Sol_140P3021Q0042_Amd_0001.pdf
PDF 436 KB Posted
- Attached to
- Replace HVAC System at Prince William Forest Park Federal contract opportunity
- Solicitation number
- 140P3021Q0042
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6-_WD_VA20210162_08_06_2021_0002.pdf | ||
| Sol_140P3021Q0042_Amd_0002.pdf | ||
| Attachment_5-_Questions_Answered_140P3021Q0042_0001.pdf | ||
| Attachment_4-_WD_VA20210162_07_23_2021_0001.pdf | ||
| Attachment_2_-_WD_VA20210162_06_18_2021.pdf | ||
| Attachment_3-_Site_Visit_Agenda.pdf | ||
| Sol_140P3021Q0042.pdf | ||
| Attachment_1-__Existing_Conditions_-_Copy.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P3021Q0042 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PCR
Washington DC 20242-0001 1100 Ohio Drive SW Contracting Anne Acquisition Management Division NPS, NCR - Regional Contracting
31822607/27/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/07/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 1 of solicitation 140P3021Q0042 changes the following:
A) Updated Wage Determination VA20210162 07/23/2021 has been incorporated as Attachment 4.
B) A Questions Answered document has been incorporated as Attachment 5.
C) The quote response due date remains UNCHANGED.
D) Completion and submission of FAR Provision 52.204-26 has been removed from Section L.1
(Required Submissions) of the solicitation.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Brian McCabe
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P3021Q0042/0001
No other changes to solicitation 140P3021Q0042 occur at this time.
Legacy Doc #: NPS
Period of Performance: 09/01/2021 to 03/04/2022
All INVOICES SHALL BE SUBMITTED VIA THE INVOICE
PROCESSING PLATFORM AT WWW.IPP.GOV. ALL INVOICES
SHALL BE SUBMITTED TO AND APPROVED BY THE COR
BEFORE SUBMISSION TO IPP.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P3021Q0042
PAGE OF
3 | 44
AUTHORIZED FOR LOCAL REPRODUCTION
PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Mini Split Ductless Air Conditioning Heat Pump Replacement of Existing HVAC in Curatorial Building
Prince William Forest Park 18100 Park Headquarters RD
Triangle, VA 22172
Item No. Description UM Total 001 Mobilization LS 002 Provide and Install 3 6,000 BTU Wall Mounted Air Handlers LS
003 Removal and Disposal of Existing Equipment (Duct work, HVAC Sysytems and Other Equipment) LS
004 Provide and Install 1 estimated 24,000 BTU 3 Zone Ductless Condensor LS
005 Provide and Install 3 Condensate Pumps LS 006 Provide and Install 2 Standalone Humidifiers LS 007 Provide Sysytem Startup Instructions LS 008 Repair, Patch and Paint Holes LS 009 Recover and Dispose of Recovered Refrigerant LS 010 Miscelanious Materials LS
Grand Total
LS = Lump Sum, EA = Each
FAR 36.204 Disclosure of the magnitude of construction projects
The Government’s estimate is: Between $25,000 and $100,000
140P3021Q0042
4 | 44
SECTION C – DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
Section C
Prince William Forest Park 18100 Park Headquarters Road
Triangle, Virginia 22172
Replace Existing HVAC in Curatorial Building Statement of Work
PMIS# 318226
C.0 NATIONAL PARK SERVICE
The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.
The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include: Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.
C.1 BACKGROUND
Prince William Forest Park (PRWI) is an oasis located in Northern Virginia a short distance from Washington, DC. In 1936, Chopawamsic Recreation Area opened its gates to house children's 'relief' camps during the Great Depression and was later renamed Prince William Forest Park in 1948. PRWI is filled with fragrant woods and trickling streams, and welcomes of campers, hikers, bikers and nature lovers of all ages. PRWI is filled with hiking trails, bicycle-accessible roads, campgrounds and over 100 cabins.
