question 5. Overall Rating of Contractor’s performance

What is your overall rating of Contractor’s performance (requirements, schedule, and price) on contract being assessed?

Exceptional Very Good Satisfactory Marginal Unsatisfactory

General Comments:

PAST PERFORMANCE QUESTIONNAIRE
I. Current or Historical Contract Information CONTRACT REFERENCED:
II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.
Past Performance Evaluation Question 1. Performance
Questions 2 and 3. Timeliness
Question 4. Quality of Work
Question 5. Overall Rating of Contractor’s performance
General Comments:

File details come from the government source that posted it. Updated .