This is an Amendment 0001 to a Request for Quote (RFQ) for Fire Alarm and Fire Sprinkler System Maintenance and Repair Services at Lowell National Historical Park. The amendment extends the offer receipt deadline to 2:00 PM ET on September 18, 2026, and provides responses to 26 questions submitted by offerors, along with annual inspection reports for both fire alarm and sprinkler systems at four park buildings.
Key service requirements include annual fire alarm system inspections per NFPA 72 standards, monthly fire pump operation testing, quarterly sprinkler system inspections per NFPA 25 standards, semi-annual backflow preventer visual tests, and emergency repair services. All pricing is structured as lump sum CLINs with time-and-materials (T&M) repair options; the Government will establish not-to-exceed ceiling amounts at award. Offerors must propose fully burdened hourly rates that include travel time and mileage. Critical responses clarify that hose stream testing (not closed-loop flowmeter) is required for fire pump capacity testing, monthly visual backflow preventer tests are required despite exclusion of formal testing, escorts require one week advance notice for sensitive areas, COR approval for historic structure modifications will be provided within 48 hours, and all inspections must occur during normal operating hours (8 AM–5 PM Monday–Friday). The period of performance is October 1, 2026, through September 30, 2027. The solicitation involves four buildings with varying system configurations documented in attached inspection reports, and the Park Service contact is Ron Bain at the Mogan Cultural Center location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4326Q0065.pdf | ||
| B08_Solicitation_Attachment_1_Scope_of_Work.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jason Albright
See continuation page
NPS, NER - NE MABO
Boston National Historical Park Charlestown Navy Yard Building I-1 Boston MA 02129-4543
PNN
140P4326Q0065
09/15/2026
09/02/2026
1 162
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P4326Q0065/0001
Fire Alarm and Fire Sprinkler System
Maintenance and Repair Services at Lowell
National Historical Park.
The purpose of this amendment is to extend the hour and date for receipt of offers, provide a list of attendees from the organized site-visit, provide a response to all questions received, provide Annual Fire Alarm Reports, and provide Annual Sprinkler Systems Reports.
The hour and date for receipt of offers has been extended to 2:00 pm ET on September 18, 2026.
Period of Performance: 10/01/2026 to
09/30/2027
Request for Quote Number 140P4326Q0065 Fire Alarm and Fire Sprinkler System Maintenance at Lowell National Historical Park Amendment 0001
DESCRIPTION OF AMENDMENT/MODIFICATION
The following are a list of questions received for the Solicitation Number 140P4326Q0065, Fire Alarm and Fire Sprinkler System Maintenance at Lowell National Historical Park.
1) Section 8.0 of the Scope of Work states that the existing system details “remain as provided,” but we could not locate an equipment inventory or existing-system schedule.
To properly price the annual inspection and monthly fire-pump CLINs, could you please provide the following information for each of the four buildings:
• Number of fire pumps and jockey pumps
• Pump makes, models, capacities, and driver types
• Fire alarm panel makes and models
• Approximate initiating and notification device counts
• Number of sprinkler systems by type, including wet, dry, and pre-action systems
• Number and locations of sprinkler risers
• Any available prior inspection reports, deficiency reports, or system inventories.
Answer: Please see attached Inspection Reports
2) Could you please provide the available blueprints, drawings, or system plans for the locations?
Answer: Blueprints, drawings, and plans are not available.
3) Would you be able to provide the device counts that are tied to the fire alarm panel for all of the four sites?
4) Could you please provide information such as the number of risers, fire suppression systems, and other relevant equipment/components at each location?
5) Any available system inventory or existing inspection reports would also be greatly appreciated.
Amendment 0001
6) CLINs 00010 through 00090 are presented without a quantity or unit of issue. Will the
Government identify the quantity and unit of issue for each CLIN?
Answer: Quantity of 1, unit of issue is Lump Sum. Progress payments will be authorized in accordance with FAR 52.232-16.
7) Is CLIN 00020, Monthly Fire Pump Operation, to be priced as a single annual lump sum covering all twelve monthly tests, or as a unit price per month against a quantity of twelve (12)?
Answer: Quantity of 1, unit of issue is Lump Sum. Progress payments will be authorized in accordance with FAR 52.232-16.
8) The bid schedule for CLINs 00030, 00060, and 00090 contains a blank entry for Total Not-To-Exceed Ceiling, while paragraph (f) of the price evaluation criteria states that the not-to-exceed ceiling will be established at the time of award. Should offerors enter a ceiling amount in the bid schedule, and if so, on what basis?
If offerors are directed to propose a not-to-exceed ceiling amount, will that proposed amount be included in the total evaluated price?
Answer: Government will establish not-to-exceed ceiling amounts at the time of award. Offerors should not enter a not-to-exceed ceiling amount, only hourly rates should be included. Total evaluated price will be determined as stated in the solicitation within FAR 52.212-2.
9) Are travel time and mileage to and from the park included within the proposed hourly rate, or are they separately reimbursable under the time and materials CLINs?
Answer: Proposed hourly rates shall be fully burdened, to include travel time and mileage, if any.
10) Section 4.2 requires pump capacity flow testing per manufacturer specifications. Will the Government accept flow testing performed by closed-loop flowmeter, or is a hose stream test through the test header required?
Answer: Hose stream test through the test header.
11) If a hose stream test is required, who is responsible for discharge water containment, dechlorination, and any associated municipal or state permits, if any are required?
Answer: The location is on Federal property. No permit for a flow test will be required.
Amendment 0001
12) Are fire alarm control panel and notification appliance circuit secondary power batteries to be replaced at 100% volume as part of the firm fixed price annual inspection, or under the time and materials CLINs on an as-needed basis if they fail testing?
Answer: This will be covered under the Time & Material CLIN.
13) Please provide a device inventory or point count per building (fire alarm devices, sprinkler heads/valves, etc.).
14) Please provide the most recent NFPA 25 and NFPA 72 inspection reports for each site.
15) Fire Alarm Devices: What is the total count of fire alarm control panels, smoke detectors, heat detectors, manual pull stations, horns, strobes, flow switches, and tamper switches across all park facilities?
16) Suppression Systems: What are the exact types, sizes, and quantities of water-based fire suppression systems (e.g., wet, dry, pre-action valves) installed at each location?
17) Fire Pumps: How many fire pumps and jockey pumps are installed across the park facilities, and what are their specific capacities (GPM/PSI) and manufacturers?
18) Monitoring Equipment: How many wireless master boxes and third-party monitoring connections are currently active and maintained under this scope?
Amendment 0001
19) System Inventory/Documentation: The SOW notes "Existing system details remain as provided", but no attachment or inventory list was included in the text. Can the Government provide the complete equipment inventory list, make/model numbers, and installation dates for all systems?
20) Backflow Preventers: While backflow preventer testing is explicitly listed as an exclusion under Section 2.0, are there any associated maintenance or visual check requirements for these units during annual inspections?
