This document is an amendment to a Request for Proposal (RFP) for historic masonry conservation and restoration of the Samuel Gompers Statue and Edmund Burke Memorial located at the National Mall and Memorial Parks in Washington, DC. The purpose of the amendment is to revise the Statement of Work, incorporate an updated Department of Labor Wage Determination, and revise Sections C and J of the solicitation. The period of performance is from September 26, 2024 to September 1, 2025. The project includes the completion of condition assessments, conservation treatment, and high-level resource documentation for the statuary using techniques such as high resolution digital photography, measured drawings, photogrammetry, and laser scanning. The government estimate for the project is between $100,000 and $250,000. Offers must acknowledge receipt of the amendment prior to the specified date and time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P3024R0031 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PWA
Denver CO 80225 P.O.Box 25287 MS WCP NPS, WASO - WCP Contracting
08/20/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/20/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This is Amendment P0001 for the Request for Proposal (RFP) 140P3024R0031 for historic masonry conservation and restoration of the Samuel Gompers Statue and Edmund Burke Memorial located at the National Mall and Memorial Parks in Washington, DC.
The purpose of this Amendment P0001 is to do the following:
A) Revise Statement of Work and replace with Amendment 1 Attachment 1 Statement of Work
Revised.
B) Incorporate update to wage determination DC20240002 and replace with Amendment 1
Attachment 1 DOL WD DC20240002 effective 8-23-2024.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bophany Drakeford
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 56
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P3024R0031/0001
C) Revise Section C and J as highlighted in this
Amendment P0001 to reflect the Attachments.
All other terms and conditions remain unchanged as a result of this Amendment P0001.
Period of Performance: 09/26/2024 to 09/01/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
Solicitation 140P3024R0031
PAGE OF
3 | 56
SECTION B – PRICE SCHEDULE
National Park Service – National Capital Area National Mall and Memorial Parks
Restore Samuel Gompers Statue and Edmund Burke Memorial
BASE ITEM CLIN 00010
LINE
ITEM DESCRIPTION QUANTITY UNIT *AMOUNT
CLIN
00010A Labor 1 L.S.
00010B Equipment 1 L.S.
00010C Materials 1 L.S.
00010D
Brief Condition Assessment Prior to Work Beginning (total of 2 assessments for each statue)
1 L.S.
00010E
Heritage Documentation (Photographic and Digital) for both statues 1 L.S.
**Sub-Total CLIN 00010
CONTRACTOR MARKUPS
DESCRIPTION PERCENTAGE AMOUNT
SUBCONTRACTOR OVERHEAD
SUBCONTRACTOR PROFIT
SUBCONTRACTOR BOND
SUBCONTRACTOR TOTAL
CONTRACTOR OVERHEAD
CONTRACTOR PROFIT
CONTRACTOR BOND
CONTRACTOR TOTAL
***TOTAL CLIN 00010
*Amounts (All amounts shall be rounded to the nearest whole dollar).
**Sub Total CLIN 00010 (Add CLIN 000010A – 000010E) ***Total CLIN 00010 (Add Sub Total + Subcontractor Total + Contractor Total)
4 | 56
The above completed price schedule shall include all labor, materials, supplies, equipment, transportation, supervision, ancillary services, and all other necessary items to complete this project in accordance with the awarded contract. Any provided measurements are estimated quantities for estimation purposes only and are subject to field verification and any increases/decreases in these lines is subject to the proposed unit costs included in the award. Contract modifications and price adjustments shall not be granted based on conditions that could be determined prior to award.
FAR 36.204 Disclosure of the magnitude of construction projects
The Government’s estimate is:
Between $100,000 and $250,000
5 | 56
SECTION C – SPECIFICATIONS/DRAWINGS
C.0 NATIONAL PARK SERVICE
The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations.
The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.
The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.
C.1 BACKGROUND
The NPS National Mall and Memorial Parks (NAMA) is America’s front yard right in the heart of the nation’s capital that brings visitors face to face with larger-than-life presidents and visionaries, open park lands, and elaborate memorials honoring our nation’s veterans and military history. NAMA is visited by approximately 25 million visitors each year from around the world that want to experience the unique collection of structures and spaces honoring the nation, its democracy, and its citizenry.
