This document is a Request for Information (RFI) Amendment 0001 for Solicitation 140P4325Q0055, focused on replacing security cameras at an ASIS facility managed by the Department of the Interior National Park Service Northeast Region. The RFI provides detailed facility infrastructure insights through ten specific questions and answers, covering facility age, square footage, power stability, infrastructure details, and existing technological systems.

Key details include a second site visit scheduled for Thursday, July 17, 2025, at 10:00am EDT, located at 6633 Bayberry Drive, Berlin, Maryland. The facility consists of a Ranger Station (approximately 3,000 sq. ft., built in early 2010s) and a Visitor Center (approximately 11,699 sq. ft., built in 2008). Infrastructure notes indicate stable power, mostly dropped ceilings, drywall/wood framing perimeter walls, and existing cable infrastructure. The new Command Control system will be located in the same place as the existing system, with HVAC serving separate building zones.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P4325Q0055, ASIS Camera Amendment 0001 RFIs 1-10

****A second site visit will be held Thursday, July 17, 2025, at 10:00am EDT. Contractors to meet at 6633 Bayberry Drive, Berlin, Maryland 21811. *****

About the Facility Infrastructure:

1. How old are the facilities?

Response: The Ranger Station (Visitor Contact Station) is from the early 2010’s and the Visitor Center is from 2008.

2. How much square footage are in the facilities?

Response: Ranger Station is approximately 3,000 sq. ft The Visitor Center is approximately 11,699 sq ft.

3. How stable is the power?

Response: Stable

4. Is there a dropped ceiling in all areas of installation?

Response: Not in all the areas but most, some areas are metal paneling, conduit and drywall but these areas are a smaller percentage.

5. What type of walls are in the perimeter areas?

Response: Drywall/Wood Framing

6. Do we need to drill between the walls, to run our cable infrastructure?

Response: There is an existing system in most of these areas, there should be little drilling, but could be some.

7. Are the door frames metal and concrete filled?

Response: No

CCTV:

8. Is the existing Command Control (SOC) well ventilated?

Response: Yes

9. How far apart will the new Command Control be from the old command control system?

Response: It will be in the same location. Please refer to SOW attachments for reference.

10. Is there a special room with HVAC allocated for the new Servers?

Response: There is not a special room, but the HVAC has separate zones in these building.