Answer: A monthly visual test of the backflow.
21) Annual Pump Testing: Section 4.2 requires annual "Pump capacity (flow) testing per manufacturer specs." Does this include a full flow test (suction supply vs. discharge through hoses/flow meters), and does the park have adequate drainage available on-site for full-flow annual pump testing?
Answer: This includes a full flow test. The park has adequate drainage for a full flow test.
22) Repair Feasibility & Timeline: Section 4.1 states to "Complete repairs within 48 hours, when feasible." What criteria or formal approval process defines what is "not feasible," and how are parts availability delays handled under this 48-hour window?
Answer: If a non-stock item is not available it is with understanding that a 48hr window may not be possible.
23) Emergency Call-Out Definition: Section 4.4 lists hourly rates for weekdays vs.
weekends/holidays for Service Calls, but does not define what constitutes an "Emergency" service call versus a routine service call. Is there a separate response time or rate for after-hours emergencies?
Answer: Normal Hours of operation are 8am-5pm Monday-Friday. If a call is placed within those days and time that should fall under your standard rate if it is outside on those days or or hours that would fall under your alternate rate.
Amendment 0001
24) T&M Ceiling Limits: Section 4.5 mentions a "T&M Not-to-Exceed Ceiling amount for current year" for Repairs/Additional Work. What is the current dollar ceiling allocated for T&M repairs per year under CLINs 00030, 00060, and 00090?
Answer: As stated in the solicitation, FAR 52.212-2 Evaluation – Commercial Products and Commercial Services, actual not-to-exceed ceiling amount for Time & Material line items will be established at the time of award. Amount will be based on availability of funding and anticipated needs.
25) Escort Procedures: Section 7.0 notes that an "Escort required in sensitive areas." Will the Government provide dedicated escorts during all inspection and maintenance hours, and how much advance notice is required to schedule these escorts?
Answer: A weeks' notice prior to a scheduled inspection.
26) Historic Fabric Modifications: Section 10.0 states "No drilling or alteration of historic structures without approval." In the event that minor anchoring or conduit routing is strictly necessary to repair a fire alarm line, what is the expected turnaround time for the COR to review and approve such requests?
Answer: Within 48hrs an approval will be provided.
27) Working Hours: Are all annual inspections and routine monthly tests required to be performed during standard park operating hours (e.g., 8 AM–5 PM), or can noisy/disruptive work (like fire pump testing or horn/strobe tests) be performed after hours?
Answer: All inspection can be performed during nomal hours of operations.
MOGAN CULTURAL CENTER
40 FRENCH STREET
LOWELL, MA 01852
2259993548
Building Contact: Ron Bain Title: Head of Vendor Management
Company: Everon Contact: David McGlashan Title: Inspector
Inspection Date: Jan 14, 2026 Tested to NFPA 72 Standards
Fire Alarm Systems
INSPECTION
CERTIFICATE
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for immediate review and approval.
Page of 2 21 Executive Summary
Everon Download Date: 02/04/2026
EXECUTIVE SUMMARY
Generated by: BuildingReports.com
Building Information
MOGAN CULTURAL CENTER
40 FRENCH STREET
LOWELL, MA 01852
United States of America
Contact: Ron Bain
Phone: 2259993548
Fax:
Mobile:
Email: ron@hurtvet.com
Inspection Performed By Everon 300 Myles Standish Blvd Taunton, MA 02780 United States of America
Inspector: David McGlashan
Phone: (781) 983-0392
Fax:
Mobile:
Email: dmcglashan@everonsolutions.com
System Control Unit Manufacturer: Fire-Lite Inspection Date: 01/14/2026 IDC Style:
Model Number: MS-9200 Install Date: 01/19/2024 SLC Style:
Software Version: Version Date: 01/19/2024 NAC Style:
Location: 1st in FACU room off loading dock in utility closet 106 A
Disconnect Location: Disconnect Type:
Current Protection: Breaker
Central Station Signal Verification Type: Digital Radio Mfg: Keltron Model #: MB #2592
Test Time/Date: 1/14/26 8:00:47 AM Restore Time: Note:
Page of 3 21
Everon Download Date: 02/04/2026
Building: MOGAN CULTURAL CENTER Contact: Ron Bain
Company: Everon Inspector: David McGlashan
Signed: Jan 14, 2026
Inspection Summary
Category
Total Items Serviced Passed Failed/Other
Qty % Qty % Qty % Qty %
Control 5 4.76% 5 100.00% 5 100.00% 0 0.00%
Indicating 5 4.76% 5 100.00% 5 100.00% 0 0.00%
Initiating 95 90.48% 95 100.00% 94 98.95% 1 1.05%
Totals 105 100% 105 100.00% 104 99.05% 1 0.95%
Certification
Page of 4 21 Discrepancy Report
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite MS-9200Building: MOGAN CULTURAL CENTER
DISCREPANCY REPORT
Deficiency, Impairment, and Observation
Generated by: BuildingReports.com
The Discrepancy Report consolidates each discrepancy listed within the various Testing sections of your Inspection.
Discrepancies are listed by Category, and grouped by device type. The description of the problem is provided and where appropriate, code references are listed for your convenience. Any item that was inspected that is subject to a recall or part of a manufacturer's replacement/upgrade program is included.
Building: MOGAN CULTURAL CENTER
Items listed for Recall or Replacement/Upgrade Device Type Manufacturer Model Number Date Qty
No recalled items found during this inspection.
Discrepancies ScanID Location Problem Address Reference
INITIATING
Smoke Detector
69631803 2nd in library Failed Operation 1-3 D050 NFPA72 14.2.2.3.1
Code References NFPA72 14.2.2.3.1 System deficiencies shall be corrected.
Page of 5 21 Proposed Solutions Report
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite MS-9200Building: MOGAN CULTURAL CENTER
PROPOSED SOLUTIONS REPORT
Generated by: BuildingReports.com
The Proposed Solution Report provides a solution for each discrepancy listed on the Discrepancy Report. Provide a check mark where indicated to approve repairs listed within the report. Items listed as T/M are available for repair on a Time and Materials basis.
ScanID Location Solution Model # Cost Fixed Date
INITIATING
Smoke Detector
69631803 2nd in library Replace SD355 T/M
Customer WO/PO #:
(none)
Internal WO/PO #:
(none)
Total: T/M
Page of 6 21 Inspection & Testing
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite MS-9200Building: MOGAN CULTURAL CENTER
INSPECTION & TESTING
Generated by: BuildingReports.com
The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or Failed/Other .
Items are listed by Category. Each item includes the services performed, and the time & date at which testing occurred.
