B09_Solicitation_140P5122R0005_Questions_and_Answers_0002.docx
DOCX document 14 KB Posted
- Attached to
- OCMU FIBER INSTALL
- Solicitation number
- 140P5122R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Solicitation_140P5122R0005_Questions_and_Answers2_0003.docx | DOCX document | |
| Sol_140P5122R0005_Amd_0003.pdf | ||
| Sol_140P5122R0005_Amd_0002.pdf | ||
| Sol_140P5122R0005_Amd_0001.pdf | ||
| VCentry_0001.jpg | JPG image | |
| ductandbox_0001.jpg | JPG image | |
| Sol_140P5122R0005.pdf | ||
| B03_wage_rates.pdf | ||
| B11_140P5122R0005_Solicitation_Site_Visit_Info.docx | DOCX document | |
| A04_SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 140P5122R0005, Amendment 0001 Questions and Answers
1. What is the depth of the Manholes? The width and the length stated during our walkthrough was 24”x36”. Can you confirm this is accurate?
Answer: The required "handhole" boxes are 24"x36, The Boxes must be installed at grade
2. What is required when backfilling the trenched areas? Will be required to sod or hydroseed in the areas?
Answer: The backfilling requires the spoil dirt to be replaced, revegetation was not listed on the SOW
3. Does the fiber need to be armored or non-armored fiber?
Answer: The section of fiber that the contract is responsible for is going to run through "duct" ie, conduit so armored is not necessary