SUITE 4340-REVISION 07.17.20_0003.pdf
PDF 501 KB Posted
- Attached to
- HROC AVAYA VOIP TELECOM SYSTEM Federal contract opportunity
- Solicitation number
- 140P2120R0031
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 4 Final_0004.docx | DOCX document | |
| Sol_140P2120R0031_Amd_0004.pdf | ||
| NPS WORKSTATIONS-04.23.20_0003.pdf | ||
| Sol_140P2120R0031_Amd_0002.pdf | ||
| Questions and Answers 140P2120R0031_0002.docx | DOCX document | |
| Sol_140P2120R0031_Amd_0001.pdf | ||
| Sol_140P2120R0031.pdf | ||
| VOIP-GPAT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1385 S. Colorado Blvd., Penthouse Denver, Colorado 80222
(O) 303.778.0608
(F) 303.778.0609
(W) www.maharch.com
DO NOT SCALE THE DRAWINGS,
Request verification of dimensions from the Architect as required.
The General Contractor shall check and verify all levels, datums and dimensions and shall report any and all errors and omissions to the Architect immediately.
This drawing is to be read in conjunction with structural,mechanical, electrical and/or any other consultants drawings that may be applicable.
This drawing is the exclusive property of the Architect and must not be reproduced without his written permission.
Notes
MAH
Architectural Group
Stamp
Issues:
Scale
Date Drawn
Drawn By
Description
Sheet Number
05/19/2020
NKB
APRIL 21, 2020
L A
K E
W O
O D
, C O
W J
E F
F E
R S
O N
A V E
NEW WALL, CEILING & POWER
PLANS
A1-4
A C
A D
E M
Y C
E N
T E
R N
A T
IO
N
A L P
A R
K S
E R
V
IC
E
S U
IT
E
PERMIT/BID SET: 04.21.20
REVISION 04.24.20
BLDG DEPT RESP 1 05.19.20
06.25.20REVISION
07.17.20REVISION
KEYED NOTES
NEW WALL TO BE CENTERED ON EXISTING WINDOW
MULLION. PROVIDE BREAK METAL AT BACK SIDE OF
WALL ADJACENT TO WINDOW MULLION. BREAK METAL TO
MATCH EXISTING WINDOW FRAME FINISH.
PROVIDE NEW OPERABLE PARTITION WALL: KWIK-WALL
2000 SERIES OR EQUAL.
PROVIDE NEW 4'-0" X 8'-0" X 3/4" THICK PLYWOOD
EQUIPMENT BOARD. PAINT TO MATCH ADJACENT
FINISHES. ALL POWER IS TO BE MOUNTED FLUSH TO THE
FACE OF THE PLYWOOD.
EXTEND EXISTING WALL UP TO DECK.4
PROVIDE JUNCTION BOX AT CEILING FOR TENANT
PROVIDED, SURFACE MOUNTED PROJECTOR. ROUTE
DATA TO AV ROOM. COORDINATE LOCATION W/ TENANT.
PROVIDE POWER FOR TENANT PROVIDED, WALL
MOUNTED MOTORIZED PROJECTOR SCREEN. ROUTE
DATA TO AV ROOM. COORDINATE LOCATION W/ TENANT.
PROVIDE NEW JUNCTION BOX AND CONDUIT AT DOOR TO
ACCOMMODATE TENANT PROVIDED CARD READER.
COORDINATE WITH TENANT'S VENDOR.
PROVIDE NEW 12" DEEP SHELVING.8
D03
D02
D01
A2-4
A2-4
A2-4
A2-4
11'-7" 4'-10" 15'-1" 6'-5"
12"
TRAINING ROOM
STORAGE
AV
ALIGN
EO0
3 8
BUILDING FIRE ZONE:
FULLY SPRINKLERED
OCCUPANCY:
GROUP A-3 (ASSEMBLY)
GROUP S-1 (STORAGE)
BUILDING CODE:
CODE INFORMATION
BUILDING ADDRESS:
ACADEMY CENTER
7175 W JEFFERSON AVE
LAKEWOOD, CO 80235
TENANT:
NATIONAL PARK SERVICE
4TH FLOOR
SUITE 4340
PROJECT TYPE:
TENANT LAYOUT AND FINISH
REARRANGEMENTS TO EXISTING
BUILDING SPACE
BUILDING TYPE:
TYPE III-A
4 STORIES
TWO EXITS REQUIRED
TWO EXITS PROVIDED
97 X 0.2 = 19.4"=32" REQUIRED EGRESS WIDTH
108" EGRESS WIDTH PROVIDED
OCCUPANTS:
ASSEMBLY: 1,440 S.F./15 = 96 OCCUPANTS
STORAGE: 199 S.F. /200 = 1 OCCUPANT
TOTAL: 1,639 S.F. 97 OCCUPANTS
• 2015 International Building Code
• 2015 International Residential Code
• 2015 Existing Building Code
• 2015 International Plumbing Code
• 2015 International Mechanical Code
• 2015 International Fuel Gas Code
• 2015 International Energy Conservation Code
• 2015 International Fire Code
• 2017 National Electrical Code
DRAWING INDEX
PARTIAL 4TH FLOOR MECHANICAL PLANS
MECHANICAL GENERAL INFORMATION
NEW WALL, CEILING AND POWER PLANS
PARTIAL 4TH FLOOR LIGHTING AND ELECTRICAL
PLAN
ELECTRICAL GENERAL INFORMATION
A1-4
M0-1
M1-0
E0-1
E1-0
FINISH PLAN AND ARCHITECTURAL DETAILSA2-4
ARCHITECTURAL SPECIFICATIONSA3-4
GENERAL NOTES, SPECIFICATIONS, AND DRAWINGSS100
SPECIAL INSPECTIONSS110
WALL LEGEND
NEW BUILDING STANDARD INTERIOR
PARTITION-METAL STUDS AT 16" O.C. W/
5/8" TYPE 'X' GYP. BD. EACH SIDE.