Device Type Location Service Time Date
PASSED
Control
Battery 1st in FACU room off loading dock in utility closet 106 A
Tested 8:00:06 AM 01/14/2026
Battery 1st in communicator FACU room off loading dock in utility closet 106 A
Tested 8:00:53 AM 01/14/2026
Communicator 1st in FACU room off loading dock in utility closet 106 A
Tested 8:00:47 AM 01/14/2026
Control Panel 1st in FACU room off loading dock in utility closet 106 A
Tested 8:00:01 AM 01/14/2026
Indicating
Beacon 1st outside front entrance Tested 8:00:16 AM 01/14/2026
Horn/Strobe 1st in all areas x13 Tested 8:00:28 AM 01/14/2026
Horn/Strobe 2nd in all areas. x17 Tested 8:00:36 AM 01/14/2026
Horn/Strobe 3rd in all areas. x15 Tested 8:00:42 AM 01/14/2026
Initiating
Heat Detector 1st in boiler room 106 B Tested 9:57:22 AM 01/14/2026
Pull Station 1st at east entrance Tested 9:59:31 AM 01/14/2026
Pull Station 1st at east entrance boarding house Tested 9:57:06 AM 01/14/2026
Pull Station 1st at east entrance w. peoples in 107 Tested 9:01:10 AM 01/14/2026
Pull Station 1st at east entrance w. peoples in 108 great room rear
Tested 8:57:55 AM 01/14/2026
Pull Station 1st at east entrance w. peoples in 108 great room rear
Tested 8:58:09 AM 01/14/2026
Page of 7 21
Everon Download Date: 02/04/2026
Device Type Location Service Time Date
PASSED (continued)
Initiating (continued)
Pull Station 1st at main lobby front entrance Tested 9:58:35 AM 01/14/2026
Pull Station 1st at main lobby vestibule Tested 9:59:01 AM 01/14/2026
Pull Station 1st at one city NW peoples exit Tested 9:16:01 AM 01/14/2026
Pull Station 1st at one city entrance Tested 9:58:03 AM 01/14/2026
Pull Station 1st in facu room receiving dock Tested 9:06:02 AM 01/14/2026
Pull Station 1st in library 103 Tested 9:30:10 AM 01/14/2026
Pull Station 1st in library 103 Tested 9:57:31 AM 01/14/2026
Pull Station 1st in rear exit at stairwell Tested 8:56:12 AM 01/14/2026
Pull Station 1st in rear M. Lobby receiving dock Tested 9:04:16 AM 01/14/2026
Pull Station 1st in rear M. Lobby restrooms Tested 9:06:13 AM 01/14/2026
Pull Station 2nd at elevator Tested 9:55:20 AM 01/14/2026
Pull Station 2nd at elevator lobby Tested 8:44:51 AM 01/14/2026
Pull Station 2nd at in 201n exit to rear stairway Tested 8:54:04 AM 01/14/2026
Pull Station 2nd at top of stairs in library Tested 9:33:09 AM 01/14/2026
Pull Station 2nd in library Tested 9:50:42 AM 01/14/2026
Pull Station 3rd in hallway Tested 8:15:51 AM 01/14/2026
Pull Station 3rd in hallway ifo room 33 Tested 8:31:55 AM 01/14/2026
Pull Station 3rd in hallway south exit Tested 8:34:52 AM 01/14/2026
Pull Station 3rd in library Tested 9:37:46 AM 01/14/2026
Pull Station 3rd in library Tested 11:35:45 AM 01/14/2026
Pull Station 3rd in room 31 Tested 8:34:37 AM 01/14/2026
Pull Station 3rd in room 33 room 35 Tested 8:15:28 AM 01/14/2026
Smoke Detector 1st in 102 boarding house dining room Tested 9:56:59 AM 01/14/2026
Smoke Detector 1st in 102 boarding house keepers room Tested 9:56:41 AM 01/14/2026
Smoke Detector 1st in 102 boarding house kitchen Tested 9:56:39 AM 01/14/2026
Page of 8 21
Everon Download Date: 02/04/2026
Device Type Location Service Time Date
PASSED (continued)
Initiating (continued)
Smoke Detector 1st in boiler room 106 B electrical room Tested 9:24:36 AM 01/14/2026
Smoke Detector 1st in elevator machine room w.peoples ifo 107A
Tested 9:56:35 AM 01/14/2026
Smoke Detector 1st in facu room receiving dock Tested 9:05:36 AM 01/14/2026
Smoke Detector 1st in library 103 Tested 9:57:11 AM 01/14/2026
Smoke Detector 1st in library 103 Tested 9:57:27 AM 01/14/2026
Smoke Detector 1st in library 103 Tested 9:57:35 AM 01/14/2026
Smoke Detector 1st in library 103 Tested 9:57:40 AM 01/14/2026
Smoke Detector 1st in library 103 Tested 9:57:43 AM 01/14/2026
Smoke Detector 1st in library 103 Tested 9:57:45 AM 01/14/2026
Smoke Detector 1st in library Kerouac room 103 Tested 9:57:17 AM 01/14/2026
Smoke Detector 1st in library break room 103 Tested 9:57:14 AM 01/14/2026
Smoke Detector 1st in library office 103 Tested 9:57:49 AM 01/14/2026
Smoke Detector 1st in main hallway ifo restrooms Tested 9:56:04 AM 01/14/2026
Smoke Detector 1st in main lobby ifo 103 Tested 9:56:06 AM 01/14/2026
Smoke Detector 1st in main lobby ifo east entrance Tested 9:56:14 AM 01/14/2026
Smoke Detector 1st in main lobby ifo one city exhibit Tested 9:58:41 AM 01/14/2026
Smoke Detector 1st in main lobby ifo south elevator Tested 9:56:10 AM 01/14/2026
Smoke Detector 1st in main lobby on ramp Tested 11:34:57 AM 01/14/2026
Smoke Detector 1st in main lobby w.peoples ifo north elevator
Tested 9:56:18 AM 01/14/2026
Smoke Detector 1st in men's restroom 104 Tested 9:56:00 AM 01/14/2026
Smoke Detector 1st in one city Tested 9:58:07 AM 01/14/2026
Smoke Detector 1st in one city high ceiling Tested 9:16:09 AM 01/14/2026
Smoke Detector 1st in one city high ceiling Tested 9:16:16 AM 01/14/2026
Smoke Detector 1st in one city high ceiling Tested 11:29:38 AM 01/14/2026
Page of 9 21
Everon Download Date: 02/04/2026
Device Type Location Service Time Date
PASSED (continued)
Initiating (continued)
Smoke Detector 1st in rear stairwell exit 103 Tested 11:35:01 AM 01/14/2026
Smoke Detector 1st in w. peoples 107 gallery Tested 9:00:53 AM 01/14/2026
Smoke Detector 1st in w. peoples 107 gallery Tested 9:01:01 AM 01/14/2026
Smoke Detector 1st in women's restroom 105 Tested 9:55:56 AM 01/14/2026
Smoke Detector 1st in rear M. Lobby loading dock Tested 9:55:53 AM 01/14/2026
Smoke Detector 2nd in exhibit w. peoples Tested 8:42:28 AM 01/14/2026
Smoke Detector 2nd in exhibit w. peoples lighting control room
