Equipment Replacement - Replace Tour Road Gates - Federal contract opportunity
Solicitation number
140P5125R0010
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document is an Amendment (0001) to a federal solicitation for equipment replacement at Guilford Courthouse National Military Park. The amendment extends the proposal submission deadline to June 09, 2025, at 1:00pm EST, with a contract performance period from 06/16/2025 to 12/16/2025. It provides additional attachments including Division I and II Construction Specifications, Product Files, and Drawings, and includes responses to potential contractors' questions about the project.

The solicitation seeks replacement of tour road gates, with specific requirements for gate lane widths (ranging from 14 to 26 feet across) and contractor licensing (North Carolina Contractors License required). The procurement is structured as a Lowest Priced Technically Acceptable (LPTA) source selection for a Firm-Fixed Price Contract, targeting small businesses in the Ornamental and Architectural Metal Work Manufacturing sector (NAICS code 332323). Contractors must be registered in SAM.gov and will be evaluated on their ability to meet technical specifications and provide the most advantageous quote to the government.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P5125R0010 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PSE

Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW

NPS SER EAST MABO

PSE

Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW

NPS SER EAST MABO

06/04/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/14/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide Division I Construction, Division II

Construction Specifications, Product File, Drawings, and responses to questions received in response to the solicitation and extend the due date for receipt of proposal.

Division I Construction are provided as attachment 0006.

Division II Construction Specifications are provided as attachment 0007.

Product File are provided as attachment 0008.

Drawings are provided as attachment 0009.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Edward Dingle

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P5125R0010/0001

Questions and answers are provided as attachment

0010.

The due date for receipt of proposals is extended through June 09, 2025, 1:00pm EST.

Period of Performance: 06/16/2025 to 12/16/2025

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment 0001; RFP # 140P5125R0010 Attachment 0010

Guilford Courthouse National Military Park

Equipment Replacement - Replace Tour Road Gates

Solicitation # 140P5125R0010

Questions and Answers

Question 1. Can you provide any drawings or design documents?

Answer: Division I Construction Specifications, Division II Construction Specifications, Product Files, and Drawings are provided with amendment 0001.

Question 2. How many lanes ate there and what are their widths?

Answer: Visitor Center Entrance is two lanes totaling 26 feet across, Second gate is 20 feet and one lane, Existing electric gate area is 14 feet across and one lane, and Gate at stop 8 is 18 feet across and is one lane.

Question 3. I was reaching out to see if it was possible for the sign in sheet for the site visit be shared for this solicitation. Also, if you could upload the drawings that would be great!

Answer: The sign-in sheet is internal to this solicitation and will not be shared. See response to question number one for drawings.

Question 4. Could you please provide the project plans?

Answer: See response to question number one for project plans.

Question 5. For all gates, do you require physical remote controls, wireless/app-based access, or both?

Answer: Please see attachment 0008 Product files.

Question 6. Can you please confirm the official quote submission deadline? The solicitation references both June 2 and June 5, 2025. In the Combined Synopsis/Solicitation section under the phrase: “Quotes are due not later than June 02, 2025, 1:00pm Eastern Standard Time (EST)...”. Then, Standard Form 18 (SF18), Block 10: PLEASE FURNISH QUOTATIONS… ON OR BEFORE CLOSE OF BUSINESS: June 05, 2025, 1300 ED.

Answer: The due date for receipt of proposals has been extended through June 09, 2025, 1:00pm EST.

Question 7. Will remote controls be needed? If so, how many units will be required?

Answer: See response to question 5 above.

Question 8. Do you prefer a keypad with time-stamped access and scheduling capability, or a basic keypad with a standard timer function?

Answer: See response to question 5 above.

Amendment 0001; RFP # 140P5125R0010 Attachment 0010

Question 9. Are there any specific contractor licensing requirements for this project (e.g., North Carolina General Contractor’s License, electrical license)?

Answer: Yes, a North Carolina Contractors License is required: The presence and current validity of the Offeror’s and any proposed subcontractor’s applicable South Carolina Contractor State License will be reviewed at the website: https://www.cslb.ca.gov/onlineservices/checklicenseII/checklicense.aspx. Offerors (and any proposed subcontractors) who possess a current and valid State License applicable to the work they will be performing on this project will be more favorably rated. The Government will confirm the presence and status of the Offeror’s North Carolina Contractor State License Classification A - General Engineering Contractor, North Carolina Contractor State License Classification B - General Building Contractor, and North Carolina Contractor State License Classification C (All applicable Trade Classifications).

Question 10. Is there a preferred format for the draft proposed schedule (e.g., tabular, Gantt chart), or are general milestone-based timelines acceptable?

Answer: Yes, the Gantt chart if preferred.