This file contains Questions and Answers (RFIs 49-59) for federal contract opportunity 140P4326R0013 – GEWA Replace HVAC Equipment.

Key clarifications from the RFIs address personnel staffing, project scheduling, environmental conditions, and equipment specifications. One individual may serve as Superintendent, Site Safety and Health Officer (SSHO), and Quality Control Manager simultaneously. The period of performance may be extended post-award if material and equipment lead times require adjustment due to market conditions. The building must maintain climate control continuously, and contractors should assume the presence of asbestos or lead and plan accordingly with partitioning, dust containment, and negative air machines. The project does not require phasing, with only one to two occupants in the building during work. No permitting is required, and the project qualifies as tax-exempt. Direct Digital Control systems are not limited to Siemens; other manufacturers providing standalone controls are acceptable, and the government has no preferred vendor. These responses provide bidders with essential project parameters for proposal development.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P4326R0013 – GEWA Replace HVAC Equpment

RFIs 49-59

RFI 49 - Can one person "triple hat" as Superintendent, SSHO and QC Manager?

Answer: Yes.

RFI 50 - Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?

Answer: Yes, if needed.

RFI 51 - Are there any temporary heating/cooling requirements?

Answer: Yes, the building must maintain climate control at all times.

RFI 52 - Please confirm whether asbestos or lead is present on this project, and if so, provide the relevant documentation?

Answer: Unknown, but should assume that there is.

RFI 53 - Are there any phasing requirements?

Answer: No.

RFI 54 - How many people will be in the building?

Answer: One or two.

RFI 55 - Is this project tax exempt?

Answer: Yes.

RFI 56 - Is permitting required?

Answer: No.

RFI 57 - Are partitioning, dust containment, and/or negative air machines required for this project?

Answer: Yes.

RFI 58 - Does the government have a preferred Direct Digital Control for HVAC company? If so please provide the contact information.

Answer: No preference.

RFI 59 - “Does the controls systems have to be provided by “Siemens” as listed in Section 23 09 00 par 2.1, or is it open to other manufacturers who can provide standalone controls?

Answer: The controls do not have to be provided by Siemens. Other manufactures are acceptable.