Tested 8:43:29 AM 01/14/2026
Smoke Detector 2nd in exhibit handicap w. peoples Tested 8:40:52 AM 01/14/2026
Smoke Detector 2nd in hallway North elevator Tested 8:46:07 AM 01/14/2026
Smoke Detector 2nd in hallway south elevator Tested 8:46:02 AM 01/14/2026
Smoke Detector 2nd in library Tested 9:41:29 AM 01/14/2026
Smoke Detector 2nd in library Tested 9:55:31 AM 01/14/2026
Smoke Detector 2nd in library Tested 9:55:34 AM 01/14/2026
Smoke Detector 2nd in library Tested 11:35:15 AM 01/14/2026
Smoke Detector 2nd in library H rear Tested 11:36:32 AM 01/14/2026
Smoke Detector 2nd in main stairway Tested 9:55:25 AM 01/14/2026
Smoke Detector 2nd in main stairway Tested 9:55:28 AM 01/14/2026
Smoke Detector 2nd in protect electrical room room 201 N Tested 8:50:34 AM 01/14/2026
Smoke Detector 2nd in protect rear office room 201 N Tested 8:50:20 AM 01/14/2026
Smoke Detector 3rd at elevator 3N hallway Tested 8:39:38 AM 01/14/2026
Smoke Detector 3rd at elevator 3S hallway Tested 8:39:34 AM 01/14/2026
Smoke Detector 3rd in 35 conference room high ceiling Tested 8:15:32 AM 01/14/2026
Smoke Detector 3rd in hallway Tested 8:40:07 AM 01/14/2026
Smoke Detector 3rd in hallway ifo room 33 Tested 8:39:32 AM 01/14/2026
Page of 10 21
Everon Download Date: 02/04/2026
Control Panel: 2Building: MOGAN CULTURAL CENTER
Device Type Location Service Time Date
PASSED (continued)
Initiating (continued)
Smoke Detector 3rd in hallway ifo room 35 Tested 8:39:46 AM 01/14/2026
Smoke Detector 3rd in library Tested 11:35:28 AM 01/14/2026
Smoke Detector 3rd in library Tested 11:35:31 AM 01/14/2026
Smoke Detector 3rd in library Tested 11:35:36 AM 01/14/2026
Smoke Detector 3rd in library Tested 11:35:39 AM 01/14/2026
Smoke Detector 3rd in library Tested 11:35:42 AM 01/14/2026
Smoke Detector 3rd in library Tested 11:36:36 AM 01/14/2026
Smoke Detector 3rd in men's room Tested 8:39:41 AM 01/14/2026
Smoke Detector 3rd in room 31 Tested 8:34:31 AM 01/14/2026
Smoke Detector 3rd in room 32 Tested 11:35:56 AM 01/14/2026
Smoke Detector 3rd in room 33 Tested 11:35:50 AM 01/14/2026
Smoke Detector 3rd in room 34 Tested 11:35:53 AM 01/14/2026
Smoke Detector 3rd in south stairwell in skylight Tested 8:40:10 AM 01/14/2026
Smoke Detector 3rd in stairwell Tested 9:55:04 AM 01/14/2026
Smoke Detector 3rd in women's room Tested 8:39:43 AM 01/14/2026
FAILED/OTHER
Initiating
Smoke Detector 2nd in library Tested 9:48:12 AM 01/14/2026
Device Type Location Service Time Date
PASSED
Control
Annunciator 1st in main lobby vestibule in utility closet 106 A
Tested 9:57:55 AM 01/14/2026
Page of 11 21 Service Summary
Everon Download Date: 02/04/2026
SERVICE SUMMARY
Generated by: BuildingReports.com
The Service Summary section provides an overview of the services performed in this report.
Building: MOGAN CULTURAL CENTER
Device Type Service Quantity
PASSED
Annunciator Tested 1
Battery Tested 2
Beacon Tested 1
Communicator Tested 1
Control Panel Tested 1
Heat Detector Tested 1
Horn/Strobe Tested 3
Pull Station Tested 27
Smoke Detector Tested 66
Total 103
FAILED/OTHER
Smoke Detector Tested 1
Total 1
Grand Total 104
Page of 12 21 Auxiliary Functions Testing
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite MS-9200Building: MOGAN CULTURAL CENTER
AUXILIARY FUNCTIONS TESTING
Generated by: BuildingReports.com
The Auxiliary Functions Testing section lists each of the ancillary items, systems, and emergency equipment that are controlled by the system control unit. Items are grouped by Passed or Failed/Other. The items are listed by device type, and a check box is provided to indicate if the test conducted was simulated.
Type Location Comment ScanID Simulated
PASSED
Smoke Detector
Elevator Recall 1st in elevator machine room w.peoples ifo 107A
Passed 69631760
Elevator Recall 1st in main lobby ifo south elevator Passed 69631754
Elevator Recall 1st in main lobby w.peoples ifo north elevator Passed 69631757
Elevator Recall 3rd at elevator 3N hallway Passed 69631816
Elevator Recall 3rd at elevator 3S hallway Passed 69631817
Page of 13 21 Sound and Visual Testing
Everon Download Date: 02/04/2026
SOUND AND VISUAL TESTING
Generated by: BuildingReports.com
The Sound and Visual Testing section lists various points throughout your building where audible and visual alarm notification devices were tested. Any bar-coded audible and visual devices will appear in the Inspection and Testing section of this report.
Items in this section are grouped by Passed or Failed/Other. Where specific decibel readings were recorded, they will appear under the ambient and alarm columns. The Voice column indicates whether the Sound Test Point passed the Voice Intelligibility requirements. The STI or Sound Transmission Index is shown if recorded.
Building: MOGAN CULTURAL CENTER
Location Comment Ambient Alarm Voice
Intelligibility STI Sound Test
PASSED
Sound Test
Entire Building 1/14/2025 Passed ☐ 0001
Audible/Visual Appliances Location Comment Ambient Alarm Synched ScanID
PASSED
Horn/Strobe
1st in all areas x13 Passed ☐ 69631740
2nd in all areas. x17 Passed ☐ 69631741
3rd in all areas. x15 Passed ☐ 69631742
Page of 14 21 Battery & Power Supply Testing
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite MS-9200Building: MOGAN CULTURAL CENTER
BATTERY & POWER SUPPLY TESTING
Generated by: BuildingReports.com
The Battery & Power Supply Testing section details the readings and measurements of batteries and power supplies used to provide power to the fire alarm and life safety systems. Items are grouped by Passed or Failed/Other.
