This document is a Statement of Work (SOW) for Boat Ramp and Ramp Barge Services at the Statue of Liberty National Monument (STLI) in New York.
The SOW requires a contractor to provide ramp barge services to transport refuse compactor trucks, equipment, containers, and other cargo between Liberty Island, Ellis Island, and a contractor-provided boat ramp location. Services will include an estimated 24 round trips per year for waste removal, as well as additional trips on an as-needed basis for general transportation of NPS materials and equipment. The contractor must provide a mainland boat ramp capable of loading and unloading the required vehicles and equipment. The period of performance is 12 months from April 1, 2024 to March 31, 2025. All contractor employees must complete security clearance and obtain park identification badges. The solicitation number is 140P4524Q0020 and the requirement is being issued by the National Park Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STLI Boat Ramp and Ramp Barge Service
Statement of Work Rev.01, 03.22.2024
Statement of Work (SOW)
BOAT RAMP AND RAMP BARGE SERVICES
Statue of Liberty National Monument and Ellis Island (STLI)
New York, NY
Table of Contents
SECTION 1.0 BACKGROUND
SECTION 2.0 GENERAL
SECTION 3.0 SCOPE
SECTION 4.0 SCHEDULING
SECTION 5.0 DELIVERABLES
SECTION 6.0 GOVERNMENT FURNISHED PROPERTY
SECTION 7.0 SITE ACCESS and SECURITY
SECTION 8.0 PLACE OF PERFORMANCE
SECTION 9.0 PERIOD OF PERFORMANCE
SECTION 10.0 CONTRACTOR’S USE OF PREMISES
SECTION 1.0 BACKGROUND
1.1 Park Mission
The Statue of Liberty National Monument (STLI) is a United States national monument located in the U.S. states of New Jersey and New York comprising Liberty Island and Ellis Island. It includes Liberty Enlightening the World, commonly known as the Statue of Liberty, situated on
Liberty Island, and the former immigration station at Ellis Island which opened in 1892 and closed in 1954. The monument site is managed by the National Park Service (NPS).
1.2 Park Description
STLI is in Upper New York Bay East of Liberty State Park in Jersey City, New Jersey and southwest of Battery Park at the tip of Manhattan in New York City. Contractor access is available to Ellis Island through the private Ellis Island Bridge, located within Liberty State Park, Jersey City, NJ 07305. Access to Liberty Island is via marine transportation only.
SECTION 2.0 GENERAL
2.1 Contract Type
This is a firm-fixed price (FFP), commercial, non-personal service contract to provide the NPS with a mainland boat ramp location and roundtrip ramp barge transportation services for STLI.
2.2 Contract Line items (CLINs)
All services, labor, and equipment for this contract will be issued using the following CLIN structure:
CLIN # Description Qty Unit of Issue Unit Price Total Price
(FFP) Boat Ramp and Ramp Barge Transportation for the Statue of Liberty National Monument (STLI)
IAW Attachment 1: Statement of Work. NTE 24 roundtrips (average 2 roundtrips/month)
1 round trip = *$TBD POP: 4/1/24 - 3/31/25
24 Each $ $
(FFP) IDIQ Boat Ramp and Ramp Barge
Transportation for the Statue of Liberty National
Monument (STLI) IAW Attachment 1: Statement of
Work. NTE 21 roundtrip Service Calls
1 round trip = *$TBD POP: 4/1/24 - 3/31/25
1 **Lump
Sum
TOTAL PRICE $
*The price per roundtrip will be in accordance with Contractor’s proposed price.
**Funding will be added to the contract before an Indefinite Delivery Service Call is issued.
2.3 Services Description
The Contractor shall provide all labor, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personnel services necessary to perform the services as defined in this SOW. Ramp barge services include transportation of non-Government owned solid waste trash vehicle(s) and refuse containers, NPS materials and equipment, and non-
Government owned equipment required for the maintenance of STLI. A Contractor provided ramp barge is required to facilitate the transfer of vehicles, containers, and equipment between the barge and docking/landing locations. Ramp barge services also include a means of transporting the ramp barge between its mainland boat ramp and service locations. A mainland boat ramp is required by the Contractor for the loading and offloading of transported materials and equipment. The Contractor shall provide the Government with the location of the mainland boat ramp shall be provided after contract award.
The Contractor shall have a Near Coastal/Oceans (NCO) Master License. Any items not specifically noted, but necessary for performance in accordance with accepted industry standards, shall be furnished by the Contractor under this contract. The Contractor shall perform to the standards in this contract.
2.4 Contractor Employees
All employees shall be recognizable as employees of the Contractor by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which show the
Contractor’s company name and employee name.
SECTION 3.0 SCOPE
The Contractor shall provide ramp barge services for the STLI Park. Services will include round trips for the transportation of refuse compactor truck, refuse compactor, non-hazardous debris container, tools, equipment, containers, and palletized cargo between Liberty Island, Ellis Island, and a Contractor provided boat ramp location as specified in Service Calls. All trips will be roundtrips.
3.1 Waste Removal Transportation
3.1.1 The Contractor shall provide ramp barge services capable of transporting a solid waste roll off refuse compactor truck (66,000 lbs.) from a Contractor identified boat ramp to Liberty
Island and return with either a full 25-cubic yard refuse compactor or 30 cubic-yard container full of non-hazardous debris. The Government estimates an average 2 roundtrips per month will be needed for waste removal for a total of 24 roundtrips for the contract period of performance. The exact number of trips per month may vary based on season (e.g., more visitors in the summer vs. winter).