C.2 PURPOSE
Prince William Forest Park is soliciting quotes to install a Mini Split Ductless Air Conditioning Heat Pump system and two standalone humidifiers, one humidifier in the rear archive room and one humidifier in the large main room of the curatorial building. The new system must be capable of consistently and efficiently maintaining a year-round indoor temperature range of 50-70 degrees Fahrenheit and a year-round indoor Humidity range of 45-55%. The contractor shall provide all labor, supervision, materials, tools, supplies, transportation, and equipment necessary to execute installation of this system.
140P3021Q0042
5 | 44
Existing condition – The Prince William Forest Park Curatorial building is approximately 600SF. Additionally, it is a metal building with three rooms and a single restroom. The large room measures approximately 21’x11’, the back room measures approximately 21’x7’6”, the side room is approximately 12’x8’. The restroom measures approximately 6’6”x 7’6”. The current HVAC in the building consists of two separate systems. System one is a Carrier model 50JS-018---301—package unit, all the components are on the outside of the structure, only the ductwork enters the building. System one, the carrier unit, serves the large room, the side room, and the restroom. System two is an Above Air Technologies vertical floor mounted air handler model VCE-036 with an outdoor air-cooled condenser model XP1-036. System two only services the back room of the building.
C.3 TASKS
C.3.1 HVAC Replacement The contractor shall:
1. Attend Pre-con
2. Submit Required Submittals
3. Install barriers, caution tape and signage to keep visitors and park personnel out of the work area.
4. Recover refrigerant and properly dispose of per EPA regulations.
5. Remove and dispose of all existing HVAC equipment, all waste shall be moved from park property.
6. Remove and dispose of all existing duct work and associated components.
7. Provide and install 1 (new) estimated 24,000 BTU 3 Zone ductless Condenser with base pan heater, (Mitsubishi or approved equivalent) on pad with code required snow legs. Utilize the carrier duct work penetration for new line sets and wiring.
8. Provide and install new high voltage disconnect and whip to new condenser.
9. Provide and install 3 New estimated 6,000 BTU Wall Mounted Mini-split Air Handlers (Mitsubishi or approved equivalent). One wall mounted air handler in each of the rooms, large room, archive room and side room.
10. Provide and install three condensate pumps, one for each air handler, capable of safety interlock with controls.
Location TBD on site.
11. Provide and install two standalone humidifiers one for the back room and one for the front large room, humidifiers must be able to maintain a constant humidity range of 45-55%. One in archive room and one in the large room, Exact location TBD on site.
12. Provide system startup and instructions
13. Repair, patch and paint any holes in building exterior or interior left over from the previous HVAC systems components.
C.4 ADDITIONAL REQUIREMENTS
Contractor shall be responsible for obtaining all required permits (if applicable) and scheduling all applicable inspections. All inspections must be signed off and completed prior to receipt of final payment. All applicable submittals required, which may include warranty, production information, operation and maintenance documentation, etc. must be provided to Contracting Officer Representative (COR)/Point-of-Contact (POC) and CO prior to submission of final invoice. Invoice will be rejected until all required documentation is submitted.
Please refer to Section C.5 for required submittals.
The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction and applicable State Regulations.
140P3021Q0042
6 | 44
All trash and debris removal must be in accordance with local, state and federal regulations.
All materials and equipment are to be installed per manufacturer’s installation guidance.
Contractor must have adequate liability insurance and proper license or training / expertise to perform all work stated herein.
Contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the work in its entirety.
Contractor shall provide, erect and maintain barricades and warning signs. The contractor shall take all necessary precautions to ensure the safety of the public and ensure protection of the cultural landscape. All signs and barricades, including their locations must be approved in advance by the COR/POC.