Battery
Type Location Rated
Ah Rated Volts
Pre Test
Post Test
Min Ah
Teste d Ah
MFG
Date
PASSED
Sealed Lead Acid 1st in FACU room off loading dock in utility closet 106 A
7 12 08/23 /2023
Sealed Lead Acid 1st in communicator FACU room off loading dock in utility closet 106 A
7 12 08/23 /2023
Page of 15 21 Inventory & Warranty Report
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite MS-9200Building: MOGAN CULTURAL CENTER
INVENTORY & WARRANTY REPORT
Generated by: BuildingReports.com
The Inventory & Warranty Report lists each of the devices and items that are included in your Inspection Report. A complete inventory count by device type and category is provided. Items installed within the last 90 days, within the last year, and devices installed for two years or more are grouped together for easy reference.
Building: MOGAN CULTURAL CENTER
Device or Type Category % of Inventory Quantity
Annunciator Control 0.95% 1
Battery Control 1.90% 2
Beacon Indicating 0.95% 1
Communicator Control 0.95% 1
Control Panel Control 0.95% 1
Heat Detector Initiating 0.95% 1
Horn/Strobe Indicating 2.86% 3
Pull Station Initiating 25.71% 27
Smoke Detector Initiating 63.81% 67
Sound Test Indicating 0.95% 1
Type Qty Model # Description Install Date
IN SERVICE - 2 YEARS TO 3 YEARS
Fire-Lite
Control Panel 1 MS-9200 Addressable 01/19/2024
Pull Station 27 BG-10LX Dual Action 01/19/2024
Smoke Detector 51 SD300 Photoelectric 01/19/2024
Smoke Detector 16 SD355 Photoelectric 01/19/2024
Keltron
Page of 16 21
Everon Download Date: 02/04/2026
Control Panel: 2Building: MOGAN CULTURAL CENTER
Type Qty Model # Description Install Date
IN SERVICE - 2 YEARS TO 3 YEARS (continued)
Keltron (continued)
Communicator 1 MB #2592 Digital Radio 01/19/2024
Simplex
Beacon 1 519-346 Alarm 01/19/2024
Horn/Strobe 3 519-346 01/19/2024
System Sensor
Heat Detector 1 5601P Fixed Temperature 01/19/2024
Universal battery
Battery 1 UB1270 Sealed Lead Acid 08/23/2023
Battery 1 UB1270 x2 Sealed Lead Acid 08/23/2023
Type Qty Model # Description Install Date
IN SERVICE - 2 YEARS TO 3 YEARS
Fire-Lite
Annunciator 1 LED List 01/19/2024
Page of 17 21 Zone Address Report
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite MS-9200Building: MOGAN CULTURAL CENTER
ZONE ADDRESS REPORT
Generated by: BuildingReports.com
The Zone Address Report lists all of the devices and items that have an individual address, or are grouped together under a common zone. The device type, location, and description are included for your reference.
Address Device Type Location Type ScanID
ZONE/CIRCUIT: 1
D002 Smoke Detector 1st in men's restroom 104 Photoelectric 69631751
D004 Smoke Detector 1st in women's restroom 105 Photoelectric 69631750
D005 Smoke Detector 1st in one city high ceiling Photoelectric 69631788
D006 Smoke Detector 1st in one city high ceiling Photoelectric 69631793
D014 Smoke Detector 1st in boiler room 106 B electrical room Photoelectric 69631772
D016 Smoke Detector 1st in rear stairwell exit 103 Photoelectric 69631792
D019 Smoke Detector 1st in 102 boarding house kitchen Photoelectric 69631764
D023 Smoke Detector 1st in one city high ceiling Photoelectric 69631787
D024 Smoke Detector 1st in 102 boarding house keepers room Photoelectric 69631765
D033 Smoke Detector 1st in 102 boarding house dining room Photoelectric 69631766
D046 Smoke Detector 1st in elevator machine room w.peoples ifo 107A
Photoelectric 69631760
D056 Smoke Detector 1st in library break room 103 Photoelectric 69631769
D057 Smoke Detector 1st in library Kerouac room 103 Photoelectric 69631770
D058 Smoke Detector 1st in library 103 Photoelectric 69631768
D060 Smoke Detector 1st in library 103 Photoelectric 69631776
D061 Smoke Detector 1st in library 103 Photoelectric 69631777
D062 Smoke Detector 1st in library 103 Photoelectric 69631775
D063 Smoke Detector 1st in library 103 Photoelectric 69631778
D064 Smoke Detector 1st in library office 103 Photoelectric 69631779
Page of 18 21
Everon Download Date: 02/04/2026
Address Device Type Location Type ScanID
ZONE/CIRCUIT: 1 (continued)
D066 Smoke Detector 1st in library 103 Photoelectric 69631773
D069 Smoke Detector 1st in w. peoples 107 gallery Photoelectric 69631758
D070 Smoke Detector 1st in w. peoples 107 gallery Photoelectric 69631759
D072 Smoke Detector 1st in main lobby w.peoples ifo north elevator
Photoelectric 69631757
D073 Smoke Detector 1st in main lobby ifo east entrance Photoelectric 69631755
D075 Smoke Detector 1st in main lobby ifo south elevator Photoelectric 69631754
D076 Smoke Detector 1st in main lobby ifo 103 Photoelectric 69631753
D077 Smoke Detector 1st in main hallway ifo restrooms Photoelectric 69631752
D078 Smoke Detector 1st in rear M. Lobby loading dock Photoelectric 69631746
D079 Smoke Detector 1st in main lobby on ramp Photoelectric 69631790
D080 Smoke Detector 1st in main lobby ifo one city exhibit Photoelectric 69631789
D081 Smoke Detector 1st in one city Photoelectric 69631785
D082 Smoke Detector 1st in facu room receiving dock Photoelectric 69631747
M001 Pull Station 1st in rear exit at stairwell Dual Action 69631791
M005 Heat Detector 1st in boiler room 106 B Fixed Temperature
69631771
M020 Pull Station 1st at east entrance boarding house Dual Action 69631767
M020 Pull Station 1st in library 103 Dual Action 69631774
M024 Pull Station 1st in facu room receiving dock Dual Action 69631748
M065 Pull Station 1st in library 103 Dual Action 69631780
M067 Pull Station 1st at east entrance w. peoples in 108 great room rear
Dual Action 69631762
M068 Pull Station 1st at east entrance w. peoples in 108 great room rear
Dual Action 69631763
M071 Pull Station 1st at east entrance w. peoples in 107 Dual Action 69631761
M074 Pull Station 1st at east entrance Dual Action 69631756
M084 Pull Station 1st at main lobby front entrance Dual Action 69631782
Page of 19 21
Everon Download Date: 02/04/2026
Address Device Type Location Type ScanID
ZONE/CIRCUIT: 1 (continued)
M085 Pull Station 1st at main lobby vestibule Dual Action 69631781