EXISTING WALL TO REMAIN WITH NO
CHANGES UNLESS OTHERWISE NOTED.
PATCH AND REPAIR DEMOLITION SCARS
AS REQUIRED.
EXISTING WALL OR A PORTION OF EXISTING
WALL TO BE REMOVED.
NEW BUILDING STANDARD DEMISING
PARTITION-METAL STUDS @ 16" O.C. TO
EXTEND TO THE PERMANENT DECK ABOVE
W/ 5/8" TYPE 'X' GYP. BD. EACH SIDE.
TENANT:
PROJECT CONTACTS
ARCHITECT:
MAH ARCHITECTURAL GROUP
NICK BREWKA
1385 S COLORADO BLVD
DENVER, CO 80222
PHONE: 303.778.0608
EMAIL: nick@maharch.com
GENERAL CONTRACTOR
NATIONAL PARK SERVICE
RICHARD "RIC" FREEMAN
12795 W. ALAMEDA PARKWAY
LAKEWOOD, CO 80238
PHONE: 303.969.2466
EMAIL: richard_freeman@nps.gov
HOMELAND
MIKE SWISHER
2200 S. VALENTIA STREET
DENVER, CO 80231
PHONE: 303.883.2054
EMAIL: mike@homeland.com
MECHANICAL/PLUMBING ENGINEER
COLUMBINE ENGINEERING
KATHY GISH
7175 W JEFFERSON AVENUE, SUITE 1000
LAKEWOOD, CO 80235
PHONE: 720.389.6546
EMAIL: kgish@columbineeng.com
ELECTRICAL ENGINEER
COLUMBINE ENGINEERING
BRETT PUMPHREY
7175 W JEFFERSON AVENUE, SUITE 1000
LAKEWOOD, CO 80235
PHONE: 720.524.7414
EMAIL: bhumphrey@columbineeng.com
STRUCTURAL ENGINEER
APEX ENGINEERING
JARED LAMBRECHT
2701 LAWRENCE ST., #19
DENVER, CO 80205
PHONE: 720.588.3222
EMAIL: jared@apex-engineering.com
UP
UP
UP
UP
N
0 4' 8' 16'
N
0 4' 8' 16'
J J
J
11'-0" 11'-9"
TRAINING ROOM
STORAGE
AV
N +7
(T
V
N +7
N +7
(T
V
N +7
N -D
N
N
N N
N -D
N
N+84" N+84"
N N
N+84" N+84"
N N
N
N
N
0 4' 8' 16'
N N
R R
RR
RR
RR
E R R R R
R
R
R
R R
R R
R R R
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
AA A
N
0 4' 8' 16'
E
A
R EXISTING 2' X 4' LIGHT FIXTURE TO BE REMOVED
AND/OR TO BE RELOCATED.
EXISTING 2' X 4' LIGHT FIXTURE.
NEW/RELOCATED 2' X 4' LIGHT FIXTURE. MATCH
BUILDING STANDARD.
EXIT LIGHT.
LIGHTING LEGEND
J
DUPLEX OUTLET AT WALL.
FOURPLEX OUTLET AT WALL.
DUAL PHONE AND DATA OUTLET AT WALL.
POWER LEGEND
DASHED LINE INDICATES
OUTLET TO BE REMOVED
ALL COMMUNICATION WIRING
SUPPLIED BY TENANT
DATA/VOICE FOR WORKSTATION.
INDICATES NEW OUTLET OR JUNCTION BOX.N
JUNCTION BOX.
GENERAL NOTES
3. MODIFY THE EXISTING HVAC SYSTEM AS REQUIRED TO
ACCOMMODATE THE NEW WALL CONFIGURATIONS. RELOCATE
EXISTING THERMOSTATS AS REQUIRED.
2. TELEPHONE AND DATA CABLING SHALL BE BY TENANT OR
TENANT'S VENDOR. ANY EXISTING TELEPHONE OR DATA
CABLING THAT CAN NOT BE RE-USED SHALL BE REMOVED BY
GENERAL CONTRACTOR AS PART OF THE PROJECT.