3.1.2 The Contractor shall provide a boat ramp location, capable of loading/unloading the refuse compactor truck, and waste containers, for use during performance under this contract.
The ramp at Liberty State Park is not a viable location and may not be used during the performance of this contract. The number of roundtrips needed will vary depending on what projects the park has that would require transportation of materials and equipment. These services will be completed on an as-need basis as an indefinite delivery/indefinite quantity
(IDIQ) CLIN.
3.2 General Ramp Barge Services
Contractor shall provide services capable of safely transporting NPS equipment, tools, containers, and palletize cargo BETWEEN ELLIS ISLAND FUEL DOCK BOAT RAMP AND
LIBERTY ISLAND BEACH LANDING. The service call will identify the required locations for the completion of the service call.
3.3 Regulations
The Contractor, employees, and ramp barge shall meet all regulatory compliance for federal, state, county and local authorities including those issued by the United States Coast Guard
(USCG). The Contractor will provide proof of licensing for all employees working on this contract.
SECTION 4.0 SCHEDULING
All work performed under this contract will be scheduled and coordinated with the Contracting
Officer Representative (COR) and shall be performed on an as-needed-basis. The Contractor will be provided a minimum of 48-hours advance notice that service is required and what date services need to be performed. A follow-up email will be provided confirming the service call information including date and trip locations and will be provided no later than the date of service call performance.
SECTION 5.0 DELIVERABLES
5.1 Service Call Crew and Ramp Barge Information
At the time the COR notifies the Contractor of a delivery requirement, the Contractor shall provide the name of the ramp barge that will provide the service and the names of participating crew members.
5.2 Service Call Report
The Contractor shall provide the CO and COR with an electronic receipt of service report after each transport service is completed.
SECTION 6.0 GOVERNMENT FURNISHED PROPERTY
The Government will not furnish any supplies, materials, equipment, or facilities to the Contractor to perform the services defines in this SOW.
SECTION 7.0 SITE ACCESS and SECURITY
NO INDIVIDUAL THAT REPRESENTS A RISK OR THREAT TO NATIONAL SECURITY
AS DETERMINED BY THE GOVERNMENT SHALL BE EMPLOYED UNDER THIS
CONTRACT.
7.1 Park ID and Badging
All Contractor employees shall complete a U.S. Park Police Identification Card: Application &
Background Check Request Form (Attachment 2) and submit the completed form to the U.S.
Park Police (USPP) upon award of contract or at least (2) weeks in advance of the employment or work start date of the employee. Employees shall display their USPP issued Park ID in a visible location on their person at all times while on park property.
7.1.1 All criminal history must be included on the form. Although the main concern of the
USPP is serious criminal activity, and/or appearance on terrorist watch lists, omission of minor criminal incidents is a credibility issue which will delay approval and may be cause for denial.
Intentionally providing false information in any way will result in denial of the application.
7.1.2 Once an employee’s application is approved the Contractor shall arrange an in-person appointment with USPP Administrative Support at the Ellis Island Police Office to have the employee’s photograph taken, and ID card issued. Digital photographs will not be accepted via email.
7.1.3 The Contractor is responsible for maintaining, tracking, and returning all ID cards issued to Contractor employees. If the Contractor fails to return all issued ID cards it may result in a breach of security and the Contractor will be liable for all costs associated with correcting the breach in security.
7.1.4 ID cards will only be valid for one year, after which the employee must obtain a replacement ID card. A replacement ID card will not be issued unless the expired or damaged card is returned. If the ID card is lost or stolen a report must be immediately filed with the
USPP. The USPP case number must be provided to the USPP Administrative Secretary prior to issuance of the replacement card.
7.2 USPP Ramp Barge Screening
All equipment used in the performance of this contract are subject to USPP K-9-unit screening and accompaniment while underway. On the day of service, the USPP will arrive at the
Contractor identified boat ramp and perform a screening with a USPP K-9 unit. Upon completion of screening, the USPP K-9 unit will remain aboard the ramp barge for the duration of the trip to and from Liberty Island.
SECTION 8.0 PLACE OF PERFORMANCE
8.1 Waste Removal Locations
All services related to waste removal will be completed between the Contractor identified boat ramp location and the Liberty beach landing located at Liberty Island, New York, NY 10004.
(See Attachment 3, Beach Landing and Dock Locations)
8.2 General Services Locations
All services related to general ramp barge transportation to NPS will be completed between both
Islands using Ellis Island fuel dock boat ramp and Liberty Island beach landing. (See Attachment
3, STLI Beach Landing and Dock Locations)
SECTION 9.0 PERIOD OF PERFORMANCE
The period of performance of this requirement is 12 months. The anticipated period of performance is:
01 APR 2024 – 31 MAR 2025
SECTION 10.0 CONTRACTOR’S USE OF PREMISES
10.1 Ramp Barge Landing
Contractor will be allowed to land the servicing ramp barge at the Liberty Island beach landing for the purposes of loading/unloading the refuse compactor truck, and waste containers, for use during performance under this contract. Landing at the Liberty Island beach landing will also be allowed for safely transporting NPS equipment, tools, containers, and palletize cargo BETWEEN
ELLIS ISLAND FUEL DOCK BOAT RAMP AND LIBERTY ISLAND BEACH LANDING.
10.2 Damage Responsibilities
Contractor shall be responsible for all damages to persons or property that occur because of a
Contractor employee’s fault or negligence.