M086 Pull Station 1st at one city entrance Dual Action 69631784
M087 Pull Station 1st at one city NW peoples exit Dual Action 69631786
M088 Pull Station 1st in rear M. Lobby restrooms Dual Action 69631749
M089 Pull Station 1st in rear M. Lobby receiving dock Dual Action 69631745
ZONE/CIRCUIT: 2
D011 Smoke Detector 2nd in hallway south elevator Photoelectric 69631909
D012 Smoke Detector 2nd in main stairway Photoelectric 69631908
D013 Smoke Detector 2nd in main stairway Photoelectric 69631907
D015 Smoke Detector 2nd in hallway North elevator Photoelectric 69631910
D017 Smoke Detector 2nd in protect electrical room room 201 N Photoelectric 69631920
D018 Smoke Detector 2nd in protect rear office room 201 N Photoelectric 69631917
ZONE/CIRCUIT: 3
D001 Smoke Detector 3rd in room 31 Photoelectric 69631903
D003 Smoke Detector 3rd in 35 conference room high ceiling Photoelectric 69631811
D020 Smoke Detector 2nd in exhibit handicap w. peoples Photoelectric 69631914
D021 Smoke Detector 2nd in exhibit w. peoples Photoelectric 69631915
D022 Smoke Detector 2nd in exhibit w. peoples lighting control room
Photoelectric 69631921
D025 Smoke Detector 3rd at elevator 3S hallway Photoelectric 69631817
D026 Smoke Detector 3rd in hallway ifo room 33 Photoelectric 69631819
D027 Smoke Detector 3rd in room 33 Photoelectric 69631820
D028 Smoke Detector 3rd in room 34 Photoelectric 69631901
D029 Smoke Detector 3rd at elevator 3N hallway Photoelectric 69631816
D030 Smoke Detector 3rd in men's room Photoelectric 69631815
D031 Smoke Detector 3rd in women's room Photoelectric 69631814
Page of 20 21
Everon Download Date: 02/04/2026
Address Device Type Location Type ScanID
ZONE/CIRCUIT: 3 (continued)
D032 Smoke Detector 3rd in hallway ifo room 35 Photoelectric 69631813
D034 Smoke Detector 3rd in stairwell Photoelectric 69631794
D035 Smoke Detector 3rd in hallway Photoelectric 69631906
D037 Smoke Detector 3rd in room 32 Photoelectric 69631902
D040 Smoke Detector 2nd in library Photoelectric 69631796
D041 Smoke Detector 2nd in library Photoelectric 69631797
D042 Smoke Detector 2nd in library H rear Photoelectric 69631919
D043 Smoke Detector 3rd in library Photoelectric 69631798
D044 Smoke Detector 3rd in library Photoelectric 69631799
D047 Smoke Detector 2nd in library Photoelectric 69631801
D049 Smoke Detector 2nd in library Photoelectric 69631802
D050 Smoke Detector 2nd in library Photoelectric 69631803
D051 Smoke Detector 3rd in library Photoelectric 69631804
D052 Smoke Detector 3rd in library Photoelectric 69631805
D054 Smoke Detector 3rd in library Photoelectric 69631806
D055 Smoke Detector 3rd in library Photoelectric 69631807
D083 Smoke Detector 3rd in south stairwell in skylight Photoelectric 69631913
M002 Pull Station 3rd in room 31 Dual Action 69631904
M004 Pull Station 3rd in room 33 room 35 Dual Action 69631810
M014 Pull Station 2nd at elevator lobby Dual Action 69631912
M016 Pull Station 2nd at elevator Dual Action 69631911
M019 Pull Station 2nd at in 201n exit to rear stairway Dual Action 69631916
M033 Pull Station 3rd in hallway Dual Action 69631812
M034 Pull Station 3rd in library Dual Action 69631795
M036 Pull Station 3rd in hallway south exit Dual Action 69631905
M038 Pull Station 3rd in hallway ifo room 33 Dual Action 69631818
Page of 21 21
Everon Download Date: 02/04/2026
Address Device Type Location Type ScanID
ZONE/CIRCUIT: 3 (continued)
M046 Pull Station 2nd at top of stairs in library Dual Action 69631918
M048 Pull Station 3rd in library Dual Action 69631809
M053 Pull Station 2nd in library Dual Action 69631808
Park Headquarters 67 Kirk Street Lowell, MA 01852 225-999-3548
Building Contact: Ron Bain Title: Head of Vendor Management
Company: Everon Contact: Jim Jalbert Title: Inspector
Inspection Date: Jan 13, 2026 Tested to NFPA 72 Standards
Fire Alarm Systems
INSPECTION
CERTIFICATE
This Inspection was performed in accordance with applicable NFPA Standards. The subsequent pages of this report provide performance measurements, listed ranges of acceptable results, and complete documentation of the inspection. Whenever discrepancies exist between acceptable performance standards and actual test results, notes and/or recommended solutions have been proposed or provided for
Page of 2 20
Everon Download Date: 02/04/2026
EXECUTIVE SUMMARY
Generated by: BuildingReports.com
Building Information Park Headquarters 67 Kirk Street Lowell, MA 01852 United States of America
Contact: Ron Bain
Phone: 225-999-3548
Fax:
Mobile:
Email: ron@hurtvet.com
Inspection Performed By Everon 300 Myles Standish Blvd Taunton, MA 02780 United States of America
Inspector: Jim Jalbert
Phone: (781) 888-1717
Fax:
Mobile:
Email: jjalbert@everonsolutions.com
System Control Unit Manufacturer: Fire-Lite Inspection Date: 01/13/2026 IDC Style: B
Model Number: es200x Install Date: 02/01/2024 SLC Style: A
Software Version: 1 Version Date: 02/01/2024 NAC Style: A
Location: bsmt bsmt Disconnect Location: Disconnect Type:
Current Protection: Breaker
Central Station Signal Verification Type: Mfg: Model #:
Test Time/Date: Restore Time: Note:
Type of Signal Signal Confirmed Time Notes
Alarm/Trouble/Supervisory
Page of 3 20
Everon Download Date: 02/04/2026
Building: Park Headquarters Contact: Ron Bain
Company: Everon Inspector: Jim Jalbert
Signed: Jan 13, 2026
Inspection Summary
Category
Total Items Serviced Passed Failed/Other
Qty % Qty % Qty % Qty %
Control 6 5.45% 6 100.00% 6 100.00% 0 0.00%
Indicating 8 7.27% 6 75.00% 6 100.00% 0 0.00%
Initiating 95 86.36% 89 93.68% 89 100.00% 0 0.00%
Monitor 1 0.91% 1 100.00% 1 100.00% 0 0.00%
Totals 110 100% 102 92.73% 102 100.00% 0 0.00%
Page of 4 20
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite es200xBuilding: Park Headquarters
INSPECTION & TESTING
Generated by: BuildingReports.com
The Inspection & Testing section lists all of the items inspected in your building. Items are grouped by Passed or Failed/Other .
Items are listed by Category. Each item includes the services performed, and the time & date at which testing occurred.