The National Mall is the great swath of green in the middle of Washington, DC that stretches from the foot of the United States Capitol building to the Potomac River. Both inside, as well as, outside the boundaries of the National Mall there are numerous iconic monuments and memorials that make up the Memorial Parks aspect of NAMA. NAMA protects the National Mall and its iconic monuments and memorials, and over 1,000 acres of greenspace in Washington, DC. NAMA is host and/or the backdrop to hundreds events each year, from the Presidential Inauguration every four (4) years to the yearly National Independence Day Celebration and other large public events. Except for the Washington Monument, the National Mall and Memorial Parks is open 24/7 to the General Public. For more detailed and general information checkout the website at: Basic Information - National Mall and Memorial Parks (U.S. National Park Service) (nps.gov)
SAMUEL GOMPERS STATUE AND EDMUND BURKE
The Samuel Gompers Memorial is located at the intersection of 10th Street, L Street, and Massachusetts Avenue, Northwest, Washington, DC. The Gompers Memorial is part of the National Park Service (NPS)- National Capital Area (NCA)- National Mall and Memorial Parks (NAMA) located in Washington, DC in Reservation 069. The Gompers Memorial is a bronze statue listed on the National Register of Historic Places and is in memory of Samuel Gompers, an English-born American cigar maker, labor union leader and a key figure in American labor history. The memorial was dedicated in 1933 by architect Robert Aitken in the Beaux Arts style.
The Edmund Burke Memorial is located at the junction of 11th Street and Massachusetts Avenue, Northwest, Washington, DC. The Edmund Burke statue was dedicated on October 12, 1922. Burke was an Enlightenment era philosopher that was America’s main ally in Great Britain. He defended our call for liberty within the British Parliament and as a sign of esteem for his support, Burke is now honored in the American capital city. The bronze statue of Edmund Burke is a copy of an 1894 statue in Bristol, England. The original was cast by a Welsh sculptor named John Harvard Thomas. The statue is meant to remind us of the old ties between America and Britain as well as the enduring friendship that has evolved between these two great countries.
https://www.nps.gov/nama/planyourvisit/basicinfo.htm https://www.nps.gov/nama/planyourvisit/basicinfo.htm
6 | 56
C.2 PURPOSE
The intent of this project is to provide cyclic maintenance to the Gompers and Burke statues so that they are maintained and brought to a restored status. There is no known history of past interventions on either of these two memorials and maintenance has been minimal.
The purpose of this project is to provide conservation services to conduct an initial condition assessment, develop a work plan based on found conditions, implement treatment recommendations, and provide a treatment report to include narrative and images describing the conditions found, work performed and recommendations for future treatment and maintenance practices.
The principal features of the work include the erection, maintenance and removal of scaffolding required to carry out the work of this project; the conservation of the bronze elements, the conservation of the granite bases, submission of a conservation treatment report, and high-level resource documentation including high resolution digital photographs (minimum 300 dpi) in TIFF format, laser scanning, measured drawings. For the purposes of this contract, all existing building material is considered historic fabric and the following provides additional details on the requirements to carry out this work.
The project is limited to the bronze Gompers statue and granite base and excludes the cast stone aggregate walkway and steps. For the Burke Memorial, the project is limited to the bronze statue of Burke and the granite base. Unlike the Gompers statue, the Burke statue and base are set on grass, so walkways or stairs are not a consideration.
This project includes the completion of high-level resource documentation for the statuary in the memorial parks using a combination of tools, including high resolution digital photography (minimum 300 dpi in TIFF format), measured drawings, photogrammetry, and laser scanning.
C.3 PERIOD OF PERFORMANCE / DELIVERY DATE
The Contractors proposed schedule for construction will be reviewed for verification of technical understanding of the project requirements (based on number of calendar days, not specific calendar dates). The anticipated period of performance is 120 days after issuance of Notice to Proceed.
Documents Required before and for the Pre-Construction Meeting.