6. MODIFY THE EXISTING LIGHT SWITCHING AS REQUIRED TO
ACCOMMODATE THE NEW WALL CONFIGURATION.
7. MODIFY THE EXISTING FIRE SPRINKLER SYSTEM AS
REQUIRED TO ACCOMMODATE THE NEW WALL
CONFIGURATION.
4. PROVIDE NEW BLINDS AT ALL WINDOWS: SOLAR ROLLER,
STYLE: BALLAD. COLOR: SIAMESE.
1. ALL NEW DOOR AND WINDOW FRAMES TO MATCH EXISTING
BUILDING STANDARD IN BOTH FINISH COLOR AND PROFILE.
5. REMOVE EXISTING CEILING TILES THROUGHOUT AREA OF
WORK AND PROVIDE NEW: PERFORMA "SYMPHONY M".
N
E00
DOOR NO.
DOOR AND FRAME SCHEDULE
MANUFACTURER
MATERIAL
6' PAIR
WIDTH HEIGHT
8'-6" GLASS METAL
FRAME
MATERIAL
DOOR
FIRE
RATING
LOCKSET
HARDWARE
ENSURE EXISTING DOORS ARE
IN GOOD WORKING ORDER.
TIE EXISTING MAGNETIC LOCK
INTO EXISTING SMOKE DETECTION
SYSTEM. ENSURE MOTION
DETECTOR IS IN WORKING ORDER.
NOTES
D01 3' 7' WOOD METAL ---
D02 3' 7' WOOD METAL --- PASSAGE
D03 3' 6'-10" GLASS METAL ---
LOCKSET
LOCKSET PROVIDE NEW MAGNETIC LOCK
AND MOTION SENSOR. TIE INTO
EXISTING SMOKE DETECTION
SYSTEM.
"E" EXISTING DOOR TO REMAIN. CLEAN AND ENSURE ALL HARDWARE IS IN GOOD WORKING ORDER
"DXX" NEW OR RELOCATED DOOR W/ DESIGNATION
1. ALL NEW HARDWARE IS TO BE ADA APPROVED MATCH BUILDING STANDARD.
2. CONTRACTOR TO FIELD VERIFY ALL REQUIRED AND EXISTING HEIGHTS FOR NEW DOORS.
3. USE BUILDING STANDARD LOCK SETS.
"R" EXISTING DOOR TO BE REMOVED. TAKE CARE TO PROTECT DOOR, FRAME AND HARDWARE DURING REMOVAL
DOOR SCHEDULE
4. NEW DOORS TO BE RED OAK WITH CLEAR STAIN.
SCALE: 1/8" = 1'-0"
3 NEW WALL PLAN
A1-4NOT TO SCALE
1 VICINITY PLAN
A1-4
SCALE: 1/8" = 1'-0"
2 EXISTING FLOOR PLAN
A1-4
SCALE: 1/8" = 1'-0"
5 POWER PLAN
A1-4
SCALE: 1/8" = 1'-0"
4 CEILING PLAN
A1-4
AREA OF WORK
SUITE 4340
2,037 RSF
1/8"=1'-0"
(O) 303.778.0608
(F) 303.778.0609
(W) www.maharch.com
DO NOT SCALE THE DRAWINGS,
Request verification of dimensions from the Architect as required.
The General Contractor shall check and verify all levels, datums and dimensions and shall report any and all errors and omissions to the Architect immediately.
This drawing is to be read in conjunction with structural,mechanical, electrical and/or any other consultants drawings that may be applicable.
This drawing is the exclusive property of the Architect and must not be reproduced without his written permission.
Notes
MAH
Architectural Group
Stamp
Issues:
Scale
Date Drawn
Drawn By
Description
Sheet Number
05/19/2020
NKB
APRIL 21, 2020
L A
K E
W O
O D
W J
E F
F E
R S
O N
A V E
FINISH PLAN AND
ARCHITECTURAL DETAILS
A2-4
A C
A D
E M
Y C
E N
T E
R N
A T
IO
N
A L P
A R
K S
E R
V
IC
E
S U
IT
E
PERMIT/BID SET: 04.21.20
REVISION 04.24.20
BLDG DEPT RESP 1 05.19.20
06.25.20REVISION
07.17.20REVISION
TRAINING ROOM
STORAGE
AV
2A
3 41 3 41
2B 2B
2B2B
N
0 4' 8' 16'
2A
1A
1B
1C
2B
FINISH NOTES
NEW PAINT THROUGHOUT SUITE - 1 COAT PRIMER AT NEW
WALLS AND 2 COATS FINISH AT ALL WALLS: BENJAMIN
MOORE, OC-46 "HALO".
PROVIDE NEW CARPET AS INDICATED: PATCRAFT, "BIG
SPLASH!". COLOR: PLATFORM.
PROVIDE NEW 4" RUBBER BASE THROUGHOUT:
4" STRAIGHT AT CARPET- ROPPE, "FIG".