Device Type Location Service Time Date
PASSED
Control
Annunciator 1st in rear entry Page St. right Tested 10:18:18 AM 01/13/2026
Battery bsmt bsmt Tested 10:02:07 AM 01/13/2026
Battery bsmt bsmt Tested 10:02:18 AM 01/13/2026
Battery bsmt bsmt Tested 10:03:20 AM 01/13/2026
Control Panel bsmt bsmt Tested 10:02:02 AM 01/13/2026
Power Supply bsmt bsmt Tested 10:03:15 AM 01/13/2026
Indicating
Beacon 1st outside Page St. entrance Tested 10:02:59 AM 01/13/2026
Horn/Strobe bsmt bsmt Tested 11:15:12 AM 01/13/2026
Horn/Strobe 1st Tested 10:02:36 AM 01/13/2026
Horn/Strobe 2nd Tested 10:02:45 AM 01/13/2026
Horn/Strobe 3rd Tested 10:02:52 AM 01/13/2026
Initiating
Heat Detector bsmt bathroom heat Tested 10:04:32 AM 01/13/2026
Heat Detector bsmt bathroom heat Tested 10:05:14 AM 01/13/2026
Heat Detector bsmt boiler rm heat Tested 10:06:33 AM 01/13/2026
Heat Detector bsmt bsmt Tested 10:01:53 AM 01/13/2026
Heat Detector bsmt bsmt heat Tested 10:03:46 AM 01/13/2026
Heat Detector bsmt bsmt heat Tested 10:04:02 AM 01/13/2026
Page of 5 20
Everon Download Date: 02/04/2026
Device Type Location Service Time Date
PASSED (continued)
Initiating (continued)
Heat Detector bsmt bsmt heat Tested 10:04:19 AM 01/13/2026
Heat Detector bsmt decoration rm heat Tested 10:12:13 AM 01/13/2026
Heat Detector bsmt janitor closet heat Tested 10:06:08 AM 01/13/2026
Heat Detector bsmt paper room heat Tested 10:05:34 AM 01/13/2026
Heat Detector bsmt plans room Tested 10:06:57 AM 01/13/2026
Heat Detector bsmt supply room heat Tested 10:09:00 AM 01/13/2026
Heat Detector bsmt tunnel heat Tested 10:13:02 AM 01/13/2026
Heat Detector bsmt tunnel heat Tested 10:13:54 AM 01/13/2026
Heat Detector 1st in hallway inf restroom right Tested 11:24:29 AM 01/13/2026
Heat Detector 1st in restroom left Tested 11:24:24 AM 01/13/2026
Heat Detector 1st in restroom right Tested 11:29:46 AM 01/13/2026
Heat Detector 1st in vestibule left Tested 11:24:18 AM 01/13/2026
Heat Detector 2nd in restroom Tested 11:30:48 AM 01/13/2026
Heat Detector 2nd in hallway ifo restroom Tested 11:30:36 AM 01/13/2026
Heat Detector 2nd in hallway front left ifo 203 Tested 11:31:25 AM 01/13/2026
Heat Detector 2nd in kitchen 209 Tested 11:30:58 AM 01/13/2026
Heat Detector 2nd in left restroom Tested 11:31:59 AM 01/13/2026
Heat Detector 2nd in office left 201 Tested 11:31:37 AM 01/13/2026
Heat Detector 2nd in office left 202 Tested 11:31:55 AM 01/13/2026
Heat Detector 2nd in office left 203 Tested 11:31:07 AM 01/13/2026
Heat Detector 2nd in office left 206 Tested 10:03:04 AM 01/13/2026
Heat Detector 2nd in office right 205 Tested 11:31:02 AM 01/13/2026
Heat Detector 2nd in office right 207 Tested 11:30:11 AM 01/13/2026
Heat Detector 2nd in office right 208 Tested 11:30:16 AM 01/13/2026
Heat Detector 2nd in office right 209 Tested 11:30:53 AM 01/13/2026
Page of 6 20
Everon Download Date: 02/04/2026
Device Type Location Service Time Date
PASSED (continued)
Initiating (continued)
Heat Detector 2nd in rear stairwell Tested 11:32:02 AM 01/13/2026
Heat Detector 3rd in elevator lobby Tested 11:33:04 AM 01/13/2026
Heat Detector 3rd in office 304 Tested 11:33:17 AM 01/13/2026
Heat Detector 3rd in office 305 Tested 10:49:25 AM 01/13/2026
Heat Detector 3rd in office 306 Tested 11:32:54 AM 01/13/2026
Heat Detector 3rd in office 307 Tested 11:32:40 AM 01/13/2026
Heat Detector 3rd in office 308 Tested 11:32:44 AM 01/13/2026
Heat Detector 3rd in office left 301 Tested 11:32:57 AM 01/13/2026
Heat Detector 3rd in office left 302 Tested 11:33:01 AM 01/13/2026
Heat Detector 3rd in office left 303 Tested 11:33:11 AM 01/13/2026
Pull Station bsmt bsmt pull Tested 11:18:23 AM 01/13/2026
Pull Station bsmt hallway pull Tested 11:18:36 AM 01/13/2026
Pull Station bsmt tunnel at school pull Tested 11:14:57 AM 01/13/2026
Pull Station bsmt tunnel to boiler heat Tested 11:15:06 AM 01/13/2026
Pull Station bsmt tunnel to boiler pull Tested 11:15:01 AM 01/13/2026
Pull Station 1st at front exit left Tested 10:32:57 AM 01/13/2026
Pull Station 1st at front exit right Tested 10:27:06 AM 01/13/2026
Pull Station 1st at rear hallway left Tested 10:34:18 AM 01/13/2026
Pull Station 1st at rear hallway right Tested 10:20:47 AM 01/13/2026
Pull Station 1st at rear hallway exit to Page St. off room 108 right
Tested 10:18:31 AM 01/13/2026
Pull Station 1st at rear hallway handicap door left Tested 10:35:36 AM 01/13/2026
Pull Station 1st at rear hallway porch exit right Tested 10:19:49 AM 01/13/2026
Pull Station 2nd at hallway right Tested 10:44:51 AM 01/13/2026
Pull Station 2nd at hallway front left Tested 10:39:59 AM 01/13/2026
Page of 7 20
Everon Download Date: 02/04/2026
Device Type Location Service Time Date
PASSED (continued)
Initiating (continued)
Pull Station 2nd at hallway front right Tested 10:43:04 AM 01/13/2026
Pull Station 2nd at rear top of stairs left Tested 11:31:50 AM 01/13/2026
Pull Station 2nd at rear top of stairs right Tested 11:13:43 AM 01/13/2026
Pull Station 3rd at rear top of stairs left Tested 10:53:16 AM 01/13/2026
Pull Station 3rd at rear top of stairs right Tested 10:50:01 AM 01/13/2026
Smoke Alarm bsmt bathroom hall smoke Tested 10:16:07 AM 01/13/2026
Smoke Alarm bsmt janitor closet heat Tested 10:06:17 AM 01/13/2026
Smoke Detector bsmt bsmt elevator smk Tested/Cleaned 10:09:28 AM 01/13/2026
Smoke Detector bsmt bsmt hallway smk Tested/Cleaned 11:14:52 AM 01/13/2026
Smoke Detector bsmt records rm smk Tested/Cleaned 10:11:47 AM 01/13/2026
Smoke Detector 1st in elevator lobby in office 104 Tested/Cleaned 11:18:06 AM 01/13/2026