Document Description Due Date 1 Performance and Payment Bonds 10 days after award 2 Certificate of Insurance (COI) 10 days after award 3 SF-1413 for each subcontractor 14 days after award 4 Project Manager Designation Letter 14 days after award 5 Safety Plan 18 days after award 6 Quality Control Plan 18 days after award 7 Waste Management Plan 21 days after award 8 Historic Preservation Treatment Plan 21 days after award 9 Schedule of Values 21 days after award
10 Product & Material Data (Bronze restoration, stone cleaner, stone mortar product)
Ongoing with long lead time items first
11 Construction Schedule 21 days after award 12 Historic Preservation Treatment Plan 21 days after award 13 Daily Work Logs Weekly 14 Certified Payrolls on WH-347 Weekly
7 | 56
15 Condition Assessment Report for Gompers and Burke
Prior to work begin
16 Conservation of Gompers and Burke Prior to Final Invoice 17 Documentation of Gompers and Burke Prior to Final Invoice 18 Treatment Report for Gompers and Burke Prior to Final Invoice 19 Release of Claims DI-137 With Final Invoice 20 Warranty Letter(s) With Final Invoice
C.4 SPECIAL PROJECT SPECIFICATIONS
All specific details, requirements, and drawings are listed in Section J and are considered part of the overall requirements, in addition to everything stated in Section A-J on the award, and K-M in the solicitation.
C.5 GOVERNMENT PROVIDED INFORMATION
• Quality Assurance
• Inspections and Government Acceptance
• CM-16 Submittal Form
• Maps and Pictures
• Specifications
• Product Specifications
• Submittal Log
• Wage Determinations
• Experience Form
• Reference Questionnaire
• Waste Tracking Sheet
C.6 CONTRACTOR AND PRODUCT ADDITIONAL REQUIREMENTS
• The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction and applicable State Regulations.
• Contractor shall be responsible for obtaining all required permits, at no additional cost to the Government (if applicable) and scheduling all applicable inspections. All inspections must be signed off on by the COR and completed prior to receipt of final payment.
• All applicable submittals required, which may include warranty, production information, operation, and maintenance documentation, etc. as defined throughout various sections and specifications must be provided to COR, CS, and CO prior to submission of final invoice. Invoice will be rejected until the required documentation is submitted. Please refer to Section J for all additional documents.
• All trash and debris removal must be in accordance with local, state, and federal regulations.
• All materials and equipment are to be installed per manufacturer’s installation guidance.
C.7 GENERAL PLACE OF PERFORMANCE AND HOURS OF OPERATION
National Capital Area (NCA) National Mall and Memorial Parks (NAMA)
Samuel Gompers Memorial is located at the intersection of 10th Street, L Street, and Massachusetts Avenue, Northwest, Washington, DC in Reservation 069.
Edmund Burke Memorial is located at the junction of 11th Street and Massachusetts Avenue, Northwest, Washington DC.
8 | 56
Normal operational hours are tentatively from 8:00 am to 4:00 PM ET, Monday through Friday.
No work shall occur on weekends or the following Federal Holidays:
New Year’s Day – January 1st
Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th Labor Day – First Monday in September Columbus Day/Indigenous Peoples Day – Second Monday in October Veteran’s Day – November 11th
Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th
Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.
C.8 SITE MANAGEMENT
Maintain walkways, driveways, roads, parking, and project site to be free of all construction debris, equipment, and materials on a daily basis. Maintain site free of hazards at all times. Occupancy access shall be negotiated on a project specific basis. Maintain the level of access provided to the facility through the project duration if tenant occupancy is retained. Safety equipment, fencing and barriers shall be installed per safety plan. Erosion control and sedimentation structures shall be constructed in according with EPA standards as needed. All historical and/or archeological issues shall be addressed as needed and stated in the contract and its attachments.
C.9 RECYCLING AND DISPOSAL OF REFUSE
Except for materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government; all refuse, excess or waste materials resulting from construction operations shall become the property of the contractor (excluding native vegetative and soil debris) and shall be recycled and/or disposed of.
All disposals shall be in accordance with federal, state, and local laws and regulations. No disposal, viewing or sale of materials and/or equipment shall be allowed on Government property.
C.10 SAFETY
During the execution of this contract, the Contractor must conform to the rules and regulations, as amended and as set forth by:
• 29 CFR 1910 – OSHA General Industry Regulations & Standards
• 29 CFR 1926 – OSHA Construction Industry Regulations & Standards
• US Army Corps of Engineers “Safety and Health Requirements” Manual No. 385-1-1 (free online -https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ )
• National Park Service Occupational Safety and Health Program – Reference Manual 50B - Reference Manual
50B: NPS Occupational Safety and Health Program
• Most Recent Superintendent’s Compendium https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/subjects/policy/upload/RM-50B_Contents.pdf?msclkid=621da23cc59111ec9bbf5daecf70f928 https://www.nps.gov/nama/learn/management/superintendent-s-compendium.htm
9 | 56
General Requirements:
Compliance with Reference Manual 50B (RM-50B), NPS Occupational Safety and Health Program, Section 7.0 Contractor Safety: Contractor Safety program responsibilities shall be considered during the requirements development phase of the acquisition. The Contracting Officer’s Representative (COR) and other park staff shall consult with certified Safety Officers for guidance on RM 50B requirements. A comprehensive safety assessment shall be performed to assure any necessary requirements above and beyond existing federal or state safety and health codes are written into the contract specifications. The COR or park representative shall provide the name of a certified Safety Officer to the CO. The CO will consult with the Safety Officer on contract clauses and special conditions. The COR shall ensure contractor compliance with all safety requirements throughout contract performance.
