ROOF REPLACEMENT OF THE COWEN HOUSE
Solicitation number
140P4522R0002
Issued by

View the file

Other files

File Type Posted
Sol_140P4522R0002_Amd_0003.pdf PDF
Sol_140P4522R0002_Amd_0002.pdf PDF
Scope_of_Work_REV_1_SPECS-20220401_0001.pdf PDF
A06_19031_-_UPDE_100__CD_DRAWING_-_2020-03-03.pdf PDF
Sol_140P4522R0002.pdf PDF
A04_SOW_SPECS-2021-22-04.pdf PDF
Wage_Determination_NY7.pdf PDF
References_Worksheet.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P4522R0002 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PNP

Staten Island NY 10305 Contracting Office 210 New York Ave.

NPS, NER - NPNH

01/04/20220001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

12/16/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to post questions and answers:

1.Question: Which email should questions be submitted too?

Answer: Questions shall be submitted to Lori Mora, Contract Specialist at lori_achkar@nps.gov

2.Question: Please confirm the requirements for the QA/QC officer are as follows: A qualified installer, approved affiliate member of CSSB and who has completed not less than

25 cedar roof installations.

Answer: A. Installer Qualifications: A qualified installer (See amended Scope of Work Rev

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JENNIFER GARTZKE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4522R0002/0001

1 under section titled WOOD SHINGLES AND SHAKES

07 31 29 - 2, section 1.7 Quality Assurance.

B. Grading Agency Qualifications: An independent testing and inspecting agency recognized by authorities having jurisdiction as qualified to label wood shakes for compliance with referenced grading rules.

C. Source Limitations: Obtain wood shakes from single source from single manufacturer.

D. Pre-installation Conference: Conduct conference at Project site.

3.SF1442 page 3 and FAR 52.204-8 both state the

NAICS code is 238160. However, Section L, C.5 states the NAICS is 236220. Please clarify if the appropriate NAICS code is 238160.

Answer: The correct NAICS code for this project is 238160, Roofing Contractors

4.Question: What is the Estimated Magnitude of this Project

Answer: The estimated value is between $100k

-$250K

5.Question: Where are the solicitation documents located:

Answer:The solicitation 140P4522R0002 can be located at www.sam.gov under Contract

Opportunities

6.Question: Solicitation refers on p52, Section

M, 1) iii) b that a qualified installer, approved affiliate member of the CSSB and who has completed not less than 25 cedar roof installations. Is the CCSB be foregone?

Answer:Please see amended Scope of Work Rev 1 under section WOOD SHINGLES AND SHAKES 07 31 29 -

2, section 1.7 Quality Assurance.

7. Question:Can the park consider using a synthetic shake for the Corwin House project?

Answer: Since the building is an historic structure and compliance was completed and approved specifying a cedar shake, synthetic shakes are not acceptable.

8.Question: A search of the specs and drawings do not appear to indicate the roof pitch. Please provide the roof pitch.

Answer: The park does not have drawings. The roof

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P4522R0002/0001 appears to be between 10/12 pitch to 12/12 pitch