4" COVED AT VCT - ROPPE, "FIG".
NEW LVT FLOORING AT STORAGE ROOM: SHAW,
FLOORTE, "GOLIATH PLUS" 2042V. COLOR: LIGHT OAK
237.
NEW ACCENT PAINT AS INDICATED - 1 COAT PRIMER AT
NEW WALLS AND 2 COATS FINISH AT ALL WALLS:
BENJAMIN MOORE, 1680 "HUDSON BAY".
DOORS AND DOOR FRAMES TO MATCH BUILDING
STANDARD. CLEAN EXISTING/RELOCATED DOORS.
NEW DOOR TRIM PAINT AS INDICATED: BENJAMIN MOORE,
0C-47 "ASHWOOD".
PROVIDE NEW CARPET AS INDICATED: PATCRAFT,
"COLOR CHOICE". COLOR" GREY METAL.
FINISH FLOORING AS SCHEDULED.
PERMANENT CONCRETE FLOOR SLAB.
FLOOR BASE AS SCHEDULED.
METAL BOTTOM TRACK.
METAL STUD WALL FRAMING AS SCHEDULED.
5/8 TYPE "X" GYP. BOARD EACH SIDE TAPED
& FINISHED AS SCHEDULED.
METAL TOP TRACK.
L METAL TOP EDGE (TYPICAL).
SUSPENDED ACOUSTICAL CEILING TILE.
SUSPENDED ACOUSTICAL CEILING
TILE SUPPORT WIRE.
PERMANENT STRUCTURE ABOVE.
LATERAL BRACING TO STRUCTURE
ABOVE.
SLIP METAL HEAD TRACK.
PERMANENT STRUCTURE ABOVE.
METAL TOP TRACK.
SUSPENDED ACOUSTICAL CEILING
TILE SUPPORT WIRE.
SUSPENDED ACOUSTICAL CEILING TILE.
ACOUSTICAL CEILING SUPPORT WALL
ANGLE.
5/8 TYPE "X" GYP. BOARD EACH SIDE TAPED
& FINISHED AS SCHEDULED TO 6" ABOVE
FINISHED CEILING. GYP. BOARD TO EXTEND
TO PERMANENT DECK ABOVE.
2" UNFACED SOUND ATTENUATION
FIRE BLANKET..
METAL BOTTOM TRACK.
METAL STUD WALL FRAMING AS SCHEDULED.
FINISH FLOORING AS SCHEDULED.
PERMANENT CONCRETE FLOOR SLAB.
FLOOR BASE AS SCHEDULED.
EXISTING WINDOW MULLION TO REMAIN.
EXISTING GLAZING TO REMAIN.
1/8" X 1" WIDE FOAM STRIP & ACOUSTICAL
CAULKING. VERIFY W/ BUILDING MANAGEMENT.
PROVIDE NEW BREAK METAL AT NEW WALL
CONNECTION TO WINDOW MULLION. BREAK
METAL TO MATCH FINISH OF EXISTING WINDOW
MULLION.
EXISTING WINDOW SILL TO REMAIN.
METAL STUD WALL FRAMING AS SCHEDULED.
5/8" GYP. BOARD EACH SIDE TAPED
& FINISHED AS SCHEDULED.
EXISTING GLAZING TO REMAIN.
CONSTRUCT WALL PER REQUIREMENTS OF 2015
IBC TABLE 721.1(2), 13-1.1 AS REQUIRED TO
ACHIEVE A ONE-HOUR FIRE RATING
SLIP METAL HEAD TRACK.
PERMANENT STRUCTURE ABOVE.
METAL TOP TRACK.
SUSPENDED ACOUSTICAL CEILING
TILE SUPPORT WIRE.
SUSPENDED ACOUSTICAL CEILING TILE.
ACOUSTICAL CEILING SUPPORT WALL
ANGLE.
2" UNFACED SOUND ATTENUATION
FIRE BLANKET. EXTEND HEIGHT OF WALL.
5/8 TYPE "X" GYP. BOARD EACH SIDE TAPED
& FINISHED AS SCHEDULED.
METAL BOTTOM TRACK.
METAL STUD WALL FRAMING AS SCHEDULED.
FLOOR BASE AS SCHEDULED.
CAULK W/ FIRE STOPPING SEALANT, TOP &
BOTTOM OF WALL.
FINISH FLOORING AS SCHEDULED.
PERMANENT CONCRETE FLOOR SLAB.
SCALE: 1/8" = 1'-0"
1 FINISH PLAN
A2-4SCALE: 3" = 1'-0"
2 STANDARD PARTITION
A2-4
SCALE: 3" = 1'-0"
5 DEMISING PARTITION
A2-4
SCALE: 3" = 1'-0"
4 WINDOW PLAN DETAIL
A2-4
SCALE: 3" = 1'-0"
3 ONE HOUR RATED PARTITION
A2-4
1/8"=1'-0"
(O) 303.778.0608
(F) 303.778.0609
(W) www.maharch.com
DO NOT SCALE THE DRAWINGS,
Request verification of dimensions from the Architect as required.