• Work area shall always be maintained in a clean and safe condition.
• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).
• All on-site vehicles will also be marked with the company name (if applicable).
• Use of barricades, ropes, signs, or audible signals is required, and the contractor must take all necessary precautions for the protection of the work, property, and safety of the public.
• Any accident or incident, regarding the work under this contract, shall be reported immediately, in writing, to the
Contracting Officer.
• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking if requested.
Working in a Federal building or federally controlled indoor workspaces:
In order to take steps to prevent the spread of COVID-19 and to protect the health and safety of all Federal employees, onsite contractors, visitors to Federal buildings or Federally controlled indoor workspaces, and other individuals interacting with the Federal workforce, employees under the subject contract who are required to work on site in Federal buildings or Federally controlled indoor worksites must comply with requirements located at https://www.saferfederalworkforce.gov/overview/
C.11 FIRE CONTROL
Contractor's Responsibility for Contractor-Caused Fires. The contractor, whether or not directed by the NPS, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by contractor's employees, whether set directly or indirectly as a result of contractor operations.
The contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the contractor's employees or resulting from contract operations.
(1) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material must be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the NPS when unusually hazardous conditions exist.
(2) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.saferfederalworkforce.gov%2Foverview%2F&data=05%7C01%7CCraig_Madison%40nps.gov%7C017321ae3ce54b2e4c0b08da482089d1%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C637901601831734573%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=vS0Y1s9ZuYGaL%2BfGyy9vfOMdP5VDFAL1SffEADbd3qQ%3D&reserved=0
10 | 56
C.12 TEMPORARY FACILITIES
(a) STAGING AREA: The contractor shall arrange the location for exterior stockpiling of materials (i.e. storage) with the COR/POC. The contractor must be present when any materials are delivered to ensure proper placement within the designated location. The Government will provide an adequate staging area as close to the construction site as practicable.
The Government will NOT provide any secured storage/staging areas for the contractor. The contractor shall be responsible for protecting materials stockpiled against adverse weather, damage, theft, and other risks of loss. The Government assumes no responsibility for material or equipment left in the storage area. Barbed wire nor razor wire is permitted to be used for security purposes for this requirement.
(b) SANITARY FACILITIES: Public toilet facilities are available to the contractor.
(c) WATER, AND ELECTRICITY: The government will provide reasonable amounts of water and electric at preapproved locations. Should water and electricity not be readily available, the contractor shall provide these services as needed to perform the required work at no additional cost to the government.
(d) TELEPHONE: The Contractor may elect to hook-up commercial phone services using the local telephone service provider, at no cost to the Government. Cell phone or wireless access may or may not be available at the construction site.
C.13 SITE PRESERVATION
A. Pollutants such as fuels, lubricants, bitumen’s, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or wastewater from operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
B. Damage: Protect adjacent vegetation, property, structures, exhibits, and improvements from damage.
C. Hazardous Materials: Perform any hazardous materials work in strict accordance with governing hazardous materials regulations. Workers shall be knowledgeable and well trained in the handling of project-specific hazardous materials.
D. Spill Control: Provide effective spill containment measures at the earliest feasible stage of construction.
Regularly inspect and maintain the measures in effective working order.
C.14 EXISTING UTILITIES
The contractor shall field verify all utility locations before digging or trenching. This shall include but not be limited to the use of sonic, electronic, or magnetic detection devices, by noting pull box and utility box locations at the surface, use of locator services, and by test pitting at no additional cost to the Government. The contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.