C.5 SUBMITTALS
1. A complete list of materials proposed to complete the work must be provided for approval.
2. Project Superintendent Designation Letter
3. SF1413’s for each subcontractor
4. Quality Control Plan
5. Accident Prevention Plan
6. Safety Plan (with COVID-19 mitigation practices)
7. Project Schedule
8. Certificate of Insurance (COI) in accordance with FAR 28.307-2
9. Key Personnel Certifications
10. Schedule of Values
C.6 ON SITE SUPERVISOR
1. At a minimum, the Contractor must provide one on-site supervisor to direct all contract personnel and maintenance operations. This must be ensured any time work is being performed on the site.
2. The on-site supervisor shall be fluent in the English language to effectively communicate with the Contractor’s employees and/or Subcontractors as well as the COR/POC and other National Park Service personnel.
3. If the on-site supervisor is not on site or absent due to illness or other reasons, the Contractor shall provide an alternate supervisor to be on site managing and directing all contract personnel and maintenance operations. The alternate supervisor shall have similar job qualifications to those required for the designated on-site supervisor.
4. The onsite Supervisor shall be available for phone calls during all working hours.
C.7 CONDUCT
140P3021Q0042
7 | 44
The Contractor’s employees shall, at all times, while on the job site, whether on or off duty, conduct themselves in a professional, orderly and safe manner. Rudeness, fighting, being under the influence of alcohol and/or drugs or bringing and/or consuming alcohol and/or drugs, gambling, soliciting, stealing, and any immoral or otherwise undesirable conduct shall not be permitted on the job site and shall result in immediate and permanent removal from the job site of any employee engaging in such conduct from work.
C.8 SITE MANAGEMENT
Maintain walkways, driveways, roads, parking, and project site to be free of all construction debris, equipment and materials on a daily basis. Maintain site free of hazards at all times. Occupancy access shall be negotiated on a project specific basis. Maintain the level of access provided to the facility through the project duration if tenant occupancy is retained. Safety equipment, fencing and barriers shall be installed per safety plan. Erosion control and sedimentation structures shall be constructed in according with EPA standards as needed. All historical and/or archeological issues shall be addressed as needed.
C. 9 PROJECT INITIATING MEETING
1. A pre-construction meeting will be held, and the park will provide a full tour and maps of the work areas.
Establishment of reporting procedures, program updates, and budget reviews will be discussed and determined.
Phone numbers, including emergency contact numbers, will be exchanged. Safety procedures to be followed will be reviewed and training level of staff will be determined.
2. Park staff will provide information on any natural or cultural resource issues in work areas during the pre-construction meeting
C.10 GENERAL PLACE OF PERFORMANCE AND HOURS OF OPERATION
National Capital Area (NCA) Prince William Forest Park Curatorial / Collections Building 5480 Turkey Run Road Triangle, VA 22172
All work will be performed Monday through Friday, between 7:00 am and 3:00 pm. No work shall be performed on any weekend or Federal holiday unless pre-approved 24 hours in advance by the COR. Daily work priorities can be altered by the park Project Manager or the Assistant Project Manager during special events or times of expected high visitor use.
There may be times when the Park will have closures and the contractor may be asked to leave a work area. As much notice as possible will be given to the contactor prior to these closures.
No work shall occur on the following Federal Holidays:
New Year’s Day – January 1st
Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Independence Day – July 4th
Labor Day – First Monday in September
140P3021Q0042
8 | 44
Columbus Day – Second Monday in October Veteran’s Day – November 11th
Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th
The Period of Performance is 60 days after the issuance of the Notice to Proceed.
C.11 PRE-WORK INSPECTION
Thoroughly examine work site and report in writing to the CO any condition that may adversely affect construction or appearance prior to starting work.
C.12 LANDSCAPE PRESERVATION
1. The contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits.
Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
2. Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
3. Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
C.13 HISTORICAL AND CULTURAL SITE PROTECTION
Every effort will be made by park staff to identify and list any known or suspected archeological, cultural, or historically significant area prior to work activity. A brief orientation will be held prior to the start of work in areas where historical or cultural sites may be a concern. If an archaeological find is discovered upon construction, work must stop, and the COR/POC must be notified immediately.
C.14 PREPARATION
The contractor shall correct all defects and deficiencies in surfaces, which may adversely affect proper application, adhesion, or appearance, in accordance with manufacturer’s instructions and as specified hereafter.
C.15 CONSTRUCTION SITE MAINTENANCE
1. The Contractor shall maintain the work site in a safe, neat, and orderly manner. All supplies and equipment on the project site shall be stored to avoid any damage.
2. Limited space will be made for the storage of materials, which shall be stored in a clean and neat condition as approved by the COR.
3. All debris, foreign objects or spills of any kind from the contractor’s operations shall be cleaned up daily or
140P3021Q0042
9 | 44 as requested by the COR.
4. All Contractor generated refuse and waste shall be hauled from the work site daily. This refuse and waste material shall be hauled in trucks with tight fitting covers to prevent spillage on roadways.
5. It shall be the Contractor’s responsibility to take whatever measures are necessary to assure the protection of Prince William Forest Park assets and to perform the work to cause minimal disruption of ongoing activities near occupied areas.
6. The Contractor assumes the risk and responsibility for the loss or damage to National Park Service furnished property.
7. Upon Completion of work, remove equipment, temporary barriers and all debris and rubbish. Legally dispose of all trash, debris, and rubbish off National Park Service property.
C.16 ENVIRONMENTAL CONCERNS AND SAFETY STANDARDS:
1. The Contractor and each of (their) employees must work in compliance with all applicable OSHA, Federal, state, and local safety laws and regulations.
2. Safety and traffic control devices such as signs, cones, certified flaggers, or other traffic warning devices must be in place before starting any work along paved roadways. All regulations related to OSHA and required postings will be the responsibility of the contractor to perform. The work site must always be taped or barricaded off during construction to ensure public safety. Contractor must arrange with COR for approval that the site is sufficiently barricaded off at commencement of work.
3. The contractor shall provide and ensure that all personnel at the work site use the proper Personal Protective Equipment (PPE) required by OSHA.
4. The contractor shall take all necessary precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to employees, visitors, properties, equipment, and vehicles.
5. Damage caused by the contractor to any properties shall be repaired or replaced to the satisfaction of Prince William Forest Park at the expense of the Contractor, Prince William Forest Park at its sole discretion, may elect to repair or replace the damaged property, and deduct such costs from monies due the Contractor.
6. Prior to use of any products or materials, the Contractor shall provide for review and approval by the
COR/POC:
i. Manufacturer’s product data and literature.
ii. Manufacturer’s installation recommendations.
iii. Samples, if required by the COR of Material Safety Data Sheets (MSDS)
7. The contractor shall not leave any tools, parts and/or supplies unattended in the public area at any time while performing work at Prince William Forest Park.
8. If work is shut down or postponed due to significant weather events, for example in event of high winds, heavy rains, snow, flooding, or forest fire, work will resume at the earliest possible time in concurrence with the
COR/POC.
C.17 REPORTING
140P3021Q0042
10 | 44
The contractor is responsible for immediately reporting to the PRWI Duty Officer (LEO) and the COR/POC:
1. All accidents, incidents, and injuries.
2. Any spills of petroleum products or hazardous materials.
3. Any damage to Park property.
4. The Communications Center will dispatch the appropriate staff and/or resources to address the incident.
5. Any damages relating to historic structures or potential archeological findings.
Travel will be on existing paved and unpaved roads only and no motorized vehicle will be permitted to leave the established road network unless otherwise authorized by the CO or COR.
C.18 QUALITY ASSURANCE:
1. When the contractor considers that work is complete and acceptable at Prince William Forest Park, the contractor shall inform the COR/POC that the work is complete and ready for inspection. The COR will inspect the work on site. If the work is not acceptable, the Contractor shall record a list of items noted by Prince William Forest Park to be corrected. A subsequent inspection may take place to review the corrected items.
2. Contractor shall provide a warranty equal to the warranty provided by the manufacturer for all materials used. A One-Year Workmanship Warranty will also be required upon completion of the project.
C.19 PAYMENT
Payment for all labor and materials will be made at the contract lump-sum price. All invoices shall be accompanied by the corresponding certified payrolls and submitted to the COR for approval before submission to IPP.
C.20 TEMPORARY FACILITIES
1. STAGING AREA: The contractor shall arrange the location for exterior stockpiling of materials (i.e. storage) with COR/POC, and contractor must be present when any materials are delivered to ensure proper placement in directed location. The Government will provide adequate staging area as close to the construction site as practicable.
2. The Government will NOT provide any secured storage/staging areas for the contractor. The contractor shall be responsible for protecting materials stockpiled against adverse weather, damage, theft, and other risks of loss. The Government assumes no responsibility for material or equipment left in the storage area.
3. SANITARY FACILITIES: Toilet facilities will not be provided by the Government.
4. WATER, AND ELECTRICITY: Water and 120V electricity may be available at no cost to the Contractor, depending on the location. Should water and electricity not be readily available, the contractor shall provide these services as needed to perform the required work.
5. TELEPHONE: The Contractor may elect to hook-up commercial phone services using the local telephone service provider, at no cost to the Government. Cell phone or wireless access may or may not be available at the construction site.
C.21 CONSTRUCTION SCHEDULE/VALUES
Within one (1) week after approval or award of contract and/or other time as agreed to, the contractor shall prepare a construction schedule of activities indicating labor, materials and activity proposed for each day. A schedule of values
140P3021Q0042
11 | 44 linking the payment items to the Construction Schedule shall be prepared for each task. This spreadsheet shall describe multiple activities being proposed from start to finish of the project and show construction work completion in %.
The construction schedule shall define the overall time required to perform the identified work. This time schedule shall determine the overall level of effort by discipline for the task. Each major task, including beginning time and ending time, shall be identified within the schedule. Notify the Contracting Officer whenever there are significant departures from the approved Construction Schedule. Submit any requests to modify the Construction Schedule, in writing to the Contracting Officer with an explanation for the deviation.
C.22 BIOBASED AND SUSTAINABLE PRODUCTS
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
The following is a list of categories for biopreferred products that m a y b e required in performance of this construction contract:
2-Cycle Engine Oils – 34% Minimum BioBased Content Concrete and Asphalt Cleaners – 70% Minimum BioBased Content Concrete and Asphalt Release Fluids – 87% Minimum BioBased Content Corrosion Preventatives – 53% Minimum BioBased Content Diesel Fuel Additives – 90% Minimum BioBased Content Dust Suppressants – 85% Minimum BioBased Content Fuel Conditioners – 64% Minimum BioBased Content Gasoline Fuel Additives – 92% Minimum BioBased Content Graffiti and Grease Removers – 34% Minimum BioBased Content Greases – Truck – 71% Minimum BioBased Content Inks – Sheetfed (Black) – 49% Minimum BioBased Content Inks – Sheetfed (Color) – 67% Minimum BioBased Content Intermediates – Binders – 47% Minimum BioBased Content Intermediates – Chemicals – 22% Minimum BioBased Content Intermediates – Paint and Coating Components – 22% Minimum BioBased Content Metalworking Fluids – General Purpose Soluble, Semi-Synthetic, and Synthetic Oils – 57% Minimum
BioBased Content Mobile Equipment Hydraulic Fluids – 44% Minimum BioBased Content Multipurpose Lubricants – 88% Minimum BioBased Content Pneumatic Equipment Lubricants – 67% Minimum Biobased Content
For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.
C.23 DEFINITIONS (Not included in Federal Acquisition Regulations) http://www.biopreferred.gov./
140P3021Q0042
12 | 44
Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
2-Cycle Engine Oils - Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear.
Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.
Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.
Clearing Limits - The limits of clearing as designated on the ground, shown on the drawing or designated in the Special Project Specifications.
Contract Pay Item - A pay item designated on the bid schedule and described by a specification.
Concrete and Asphalt Cleaners - Chemicals used in concrete etching as well as to remove petroleum-based soils, lubricants, paints, mastics, organic soils, rust, and dirt from concrete, asphalt, stone and other hard porous surfaces. Products within this item include only those marketed for use in commercial or residential construction or industrial applications
Concrete and Asphalt Release Fluids - Products that are designed to provide a lubricating barrier between the composite surface materials (e.g., concrete or asphalt) and the container (e.g., wood or metal forms, truck beds, roller surfaces).
Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.
Contracting Officer's Representative (COR) - The on-site contract administrator for the Contracting Officer. The duties and responsibilities of the Contracting Officer’s Representatives are defined below in this Section or in a letter of designation issued by the Contracting Officer.
Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Corrosion Preventatives – Products designed to prevent the deterioration (corrosion) of metals.
Diesel Fuel Additives - (1) Any substance, other than one composed solely of carbon and/or hydrogen, that is intentionally added to diesel fuel (including any added to a motor vehicle's fuel system) and that is not intentionally removed prior to sale or use. (2) Neat biodiesel, also referred to as B100, when used as an additive. Diesel fuel additive does not mean neat biodiesel when used as a fuel or blended biodiesel fuel (e.g., B20).
Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plants, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of a facility.
Dust Suppressants - Products formulated to reduce or eliminate the spread of dust associated with gravel roads, dirt parking lots, or similar sources of dust, including products used in equivalent indoor applications.
Erosion Control Materials - Woven or non-woven fiber materials manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose earth surfaces, which may be combined with seed and/or fertilizer to promote growth.
140P3021Q0042
13 | 44
Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.
Fuel Conditioners - Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system.
Gasoline Fuel Additives - Chemical agents added to gasoline to increase octane levels, improve lubricity, and provide engine cleaning properties to gasoline-fired engines.
Graffiti and Grease Removers - Industrial solvent products formulated to remove automotive, industrial, or kitchen soils and oils, including grease, paint, and other coatings, from hard surfaces.
Greases – Truck - Lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners. Lubricants that are designed for use on the fifth wheel of tractor trailer trucks onto which the semi-trailer rests and pivots.
Inks – Sheetfed (Black) - Inks are liquid or powdered materials that are available in several colors and that are used to create the visual image on a substrate when writing, printing, and copying. Black inks used on coated and uncoated paper, paperboard, some plastic, and foil to print in black on annual reports, brochures, labels, and similar materials.
Inks – Sheetfed (Color) - Inks are liquid or powdered materials that are available in several colors and that are used to create the visual image on a substrate when writing, printing, and copying. Pigmented inks (other than black inks) used on coated and uncoated paper, paperboard, some plastic, and foil to print in color on annual reports, brochures, labels, and similar materials.
Intermediates – Binders - Materials used to provide cohesiveness throughout an entire finished product. Binders are generally polymers or polymer precursors (such as epoxies) and include the polymeric materials used to formulate coatings, adhesives, sealants, and elastomers. The product category does not include adhesives and glues that are finished products used to attach the surfaces of two or more distinct and separate components to one another.
Intermediates – Chemicals - Ingredients used as reactants for organic synthesis reactions rather than for their functional properties in a chemical mixture; those used as building block chemicals and secondary chemicals such as glycerol, succinic acid, propanediol, and monomers such as lactic acid and propylene; those used for specific functional properties during manufacturing of other products such as pH regulators, flocculants, precipitants, neutralizing agents, emulsifiers, viscosity reducers, rheology modifiers, adhesion agents, detergents, wetting agents, foaming agents, or dispersants; those that are added to end-use products for their specific functional properties including polyols, polymers, and solvents for thinning and drying applications but excluding solvents used for cleaning; and those used for dyes, pigments, and scents including flavorings for non-food products such as lip balm.