The General Contractor shall check and verify all levels, datums and dimensions and shall report any and all errors and omissions to the Architect immediately.
This drawing is to be read in conjunction with structural,mechanical, electrical and/or any other consultants drawings that may be applicable.
This drawing is the exclusive property of the Architect and must not be reproduced without his written permission.
Notes
MAH
Architectural Group
Stamp
Issues:
Scale
Date Drawn
Drawn By
Description
Sheet Number
05/19/2020
NKB
APRIL 21, 2020
L A
K E
W O
O D
W J
E F
F E
R S
O N
A V E
ARCHITECTURAL
SPECIFICATIONS
A3-4
A C
A D
E M
Y C
E N
T E
R N
A T
IO
N
A L P
A R
K S
E R
V
IC
E
S U
IT
E
PERMIT/BID SET: 04.21.20
REVISION 04.24.20
BLDG DEPT RESP 1 05.19.20
06.25.20REVISION
07.17.20REVISION
27. DRYWALL
28. CARPENTRY
PART II. - GENERAL CONSTRUCTION INSTRUCTIONS
1. The General Contractor shall be responsible for coordinating work effort with all trades involved, i.e. electrician, telecommunications technician, etc..
2. The General Contractor shall perform and prosecute all work in a professional workmanship-like manner with all due diligence and expertise of the trade; acknowledge that time is of the essence with respect to all work performed under this contract.
3. The General Contractor shall perform all work with respect of the applicable Federal, State and Local governing codes and Americans with Disabilities Act (ADA) Guidelines.
4. The General Contractor shall be responsible for limiting access of all non-construction personnel to the work area and shall be responsible for taking all the necessary precautions, i.e. utilizing safety markers, etc., to ensure the safety of and to prevent exposing employees to any hazards that may be posed by the demolition efforts.
property management.
6. The General Contractor shall be responsible for protecting adjacent areas from damage and debris caused by the work under this contract.
7. The General Contractor shall;
A. Remove existing partitions where shown dotted on the demolition plan and dispose of these materials off site, being sure to take all necessary precautions to preserve existing wall partitions, doors and door frames, molding glazing extrusions and tempered glass panels to be reused for "new" construction.
B Be responsible for removing and disposing of all debris generated by the demolition activities on a daily basis.
8. The General Contractor shall perform all cutting and patching in a neat manner. Any existing finishes disturbed or damaged during the course of the demolition shall be repaired to match the existing in kind and finish.
9. All work being performed on this space is subject to the observation of the architects or property managers approved representative; any work found not to be in compliance with the construction documents or not within good construction standards, will be corrected at the Contractor's expense.
10. At the completion of work daily, all contractors will be responsible for removing all dust, dirt and debris generated by the demolition efforts, leaving the space in a clean, neat manner and readied for the next phase of construction or for normal business.
12. Smoke, fire, and sprinkler detectors if covered during construction shall be uncovered and in good working order at the end of every work day.
13. The contractor shall coordinate with Building engineering for all fire sprinkler drain downs and fire life safety zones that need to be shut down. At end of every work day the contractor shall coordinate with
1. The use of these documents is restricted to the original site for which they were prepared. Reuse or reproduction of the documents (in whole or in part) for any other purpose is prohibited. Title to the original documents remain with the Architect. Visual contact with the documents is Prima Facie evidence of the acceptance of these restrictions.
2. The A.I.A. 201 General Conditions - current edition shall apply to the project. A copy of the conditions is available at the office of the Architect
3. Drawings and any additional specification and addenda for the project shall be considered as equal parts; with all contents of each, considered at the contents of all.
4. The General Contractor is to guarantee all work including work by his subcontractors for a period of one (1) year commencing with the date of total completion (final punch list) of the work.
5. Dimensions to existing conditions are based upon the best available information and shall be verified by the contractor prior to proceeding with the work. All discrepancies or conflicts between the drawings and actual field conditions shall be brought to the attention of the Architect or landlords representative immediately and prior to proceeding with the work.
6. No changes are to be made to these drawings or to the construction described herein without prior notification or written approval from the Architect. Failure to do so may result in non payment for any and all unauthorized work, whether in progress and/or completed and any work required to correct unauthorized changes.
7. The General Contractor is to notify and gain approval from the building landlord for any work that is to be performed at night.
8. The General Contractor will be responsible for coordinating work efforts with all trades involved, i.e.
electricians, telecommunications technicians, carpet installers, etc..
9. The General Contractor shall perform and prosecute all work in a professional workmanship-like manner with all due diligence and expertise of the trade; acknowledge that time is of the essence with respect to all work performed under this contract.
10. The Contractor shall be responsible for obtaining all required Building Permits and maintaining these on site as required by local ordinances.
11. All work is to be performed in accordance with the most recent versions of ANSI NEC, ASHRAE, SMACNA, codes may take precedence where applicable.