Smoke Detector 1st in hallway next to stairs Tested/Cleaned 11:10:15 AM 01/13/2026
Smoke Detector 1st in hallway next to stairs left Tested/Cleaned 11:10:10 AM 01/13/2026
Smoke Detector 1st in hallway next to stairs right Tested/Cleaned 11:11:59 AM 01/13/2026
Smoke Detector 1st in mail room office 105 Tested/Cleaned 11:10:41 AM 01/13/2026
Smoke Detector 1st in office 101 Tested/Cleaned 11:10:02 AM 01/13/2026
Smoke Detector 1st in office 103 Tested/Cleaned 11:10:06 AM 01/13/2026
Smoke Detector 1st in office 106 Tested/Cleaned 11:12:04 AM 01/13/2026
Smoke Detector 1st in office 107 Tested/Cleaned 11:10:49 AM 01/13/2026
Smoke Detector 1st in office 108 Tested/Cleaned 11:13:07 AM 01/13/2026
Smoke Detector 1st in office 109 Tested/Cleaned 11:29:56 AM 01/13/2026
Smoke Detector 1st in office closet 103 Tested/Cleaned 11:09:56 AM 01/13/2026
Smoke Detector 1st in rear entry Page St. right Tested/Cleaned 11:12:55 AM 01/13/2026
Smoke Detector 1st in top basement stair Page St. right Tested/Cleaned 11:13:02 AM 01/13/2026
Smoke Detector 2nd in elevator lobby in office 204 Tested/Cleaned 11:31:22 AM 01/13/2026
Page of 8 20
Everon Download Date: 02/04/2026
Device Type Location Service Time Date
PASSED (continued)
Initiating (continued)
Smoke Detector 2nd in front hallway ifo 207 Tested/Cleaned 11:13:15 AM 01/13/2026
Smoke Detector 2nd in hallway ifo 204 Tested/Cleaned 11:14:09 AM 01/13/2026
Smoke Detector 2nd in hallway ifo 205 Tested/Cleaned 11:14:00 AM 01/13/2026
Smoke Detector 2nd in hallway ifo 208 Tested/Cleaned 11:13:21 AM 01/13/2026
Smoke Detector 2nd in top of stairs right Tested/Cleaned 11:13:50 AM 01/13/2026
Smoke Detector 3rd in office right 304 Tested/Cleaned 11:14:27 AM 01/13/2026
Smoke Detector 3rd in office middle right Tested/Cleaned 11:14:37 AM 01/13/2026
Smoke Detector 3rd in stairwell rear left Tested/Cleaned 11:14:22 AM 01/13/2026
Smoke Detector 3rd in stairwell rear right Tested/Cleaned 11:14:31 AM 01/13/2026
Monitor
Monitoring bsmt bsmt Tested 10:02:13 AM 01/13/2026
UNTESTED
Initiating
Duct Detector bsmt paper room heat
Duct Detector bsmt tunnel duct
Heat Detector bsmt tunnel at school heat
Heat Detector bsmt tunnel to boiler heat
Smoke Detector bsmt elevator machine rm smk
Smoke Detector 3rd in elevator lobby in office
Page of 9 20
Everon Download Date: 02/04/2026
SERVICE SUMMARY
Generated by: BuildingReports.com
The Service Summary section provides an overview of the services performed in this report.
Building: Park Headquarters
Device Type Service Quantity
PASSED
Annunciator Tested 1
Battery Tested 3
Beacon Tested 1
Control Panel Tested 1
Heat Detector Tested 41
Horn/Strobe Tested 4
Monitoring Tested 1
Power Supply Tested 1
Pull Station Tested 19
Smoke Alarm Tested 2
Smoke Detector Tested/Cleaned 27
Total 101
UNTESTED
Duct Detector 2
Heat Detector 2
Smoke Detector 2
Total 6
Grand Total 107
Page of 10 20
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite es200xBuilding: Park Headquarters
AUXILIARY FUNCTIONS TESTING
Generated by: BuildingReports.com
The Auxiliary Functions Testing section lists each of the ancillary items, systems, and emergency equipment that are controlled by the system control unit. Items are grouped by Passed or Failed/Other. The items are listed by device type, and a check box is provided to indicate if the test conducted was simulated.
Type Location Comment ScanID Simulated
PASSED
Smoke Detector
Elevator Recall 1st in elevator lobby in office 104 Passed 76762846
Elevator Recall 2nd in elevator lobby in office 204 Passed 76762877
UNTESTED
Smoke Detector
Elevator Recall 3rd in elevator lobby in office 76762889
Page of 11 20
Everon Download Date: 02/04/2026
SOUND AND VISUAL TESTING
Generated by: BuildingReports.com
The Sound and Visual Testing section lists various points throughout your building where audible and visual alarm notification devices were tested. Any bar-coded audible and visual devices will appear in the Inspection and Testing section of this report.
Items in this section are grouped by Passed or Failed/Other. Where specific decibel readings were recorded, they will appear under the ambient and alarm columns. The Voice column indicates whether the Sound Test Point passed the Voice Intelligibility requirements. The STI or Sound Transmission Index is shown if recorded.
Building: Park Headquarters
Location Comment Ambient Alarm Voice
Intelligibility STI Sound Test
PASSED
Sound Test entire building 1-13-2026 Passed ☐ 0003
UNTESTED
Sound Test
Entire Building 2/1/2024 ☐ 0001 entire building 10-22-2024 ☐ 0002
Audible/Visual Appliances Location Comment Ambient Alarm Synched ScanID
PASSED
Horn/Strobe bsmt bsmt Passed ☐ 76762822
1st Passed ☐ 76762823
2nd Passed ☐ 76762824
3rd Passed ☐ 76762825
Page of 12 20
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite es200xBuilding: Park Headquarters
BATTERY & POWER SUPPLY TESTING
Generated by: BuildingReports.com
The Battery & Power Supply Testing section details the readings and measurements of batteries and power supplies used to provide power to the fire alarm and life safety systems. Items are grouped by Passed or Failed/Other.
Battery
Type Location Rated
Ah Rated Volts
Pre Test
Post Test
Min Ah
Teste d Ah
MFG
Date
PASSED
Sealed Lead Acid bsmt bsmt 35AH 12 02/01 /2024
Sealed Lead Acid bsmt bsmt 7 12 02/01 /2024
Page of 13 20
Everon Download Date: 02/04/2026
Control Panel: 1 - Fire-Lite es200xBuilding: Park Headquarters
INVENTORY & WARRANTY REPORT
Generated by: BuildingReports.com
The Inventory &…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .