CACO - REHAB OF COAST GUARD BEACH RESTROOM
Solicitation number
140P4320R0016
Issued by

View the file

Other files

File Type Posted
STATEMENT OF WORK ADDENDUM_0001.pdf PDF
Sol_140P4320R0016_Amd_0001.pdf PDF
B03 DOL DBA GD MA20200001.pdf PDF
A04 SOW.pdf PDF
Sol_140P4320R0016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

The following answers are provided for questions received on this solicitation:

1. Q: Should my bid include replacement of the kitchen floor?

A: No, kitchen floor is not included in scope.

2. Q: Conductor heads on gutters- should they be replaced? Note one is missing from ocean side.

A: No, contractor shall repair conductor heads – see amendment. Park will provide missing conductor head.

3. Q: Downspout receivers are cast iron, buried in the concrete. The scope does not cover the removal of them, correct?

A: No, Removal of downspout receivers is not included in scope. Contractor shall scrape and re-finish as indicated in scope.

4. Q: Has the building been inspected for asbestos

A: No, see first paragraph at top of page 3 – not tested.