12. All dimensions reflected on the plans are from finished face to finished face of partitions, unless noted otherwise.
13. All new gypsum wallboard partitions are to be constructed to the underside of the finished ceiling unless otherwise indicated. Refer to the typical wall section in the drawings.
14. All new partitions are to be aligned with existing building core construction, i.e. at columns, window mullions, etc,.
"except" where indicated on the plan.
15. All penetrations through fire rated walls are to be sealed or fire dampers provided to maintain appropriate fire rating, as required by code.
16. All new doors are to be undercut to 1/2" above measured from top of carpet pile.
17. The General Contractor shall provide and install fire extinguishers as needed. Distance of travel not to exceed 75 feet. Provide 5lb. ABC extinguishers.
18. The General Contractor shall provide and install ADA lever hardware as required by ADA including entrances and exits.
19. The General Contractor shall be responsible to field verify the condition of existing sprinkler heads whether they are being altered or not. Any sprinkler heads that are missing caps must be replaced with Building standard.
20. The General Contractor shall be responsible for limiting access of all non-construction personnel to the work area and shall be responsible for taking all the necessary precautions, i.e. utilizing safety markers, etc., to ensure the safety of and to prevent exposing employees to any hazards that may be posed by the demolition efforts.
21. The General Contractor shall be responsible for protecting adjacent areas from damage and debris caused by work under this contract.
PART I. -DEMOLITION INSTRUCTIONS
PART II. -GENERAL INSTRUCTIONS
PART III. -TELEPHONE / DATA INSTRUCTIONS
PART I. - DEMOLITION INSTRUCTIONS
INSTRUCTIONS FOR CONSTRUCTION DOCUMENTS
22. The General Contractor shall field verify the dimensions of all casework prior to fabrication of this work.
23. The General Contractor shall be required to collect and dispose of refuse off site as generated by the construction on a daily basis. The job site is required to be neat and orderly on a daily basis.
24. The General Contractor shall:
A. Furnish all new items on the drawings unless specifically noted otherwise, and labor necessary to ensure a complete installation of all work of these drawings.
B. Perform all cutting and patching in a neat manner. Any existing finishes disturbed or damaged by the contractor during the entire course of the work shall be repaired to match existing in kind and finish.
C. Be responsible for cleaning all interior surfaces, entire glass and frame surfaces, floor surfaces, prior to the final observation of the space by the tenant. All trash, construction debris, surplus materials, tools, etc., shall be removed by the contractor prior to final cleaning and final inspection.
management.
E. Be responsible for controlling access and for restricting and containing dust, noise and debris generated from the construction.
F. Understand that all work is subject to the observation of the Architect and inspection of the authorized landlord representative. Any work found not in compliance with the documents or within good construction standards by either party, will be corrected at the contractor's expense. If the work is still not corrected the
25. The contractor shall submit shop drawings for approval to the Architect for all millwork items, ornamental metal fabrication and custom design items as identified on the drawings prior to fabrication. Shop drawing submittals shall be comprised of (1) one reproducible sepia copy and (2) two prints of each drawing required to illustrate the intended method of fabrication.
26. The contractor shall submit to the Architect or Landlord’s representative for approval, three (3) 4" X 6” sample of each material, product or finish identified on the drawings or as requested by the Architect.
A. All drywall is to be taped, 3 coats spackle and sanded prior to installation of finished materials. All corners and edges are to have metal beads, bedded and sanded for finish. All work is to conform to U.S. Gypsum standard specs or equal, visible joints will not be acceptable.
B. Drywall areas above the ceiling line may only be fire taped if accepted by local code.
A. All dimensional lumber is to be "Non-Combustible" fire retardant.
B. The Contractor shall be responsible for all blocking, framing, scribe strips and filler panels as required.
A. No exterior painting or interior finishing shall be done under conditions which jeopardize the quality or appearance of the painting or finishing.
B. The Contractor is to confirm suitability of all walls to receive paint and wall coverings in a proper manner. The General Contractor is to contact the architect, in writing, if any walls are not acceptable to receive specified finishes. After acceptance of the surfaces, by application of the first coat of paint, the contractor is to assume responsibility for and rectify any unsatisfactory finish results. If, after treatment, the completed finish (or any portion thereof) blisters, checks, peels or otherwise shows indication of dampness or other irregular condition of surface, the painting contractor shall, at his own expense, remove the applied treatment and refinish the part affected to the satisfaction of the project coordinator (the painting contractor should determine dryness of all moisture - holding materials by use of a reliable electronic moisture meter.)
C. All surfaces are to be primed per manufacturer's recommendations.
D. All material and workmanship shall produce a proper installation of uniform quality of approved color without overlapping or streaks.
E. All painted surfaces are to receive a primer and two coats of latex base paint. Each coat of paint shall be applied at the proper consistency and brushed evenly, free of brush marks, sags, runs, with no evidence of poor workmanship. Color between coats of paint shall differ (color variations between coats should be enough to distinguish color change, but not enough to impair hiding). Care shall be exercised to avoid lapping of paint of glass or hardware. Paint to be sharply cut to lines. Finished paint surfaces to be free from defects or blemishes.