Intermediates – Paint and Coating Components - Ingredients used to formulate finished waterborne or solvent borne paint and coating products. Examples of Intermediates – Paint and Coating Components include binders, pigments, thickeners, curing agents, modifiers, humectants, open time additives, alkyd latex resins, polymers, polyols, reactive oligomers, or reactive diluents.
Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor’s employees and employment practices.
Materials - Any substances for use in the construction of the project and its appurtenances.
140P3021Q0042
14 | 44
Metalworking Fluids – General Purpose Soluble, Semi-Synthetic, and Synthetic Oils - Fluids that are designed to provide cooling, lubrication, corrosion prevention, and reduced wear on the contact parts of machinery used for metalworking operations such as cutting, drilling, grinding, machining, and tapping. Metalworking fluids formulated for use in a re-circulating fluid system to provide cooling, lubrication, and corrosion prevention when applied to metal feedstock during normal grinding and machining operations.
Mobile Equipment Hydraulic Fluids - Hydraulic fluids formulated for general use in nonstationary equipment, such as tractors, end loaders, or backhoes.
Multipurpose Lubricants - Products designed to provide lubrication under a variety of conditions and in a variety of industrial settings to prevent friction or rust. Greases, which are lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners, are not included in this item. In addition, task-specific lubricants, such as chain and cable lubricants and gear lubricants, are not included in this item.
Notice of Noncompliance - A written notice from the Contracting Officer’s representative or inspector which documents, for the Contractor’s attention, specific performance deficiencies.
Pneumatic Equipment Lubricants – Lubricants designed specifically for pneumatic equipment, including air compressors, vacuum pumps, in-line lubricators, rock drills, jackhammers, etc.
Right of Way - A general term denoting land, property, or interest therein acquired for or devoted to a road or a construction site.
Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.
Special Project Specifications - Specifications which detail the conditions and requirements peculiar to the individual project, including but not limited to CSI format specifications and additions and revisions to Standard Specifications.
Specifications - A general term applied to all written directions and requirements pertaining to performance of work.
Standard Specifications - Specifications established for Region wide use for construction of facilities which cover most items of work likely to be performed; such as Earthwork, Base Courses, Pavement, Concrete, etc.
Utility Services - Are services such as electricity, gas, steam, water and sewage.
Work Order - An order written by the Contracting Officer or Contracting Officer’s Representative, which directs the Contractor to correct deficient performance. It may also be used to document acceptable completion of units and to approve starting on additional work units.
C.24 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT
ADMINISTRATION
1. Contracting Officer: The Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives.
2. Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR
140P3021Q0042
15 | 44 include, but are not limited to;
a. Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;
b. Requesting removal of unsuitable contractor employees;
c. Ensuring adequacy of schedule and Quality Control Plan, including changes;
d. Ordering re-performance of unacceptable work or performance by other mean, etc.
C. Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award.
The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.
C.25 NPS CONTACTS (with contact info. COR, CO, CS)
COR- Doug Davidson 571-299-9996 Douglas_Davidson@nps.gov
Contract Specialist- Andrew Griffith 202-280-9486 Andrew_griffith@nps.gov
Contracting Officer- Brian McCabe 202-339-7772 Brian_mccabe@nps.gov
C.26 PART 5 ATTACHMENTS:
Attachment 1- Existing Conditions Photos Attachment 2- Wage Determination VA20210162 06/18/2021 Attachment 3- Site Visit Agenda Attachment 4- Wage Determination VA20210162 07/23/2021 Attachment 5- Questions Answered Document mailto:Douglas_Davidson@nps.gov mailto:Andrew_griffith@nps.gov
140P3021Q0042
16 | 44
SECTION D--PACKAGING AND MARKING
{Not Applicable}
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at:
Acquisition.GOV | www.acquisition.gov
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
CLAUSES INCORPORATED BY REFERENCE: SEE CLAUSE 52.252-2 FOR MORE INFORMATION
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
FULL-TEXT CLAUSES
https://www.acquisition.gov/
140P3021Q0042
17 | 44
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Acquisition.GOV | www.acquisition.gov
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to:
(a) Commence work under this contract within fifteen (15) days after the date the Contractor receives the Notice to Proceed,
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than thirty (30) days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
The completion date may be extended by the number of calendar days after the date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
(End of clause)
140P3021Q0042
18 | 44
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 POST AWARD CONFERENCE
Prior to commencement of work, the CS, CO, COR, and/or POC will arrange a meeting with the contractor to discuss the contract terms and work performance requirements.
