- Fort Pulaski - VC ELECTRICAL DISTRIBUTION UPGRADE Federal contract opportunity
- Solicitation number
- 140P5126R0011
About this file
This is a Questions and Answers document (Amendment 1) for federal contract opportunity 140P5126R0011 concerning electrical service work at Fort Pulaski.
The project involves replacing the electrical transfer switch and associated infrastructure at Fort Pulaski. Key contractor responsibilities include coordinating with Georgia Power for service disconnection and reconnection, obtaining quotes from Georgia Power (POC: Lark Joyner, 229-2411-2212 office or 229-356-0025 cell), and providing temporary power if needed during work, with primary concern for maintaining water and septic system functionality. The contractor must act as the subject matter expert to specify generator requirements, determine appropriate flood elevation measures using FEMA's National Flood Hazard Layer Viewer, and evaluate whether components require replacement based on industry standards and code requirements. The existing electrical service is estimated at 120/240V, 400-amp, 3-phase, pending field verification by the contractor or their SME. The new generator inlet box must be NEMA 3R outdoor-rated, 3-phase, matched to generator voltage and breaker amperage with a matching 3-phase transfer switch. The transfer switch should be rated for 400 amps (combining the main building's 300-amp service and the shed's 100-amp service). The National Park Service maintains inspection jurisdiction; no state, city, or county permits are required. The government will approve plans for access matting in wet areas prior to installation. Various components including conduits, service wires, and the service pole may require replacement if recommended or required by code, as determined by the contractor's assessment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 353019_SOW_Revised_7-8-2026_0002.pdf | ||
| Sol_140P5126R0011_Amd_0002.pdf | ||
| Sol_140P5126R0011_Amd_0001.pdf | ||
| A2_-_DOL_Wage_Determinaton.pdf | ||
| A4_-_LPTA_Technical_Acceptability.docx | DOCX document | |
| A1_-_Statement_of_Work.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140P5126R0011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P5126R0011
Amendment 1
Questions and Answers
1. Will the park be coordinating with Georgia Power to hook the power back to the weather head or will it be the contractors responsibility to get it done?
a. This will be the contractors responsibility.
2. What is the elevation study for the flood zone so they can put the shutoff above the flood zone?
a. The best info for the flood zone area at Fort Pulaski can be found here: FEMA's
National Flood Hazard Layer (NFHL) Viewer If there is an industry standard for mounting the electrical components above the flood line, they can use their SME for this. Our resource manager
3. Are we going to require temporary power to the area while work takes place?
a. Depending on the estimated timeframe of power outage needed for work to be completed, it is a possibility. The ability to power our water and septic system are the two main areas of concern.
4. Please provide the generator information (size) or the or the model number of the generator hookup receptacle required.
a. a. We do not have the specific information for this need. The goal is for the contractor to spec this info out as the SME
5. Will temporary power be required during the replacement of the transfer switch?
a. a. Depending on the estimated timeframe of power outage needed for work to be completed, it is a possibility. The ability to power our water and septic system are the two main areas of concern.
6. If temporary power is required, who is required to provide and who is required to maintain during the project?
a. a. If temporary power is provided, it will be the contractor’s responsibility.
7. Does the govt have an elevation survey for flood levels?
a. a. The best info for the flood zone area at Fort Pulaski can be found here: FEMA's
National Flood Hazard Layer (NFHL) Viewer If there is an industry standard for mounting the electrical components above the flood line, they can use their SME for this.
8. This new service transfer switch should be installed above flood level to meet code requirements, will this be required?
a. a. If recommended/required, then yes
9. The service should be moved toward the Ft. onto solid ground, does the govt wish for the service to be moved?
a. a. If it is recommended/required, then yes https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fhazards-fema.maps.arcgis.com%2Fapps%2Fwebappviewer%2Findex.html%3Fid%3D8b0adb51996444d4879338b5529aa9cd%26extent%3D-81.08523971763304%2C31.9736785876948%2C-80.80268509116826%2C32.11918185829528&data=05%7C02%7Cashley_warcewicz%40ios.doi.gov%7C17ce999ec54e4cf0243908decc993708%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C639173155585869926%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=H0JjjI7irVZ9ikd5F7JujqyC8ZyENg%2BlumeSL0J5Gck%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fhazards-fema.maps.arcgis.com%2Fapps%2Fwebappviewer%2Findex.html%3Fid%3D8b0adb51996444d4879338b5529aa9cd%26extent%3D-81.08523971763304%2C31.9736785876948%2C-80.80268509116826%2C32.11918185829528&data=05%7C02%7Cashley_warcewicz%40ios.doi.gov%7C17ce999ec54e4cf0243908decc993708%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C639173155585869926%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=H0JjjI7irVZ9ikd5F7JujqyC8ZyENg%2BlumeSL0J5Gck%3D&reserved=0
10. A platform should be built to allow higher access for the service to be above flood level, does the govt require this?
a. a. If it is recommended/required, then yes
11. A resistance test should be performed to check for the wire damage, does the govt require this?
12. a. We will be getting this done prior to work starting so that any necessary adjustments can be made.
13. Will the govt allow wood or metal mats to be used for access in the wet areas?
a. a. Yes, but we would require a simple plan for how they will be laid and will need to approve prior to them being laid out.
14. The existing service in the main bldg. is 300 amps & the shed has a 100 amp service, should the transfer switch be rated for only 400 amps?
a. If it is recommended/required, then yes
15. Will a 100 amp fused disconnect be required for the shed service?
a. If it is recommended/required, then yes
16. Who is responsible for paying Georgia Power to disconnect & reconnect the service?
a. a. The contractor will be responsible for the disconnect/reconnect service and can build this into the bid. This will be the most streamlined way to have this done.
17. If the contractor is responsible to hire GA Power does the govt have a POC for Georgia
Power to discuss the project for a quote?
a. a. Lark Joyner, Sales Exec. 229-2411-2212 (office) or 229-356-0025 (cell)
18. Will the contractor be required to obtain a permit from the state, city or county to replace this electrical service?
a. No
19. Will the state, city or county have inspection jurisdiction or will the NPS maintain jurisdiction?
a. NPS maintains jurisdiction
20. Are the conduits below the existing transfer switch required to be replaced?
a. If it is recommended/required, then yes
21. Are the existing service wires to the shed and the visitor center required to be replaced?
a. If it is recommended/required, then yes
22. Are the conduits & wire out the top of the existing transfer switch to be replaced?
a. If it is recommended/required, then yes
23. To meet code, the generator hook up should be mounted on the power service pole up out of the flood zone, does the govt require this?
a. If it is recommended/required, then yes
24. Does the govt require a new service pole to be installed, the existing one is weathered & damaged?
a. If it is recommended/required, then yes
25. What is the existing electrical service voltage, phase, and amperage?
a. Voltage is unclear, but my work supervisors best guess based on this info he has is 120/240 V, 400-amp, 3-phase. The contractor or their SME will need to verify this info in the field if selected for award.
26. What size and rating are required for the new generator inlet box?
a. The park requires a NEMA 3R outdoor-rated, 3-phase inlet matched to the generator voltage and breaker amperage, with a matching 3-phase transfer switch.
The contractor or their SME will need to verify this info in the field if selected for award.
27. Should the new generator inlet match the existing inlet size and configuration?
a. The new generator inlet should be based on the information provided above.
28. What kind of MTS does the park want? Whether it’s a Nema 3r or nema 4x stainless.
a. The scope calls for NEMA 3R minimum