C.15 CONSTRUCTION SCHEDULE
The Contractor shall submit an initial practicable graphic construction schedule as part of their as described in FAR 52.236-15 – Schedules for Construction Contracts. The Construction Schedule shall be in Gantt Chart Format to include the critical path with an S Curve and shall be of a suitable scale to indicate appropriately the
11 | 56 percentage of the work schedule for completion by a given date. The Construction Schedule shall be replicated and associated with monetary values and titled Schedule of Values. The Schedule of Values shall be submitted to the COR and CO for review and approval in accordance with C.3. The Construction Schedule and Schedule of Values must both include at a minimum:
• The order in which the Contractor proposes to perform the work.
• The dates on which the Contractor contemplates starting and completing the salient features of the project.
• The long lead items and Government furnished property (if applicable).
The Contractor must submit updated schedule at least bi-monthly to the COR depicting progress of the work completed to date. The Contractor must notify the COR/CO in writing whenever there are significant departures from the approved Construction Schedule. Any requests to modify the Construction Schedule, in writing to the Contracting Officer with an explanation for the deviation.
C.16 ENVIRONMENTAL REGULATIONS
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to:
• Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards;
• Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ);
• Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ);
• Endangered Species Act, as amended (16 U.S.C. Sec 1531 ET SEQ);
• Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ);
• National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ);
• Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ);
• Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).
Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
C.17 PRESERVATION OF HISTORICAL/ARCHEOLOGICAL/CULTURAL RESOURCES
A. Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of terrain because of any Federal construction project.
B. The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, cultural, or archeological data the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location.
C. Immediately stop work if paleontological, archaeological, or historical remains (including burials or skeletal material) are encountered, until work is permitted to resume by written order from the CO. the contractor must notify the CO and COR in writing within 24 hours of first discovery. The notification must indicate time of discovery, the nature of the findings and location. The CO and/or COR will notify the Regional Archaeologist, so the provisions of 36 CFR 800.7 (Resources Discovered During Construction) and other relevant laws are followed. Work in other areas may proceed as approved by the CO.
D. Where appropriate by reason of discovery, the CO may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted
12 | 56 in accordance with the applicable clauses in the Contract Clauses Section of this contract which are incorporated by reference at the Task Order Level.
E. The Contractor must insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
C.18 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed.
If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract.
The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize, or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation, or coating. Non-friable asbestos containing materials do not normally release airborne asbestos fiber during routine handling and end-use.
However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
C.19 HAZARDOUS MATERIAL IDENTIFICATION
Submit Safety Data Sheet (SDS)’s as required per 29 CFR 1910.1200 as amended. The contractor must provide one digital copy of each SDS for applicable hazardous chemicals used and/or provided in performance of any work under this contract.
C.20 MATERIAL & EQUIPMENT TRANSPORTATION, HANDLING AND STORAGE
A. Contactor shall have a representative on site to receive material deliveries, and the contractor shall remain responsible for all material deliveries whether their representative is on site at the time of delivery or not.
B. Government-owned equipment is not available for Contractor’s use to accomplish any Work, and Government buildings and other facilities are not available for storage of Contractor’s materials, equipment, and tools.
C. Transport, handle, and store materials and equipment in accordance with the manufacturer’s written instructions, and in a secure manner.
D. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation. Protect liquids from freezing.
E. Promptly remove from the project site any materials or equipment that are damaged or are otherwise unsuitable.
F. Additional Permitting, fees, and coordination may be required working within the limits of Washington, DC.
Additional restrictions may be imposed due to unforeseen events or security threats in Washington, DC.
C.21 CONSTRUCTION QUALITY CONTROL PLAN
A. Designate in writing a single person to oversee and manage on-site quality control activities.
B. The Contractor is responsible for quality control of all project work including any sub-contracted work, and to submit thorough documentation that work fully complies with the construction documents and project permits.
13 | 56
C. Quality control processes include but are not limited to proactively:
1. Ensuring compliance with the construction documents and project permits.
2. Make vertical work plumb and make horizontal work level.
3. Managing specialty subcontractors.
4. Reviewing and processing samples, mock-ups, shop drawings and other construction submittals.
5. Ensuring that the workers have the appropriate expertise and proper equipment to perform the work.
6. Effectively utilizing third-party sampling & testing services (typically for earthwork gradation, compaction, concrete & asphalt testing, welding, pile driving and other specialty inspections).
7. Initialing timely reviews and corrective actions to substrates prior to proceeding with subsequent work.
8. Timely involvement of industry specialists such as manufacturer representatives.
9. Managing system commissioning.
10. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated, and maintain headroom clearance of 96” in occupied spaces and 90” in unoccupied spaces.