F. Painting contractor is to fill and touch up all nail holes in any wood trim.
G. Protective covers or drop cloths shall be use to protect floors, fixtures and equipment. Care shall be exercised to prevent paint from being spattered onto surfaces which are not to be painted. Surfaces from which such paint cannot be satisfactorily removed, shall be painted or repainted, as required to produce a finish satisfactory to the Architect.
H. The painting Sub Contractor shall store all painting materials and equipment, not in immediate use, in a room or rooms assigned for that purpose. Receiving and opening of all painting materials and mixing shall be done in such assigned room(s). All necessary precautions shall be taken to prevent fire. Rags, waste soiled with paint shall be removed from the premises at the end of each day's work or stored in metal container with metal covers.
A. All wall covering shall be supplied by the General Contractor . The General Contractor will install wall coverings.
B. Wall coverings are to be installed per manufacturer's recommendations.
C. All walls are to be properly sized prior to installation.
D. Wall covering surfaces are to be clean of all adhesive residue. All excess adhesive is to be removed with commercial cleaner compatible with the wall covering.
E. All extra wall covering rolls are to remain at the job site.
F. Wrap wall covering at least 6 inches beyond outside corners and at least 3 inches at inside corners.
G. Wall coverings are to be installed with straight cut edges, pattern matched, lap wall covering around corners under adjacent edge molding wherever possible.
A. Straight vinyl base applications at designated carpet finish areas. Applications to be 4" to match existing adjacent material and color.
B. All vinyl base is to be installed in accordance with the manufacturer's specifications. All surfaces are to be turned over to the Owner in clean condition and without mastic smears or seepage. All base joints and corners are to be tight and true without gaps.
A. The General Contractor is to provide properly prepared floor surfaces without holes, cracks and bumps for glue down carpet installation. All edge conditions are to be "floated up" as required to provide a smooth level transition.
B. The General Contractor is responsible for the proper preparation of the floor following the removal of existing floor covering to ensure that plastersizemigration does not occur.
C. Carpet is to be purchased and installed by the General Contractor.
D. Broadloom carpet is to be installed using the manufacturer's recommendations.
Refer to Drawings for floor finish locations.
E. All carpet seams are to be tightly butted without gaps or overlapping, making sure that plenty of glue is applied at the seams. Carpet edges are to be even and flush with the walls.
A. Provide records that will verify his training and experience in carpet installation. This should include a list of previous work that is similar in scope. Names of people to contact for references should also be included. A minimum of five years experience is required.
B. Provide evidence that the work shall be performed by skilled installers and that the number of installers assigned to the job site will be adequate to complete the installation.
C. Physically recheck all measurements provided in the specification. After completing the inspection and measurements, the installer may make suggestions regarding another carpet width or type of installation that may eliminate unnecessary seams and yardage. This recommendation should be submitted to the Architect for approval.
A complete seaming diagram should also be submitted for approval prior to ordering carpet. No request for extra carpet will be considered when measurement or takeoffs errors have been made by the installation contractor.
D. Inspect all for acceptable installation conditions. After inspection, the installer should submit a written report on any conditions that would prevent the proper installation of the carpet. Once the carpet has been installed, it shall be understood that the installer assumes responsibility for any unacceptable condition in the subfloor.
29. PAINTING
30. WALL COVERINGS (use of this material shall be at the contractors discretion for surface continuity)
31. VINYL BASE
32. CARPET
CARPET INSTALLER SHALL:
E. Install all carpet as recommended by the manufacturer's installation manual. Carpet shall be installed wall to wall, using continuous lengths and in as broad widths as possible. Cut edges shall be trued and appropriately treated to form non-travelling joints where exposed.
F. The General Contractor and carpet installer shall be fully responsible for the condition of the carpet until it has been finally approved. Upon completion of the project the installation shall be inspected by the authorized architect and installer. All dirt and carpet scraps must be removed from the surface of the carpet. All soiled spots or excessive adhesive on the carpet shall be removed with the proper spot remover. All pieces of loose face yarn must be removed with sharp scissors. The entire surface should be vacuumed with a heavy duty machine.
G. The installation contractor shall guarantee in writing to relay or restretch the carpet, repair seams, joints and edges one time each if required after the original installation is completed. The guarantee shall be in effect for one year after the final approval of the installation. The Owner shall provide the contractor with a two week notice regarding the needed repairs.
H. The Contractor shall be responsible for repair of any damage to wall surfaces, doors or woodwork.
A. All millwork is to be assembled in the field, scribed and joined accurately.
B. Fastenings are to be concealed and joints inconspicuous.
C. Millwork contractor shall make all joints in a permanent manner maintaining a uniform flush tight connection using a combination of screws, dowels and glue.
D. Where blind fastening is impossible and nails are required, millwork contractor shall drill holes uniformly, set and putty heads. Blind nail if possible.