It will be scheduled as soon as possible after the date of contract award. All dates and locations of the conference will be mutually agreed upon, and may be held via teleconference or onsite.
G.2 DESIGNATION OF CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR POINT-OF-
CONTACT (POC)
A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award of the contract in accordance with DIAR 1452.201-70 Authorities and Delegations (SEP 2011). The name will be designated on a letter or form.
B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.
C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the Contracting Officer’s Representative provided they do not affect the delivery schedule or performance period stated in the contract.)
D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.
Whenever, in the opinion of the Contractor, the COR’s requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the COR persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
E. The COR's major duties and responsibilities are contained in the Forest Service Handbook of Contract Administration. The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:
1. Approve Change Orders and Modifications
2. Take action to terminate the contract for default or Government convenience.
3. Make contract adjustments under the Differing Site Conditions clause.
4. Grant extensions of contract time.
5. Approve assignment of claims.
6. Make final decisions under the Disputes clause.
7. Make final acceptance under the contract.
8. Make final decisions under the Suspension of Work clause.
9. Make equitable adjustments.
10. Authorize change in amount of Payment Retention.
11. Approve subcontractors.
140P3021Q0042
19 | 44
12. Approve payments with deductions or final payment.
13. Approve use and possession prior to completion.
14. Enforce the warranty provisions.
15. Issue any direction that would result in a possible change to contract requirements.
F. The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements and/or performance.
The POC is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the CO prior to completion of the contract.
The CO should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the OCO provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms the Contractor must communicate with the CO.
Whenever, in the opinion of the Contractor, the POC requests effort outside the scope of the contract, the Contractor should so advise the CO. If the POC persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits.
Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
The POC has limited authority under this contract and responsibilities may include, but are not limited to:
1. Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;
2. Requesting removal of unsuitable contractor employees;
3. Ensuring adequacy of schedule and Quality Control Plan, including changes;
4. Ordering re-performance of unacceptable work or performance by other means, etc.
5. Approval or invoices and submitted reports
6. Requesting any the work contained within specific Task Order’s
G.3 ADMINISTRATIVE CONTRACTING OFFICE
United States Department of the Interior National Park Service Region 1 – National Capital Area MABO West 1100 Ohio Drive S.W.
Washington, DC 20242
140P3021Q0042
20 | 44
G.4 SYSTEM FOR AWARD MANAGEMENT (SAM)
The General Service Administration (GSA) Office of Governmentwide Policy is consolidating the governmentwide acquisition and award support systems into one new system – the System for Award Management (SAM). SAM is streamlining processes, eliminating the need to enter the same data multiple times, and consolidating hosting to make the process of doing business with the government more efficient.
The Entity Management functional area of SAM, formerly Central Contractor Registration (CCR), Online Representations and Certifications (ORCA), and Federal Agency Registration (FedReg), is the primary database for the U.S. Federal Government to manage information on potential government business partners or federal financial assistance recipients.
If you have previously registered your entity in CCR, ORCA, or FedReg all of your entity’s information has been brought into SAM. You just need to set up a SAM account, migrate your roles and update/renew your entity record in SAM as needed. See the following website https://www.sam.gov/portal/public/SAM/ for more information and assistance on registering your entity in SAM. In order to be eligible for an award, potential contractors must comply with all requirements of FAR Clause 52.204-7, System for Award Management.
G.5 BIOBASED REPORTING REQUIREMENTS
Pursuant to a legislative mandate in the 2008 Farm Bill, prime contractors are required to report the category of product, type of product, and dollar value of all USDA…