11. Training NPS personnel in system operation & maintenance.
12. Timely involvement of local authorities having jurisdiction.
13. Load-Limits: Heavy equipment operated on NPS roads and parking areas shall comply with highway-legal load limits unless explicitly approved otherwise.
D. Field-verify all dimensions and conditions prior to performing the work. Notify the COR of any conflicts.
E. Improvements shall be constructed in accordance with the product manufacturer’s written instructions and standards.
F. Welding shall be performed by licensed welders and in compliance with American Welding Society recommended practices, structurally sound, and shall be neat in appearance.
G. Any work that must be performed by a licensed/certified technician (i.e. Electricians, Plumbers, HVAC
Technicians, etc.) shall be performed by state-licensed/certified technicians. The applicable state-license/certification must be from the State where the work is performed, not exceptions.
H. All, telecommunication (included telephone, data, radio, TV, similar) systems shall be installed and comply with current NPS Policy – if applicable.
C.22 DAMAGES
The Contractor shall assume all risks of injury to persons or property in connection with the performance of work under this contract shall indemnify and save harmless the Government against all claims, causes of action, cost and expense, because of bodily injuries, death, or damages to Property arising from all work activities of the Contractor.
If due to fault, neglect, dishonesty of the contractor, his agency or employees, loss or damage to government property is incurred during the performance of this task order, the contractor shall be responsible for the same.
The government, at its option, in lieu of repayment, may require the contractor to replace at his own expense, all property as directed by the Contracting Officer.
C.23 CONSTRUCTION/PROJECT MANAGER
The contractor shall provide a responsible Construction/Project Manager to represent the contractor in all matters pertaining to work under this contract. The Construction/Project Manager shall have the responsibility of overall supervision, quality control, cost estimating and be responsible for the management of all ongoing work. The Construction/Project Manager must be available in person, by telephone, or radio to respond to any and all problems during normal working hours. The response from the Project Manager must be within 1 hours after receiving the notification and should be in the same means as the request. Written follow up notification (via email is acceptable) must be provided to COR/POC within 24 hours, which confirms response.
14 | 56
The proposed Construction/Project Manager must be included in response to solicitation and must be the Construction/Project Manager responsible for the Contract after award throughout performance. If during the term of this contract, the contractor changes or replaces the Construction/Project Manager, the contractor must notify the COR and CO in writing within 3 business days of the proposed change, or as soon as possible if the departure was unplanned or unexpected.
C.24 SITE SUPERINTENDENT
The Contractor shall provide a responsible site superintendent to represent the contractor in the field in all matters pertaining under this contract including, but not limited to construction, day-to-day coordination of activities, control over employees and subcontractors, and coordination with local Government personnel. The site superintendent may also be designated the Construction/Project Manager.
The site superintendent must be onsite for at least three (3) hours per workday. When they are not on site, they must be available by telephone, radio or other means of communication in order to respond to any and all problems during normal working hours. The response from the Site Superintendent must be within 1 hour after receiving the notification and should be in the same means as the request.
The site superintendent shall be responsible for on-site Quality Control and shall sign all contract submittal transmittal sheets. Site superintendent shall maintain on site a file containing the following project documents when applicable.
� Executed Contract � Contract Drawings � Contract Specifications � Quality Control Plan – (up to date) � As-Built Drawing – (up to date) if required � Modifications
This file shall be maintained and available to the Contracting Officer upon request.
The proposed site superintendent must be included in response to the solicitation and must be the site superintendent responsible for the contract after award throughout performance. If during the term of this contract, the contractor changes or replaces the site superintendent, the contractor must notify the COR and CO in writing within 3 business days of the proposed change, or as soon as possible if the departure was unplanned or unexpected.
C.25 ADDITIONAL REQUIREMENTS FOR CONTRACTOR AND PRODUCT INSTALLATION
The contractor is required to comply with the following:
• Applicable requirements of the following standards and with the most current federal and national codes
(including amendments, changes, and updates), which include but are not limited to:. Where these standards conflict with other specified requirements, the most restrictive requirement shall govern.
o Safety and Health Standard: ANSI/ASSE A10.6 o American National Standards Institute (ANSI)
• ANSI/ASSP A10.6
• ANSI C78.79
• ANSI C80.1
• ANSI C80.6
• ANSI C80.3
• ANSI C81.61
o 2021 National Fire Protection Association (NFPA) Fire Code
• 2022 NFPA 12 – Standard on Carbon Dioxide Extinguishing Systems
15 | 56
• NFPA 70
• NFPA 90A
• NFPA 90B
• NFPA 241
• NFPA 262
o 2021 International Building Code o American Concrete Institute (ACI) standards
• 302 Recommended Practice for Concrete Floor and Slab Construction
• 304 Measuring, Mixing, Transporting, and Placing Concrete.