E. All cut ends of millwork are to be field finished to match prefinished faces.
A. Refer to the Mechanical / Electrical drawings and specifications. The General Contractor shall be responsible for having the HVAC system balanced to maintain appropriate comfort levels in all occupiable areas. Certification management.
A. All punch list items to be completed within ten (10) working days of receipt by the General Contractor or his designated representative. All work not completed within the allocated time , or other such time frame as agreed to by both parties, will be completed by the Owner at the General Contractors expense.
B. At the completion of work, all contractors will be responsible for removing all trash, construction debris, surplus materials, tools, etc., from the site and the space is to be left in a clean, neat manner for final inspection.
C. All glass is to be cleaned of protective pads, mastic and markings.
D. All electrical panels and breakers are to be properly marked.
E. Upon completion of the project but before final punch list and inspector sign off the contractor is to provide a copy of sign off sheet.
F. The contractor shall supply MSDS sheets to the building management for all materials and products used in the project.
36. Final "as-built" drawings shall be required at the completion of the work and presented to the Architect or Landlord’s Representative. Neatly marked up record prints showing any field conditions or change orders incorporated into the work. The following areas shall be part of the final "as built" record set.
A. ARCHITECTURAL - All walls, doors, notes and dimensions or any adjustments reflecting field conditions and/or change orders.
B. ELECTRICAL - All outlets, switches, panels, light fixtures and riser diagrams shall be located with appropriate panel and circuit numbers. In addition, amount of spare capacity and panel size(s) to be indicated.
C. MECHANICAL/HVAC - All supply and return diffusers, fire dampers and thermostats shall be located with thermostats indicating the device(s) they control. All new ductwork to be located and dimensioned, diffusers to denote air quantities. Fan coil or other similar units to be verified with locations and sizes noted.
1. Refer to the electrical drawings in the plan set. Contact the Architect if there is any question regarding the placement of outlets, jacks or other equipment. (Equipment, jacks and data/voice wiring are provided and installed by the tenant unless otherwise noted.)
2. All work performed on this space is to be in compliance with the "Federal, State and Local governing codes.
3. Wiring contractor will be responsible for labeling both ends of all 4-pair cabling installed.
4. All contractors are required to perform work in a professional workmanship like manner, to collect all debris generated by their work and to leave the space in a clean, neat manner at the completion of their job.
5. If ductwork does not exist within the existing concrete floor slab, the contractor shall be responsible for arranging and obtaining X-Ray tests of the slab and gaining approval from the building landlord to proceed in areas requiring coring of the slab for electrical and voice/data access points.
6. Wiring contractor will be responsible for pulling out all existing voice/data cabling that will be deactivated and abandoned as per the new floor plans. Prior to demo of existing wiring, G.C. and wiring contractor to verify with building management and tenant if existing wiring is to remain.
7. All wall mounted telephone jacks, electrical and data outlets shall be mounted at 18" A.F.F. unless otherwise noted on the drawings. Report any discrepancies to the Architect immediately for clarification.
8. All light switches shall be mounted at 42" A.F.F. unless noted otherwise on the drawings.
9. Ground fault circuit interrupts must be utilized on any outlet within six (6) feet of sink.
10. The contractor shall relocate existing and provide new electrical outlets, light fixtures and switches as contractor shop drawings illustrating the new electrical riser diagram, circuitry and panel schedules prior to proceeding with the work, only if such work differs from the electrical drawings and specifications indicated on the plans.
11. The data and voice wiring, networking, jacks and all equipment and accessories related to tenant communications is to provided by tenant’s communications contractor. Coordination of existing communication wiring to be the responsibility of tenant’s contractor.
33. MILLWORK
34. HVAC
35. CLEAN UP AND FINAL INSPECTION
PART III - TELEPHONE/DATA ELECTRICAL INSTRUCTIONS
END OF INSTRUCTIONS FOR CONSTRUCTION DOCUMENTS
11. All demolition work shall be performed before or after normal business hours. (Monday thru Friday 7:00 am - 6:00 pm.) Any deviation from this time schedule shall be approved in writing from the Building Management.
5. The General Contractor shall be responsible for organizing and coordinating all work with the building the building engineering to turn the zones back on.
NFPA, BOCA, OSHA REGULATIONS, IBC, UBC, ADA ACCESSIBILITY GUIDELINES and any and all applicable codes. Local
G. A complete list of all subcontractor's names, addresses and telephone numbers are to be submitted to the building management .
contractor will pay for the work that is required that has been completed by the building Management.
D. Store all building materials off site or in an area as pre arranged and approved by the building of such to be provided to the building management and the engineering firm as directed by the required on the drawings. The contractor shall submit for approval to the building management , the electrical
| NATIONAL PARK SERVICE - CONSTRUCTION DRAWINGS-SMALL PROJECTS |
| 05 CD'S-SMALL PROJECT |
| A1-4 NEW WALL, CEILING & POWER PLANS |
| A2-4 FINISH PLAN AND ARCHITECTURAL DETAILS |
| A3-4 ARCHITECTURAL SPECIFICATIONS |
File details come from the government source that posted it. Updated .