• 305 Hot Weathering Concrete
• 316 Construction of Concrete Pavements and Concrete Bases.
o American Society for Testing and Materials (ASTM):
• ASTM A36/A36M
• ASTM A123/A123M
• ASTM A240/A240M
• ASTM A392
• ASTM A568/A568M
• ASTM A653/A653M
• ASTM B3
• ASTM B8
• ASTM B117
• ASTM B209
• ASTM B280 - Standard Specification for Seamless Copper Tube for Air Conditioning and
Refrigeration Field Service; 2013
• ASTM B3359
• ASTM C534 - Standard Specification for Preformed Flexible Elastomeric Cellular Thermal
Insulation in Sheet and Tubular Form; 2014
• ASTM C1107/C1107M
• ASTM D2794
• ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;
2015a
• ASTM F567
• ASTM F626
• ASTM F1043
• ASTM F3125/F3125M
o North American Insulation Manufacturers Association (NAIMA)
• NAIMA National Insulation Standards
• NAIMA AH116, "Fibrous Glass Duct Construction Standards" o National Electrical Contractors Association
• NECA 1
• NECA 101
• NECA NEIS 1
• NECA NEIS 130
o National Electrical Manufacturers Association
• NEMA 5-20R
• NEMA 250
• NEMA FB 1
• NEMA FB 2.10
• NEMA FU 1
• NEMA ICS 2
• NEMA ICS 6
• NEMA OS 1
• NEMA OS 2
16 | 56
• NEMA RN 1
• NEMA WD 6
o Refrigerant Piping
• AHRI 710 - Performance Rating of Liquid-Line Driers; 2009
• ASME B16.22 - Wrought Copper and Copper Alloy Solder-Joint Pressure Fittings; 2013
• ASME B31.5 - Refrigeration Piping and Heat Transfer Components; 2013
• AWS A5.8 - Specification for Filler Metals for Brazing and Braze Welding; 2011-AMD 1.
• MSS SP-58 - Pipe Hangers and Supports - Materials, Design, Manufacture, Selection,
• Application, and Installation; 2009 o American Society of Heating, Refrigerating and Air-Conditioning Engineers
• ASHRAE Std 15 - Safety Standard for Refrigeration Systems; 2013
• ASHRAE 15, "Safety Standard for Refrigeration Systems"
• ASHRAE 62.1, Section 4 - "Outdoor Air Quality," Section 5 - "Systems and Equipment," Section
6 - "Procedures," and Section 7 - "Construction and System Start-up."
• ASHRAE/IES 90.1
• ASHRAE 111
o Other
• 40 CFR 264
• AABC's "National Standards for Total System Balance"
• IT industry standard database platforms
• MFMA-4
• MSS SP-58
• MSS SP-69
• NEBB's "Procedural Standards for Testing, Adjusting, and Balancing of Environmental
Systems,"
• SMACNA's "HVAC Duct Construction Standards - Metal and Flexible"
• SMACNA's "HVAC Systems - Testing, Adjusting, and Balancing"
• TIA-568-C Series of standards o MFMA-4 factory-fabricated components for field assembly o Underwriters Laboratories (UL)
• UL "Wire and Cable Marking and Application Guide"
• UL 1
• UL 5
• UL 6
• UL 44
• UL 50
• UL 83
• UL 360
• UL 498
• UL 508
• UL 514 A, B, and C
• UL 651
• UL 723 - Standard for Test for Surface Burning Characteristics of Building Materials; Current
Edition, Including All Revisions
• UL 797
• UL 943
• UL1012
• UL 1242
• UL 1424
• UL 1569
• UL 16ll
• UL 60947-4-1
• UL CCN RTRT
17 | 56
• UL CCN KCXS,
o All local and state requirements, which may include inspections and licensing requirements for specific trades.
o All Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction and applicable State Regulations.
o Specific NPS site/location requirements that are operate under additional guidance and regulations specific to a NPS Location in addition to the Federal Acquisition Regulations and other Federal Regulations. These include but are not limited to:
o Superintendent’s Compendium’s - which supplement Title 36 of the Code of Federal Regulations and other US Code and CFR Titles that apply to areas managed by the National Park Service with park-specific regulations related to park management. Check each Park Service Website and indicated above in Section C.10 to locate Superintendent’s Compendium if not stated.
o Directors Orders - Director's Orders and Related Documents/NPS Office of Policy – which can have an impact on work performed.
• Provide and install equipment, systems, etc. per manufacturer’s installation guidance.
• Trade association standards.
• Recognized testing agency standards.
C.26 SUBMITTALS
A. Definition: Submittals – are documents, samples, and other information that must be delivered to the CO and/or COR on a project before work even starts on a project. The NPS further defines Submittals as:
1. Action Submittals – are those that typical require some kind of action before any can proceed (i.e. Product
Submittals, Safety Plan, Construction Schedules, Differing Site Conditions, etc.
2. Information Submittals - are those that typically require no action to proceed (i.e. Certificate of
Insurance, Performance and Payment Bonds, Informational RFI’s, etc.
B. Submittals may be in the form of digital documentation and/or actual physical samples as indicated.
C. All submittals must be submitted on the NPS - CM-16 form, and the CM-16 form must be filled out correctly with all the blocks completed as appropriate. If submittals are submitted without the CM-16 form, they will be rejected until submitted on correct form. This requirement for a CM-16 also applies if the Contractor provides submittals through ProCore or similar Project Management System, other than email.
D. Salient characteristics of the materials proposed for use shall be clearly identified in the submittal and must match the salient characteristics as stated in Scope of Work, Specifications, Drawings and/or other documentation. The Project Manager must certify that he has reviewed the submittal and has determined that the submittal is in full compliance with the requirements of the Contract. Any illegible, incomplete, or uncertified submittals will be rejected.
E. Submittals shall be approved by the CO and/or COR prior to any work being performed or materials being delivered to the job site. The Contractor shall be responsible for all costs incurred and not subject to Government reimbursement on products/materials that were ordered or for any work that was performed if the submittals were rejected.
F. The Contractor is responsible for timely submission of all submittals, which typically begins with in ten calendar days after award. The Government may not provide for contract period of performance extension requests if they are contractor delays in starting and continuing with the submittal process and it pushes the schedule and/or delivery dates out.
G. Once the submittals have been received, allow no more than 14 calendar days for the Government to review submittals, unless otherwise indicated elsewhere. The submittals may be marked on the CM-16 as “Approved”, “Approved with Notations”, or “Disapproved – Resubmit” for Action Submittals. Informational Submittals will https://npspolicy.nps.gov/DOrders.cfm
18 | 56 be marked on the CM-16 as either “Accept” or “Reject”. A copy of the submittal will be provided through the same medium in which it was received from the CO and/or COR.
H. Contractor must provide correct submittals on their first attempt. If Submittals are marked “Disapproved-
Resubmit” or “Reject” the Contractor has 3 business days to resubmit corrected submittals unless another time frame is agreed to in writing.
1. The Government will then have an additional 14 calendar days to review corrected submittals, each time they require correction and resubmission.
2. Submittals that are marked “Disapproved-Resubmit” or “Reject” more than once shall not be grounds for the contractor to request a contract time extension.
I. If the Contractor repeatedly provides submittals that are either marked “Disapproved-Resubmit” or “Reject” on more than 3 submittals, or repeatedly does not correct or address ALL the noted corrections, errors, etc. on “Disapproved-Resubmit” or “Reject” submittals will result in the contractor being marked with a lower Past Performance Rating in CPARS. The Contractor must ensure that the submittals are correct on the first attempt as best as possible.
J. Review of submittals, and corrections or comments made during the review, does not relieve the Contractor from compliance with the requirements of this Contract.
C.27 BIOBASED AND SUSTAINABLE PRODUCTS
The contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
The following is a list of categories for BioPreferred products that m a y b e required in performance of this construction contract:
• Adhesives and Mastic Removers - 58% Minimum BioBased Content
• Bioremediation Materials - 86% Minimum BioBased Content
• Cleaning Tools - 22% Minimum BioBased Content
• Concrete Curing Agents - 59% Minimum BioBased Content
• Concrete Repair Materials - Concrete Materials – 23% Minimum BioBased Content