This document is Amendment 0005 to a solicitation (140P2026R0045) issued by the National Park Service (NPS), Department of Interior (DOI), through the Denver Federal Center Contracting Services Division. The amendment provides responses to 21 questions submitted by potential offerors regarding a construction project at Rainy Lakes and Ash River parks.

Key clarifications include: Previously submitted Past Performance Questionnaires (PPQs) may be resubmitted in lieu of new ones; Project Experience must be submitted under Factor 1 while Factor 2 is reserved for past performance only; the Site Superintendent position must be held separately, though the Supervisor of Safety and Health Officer (SSHO) and Quality Control Manager duties may be shared by one individual; the period of performance is estimated for park/project work and not based on material lead times, with potential contract termination if transparency regarding back-ordered materials is lacking; third-party inspections are required per specifications; an NPDES permit is not expected, but contractors are responsible for all other required permits; Lead and Asbestos are not anticipated but contractors must verify site conditions; phasing is required with roads maintaining single-lane traffic and parking lots with boat ramps sequenced to minimize closures; landscaping restoration per plans and specifications is required using park standard "Midwest Master Premium Grass Seed"; anticipated contract award is late September 2026; sinkholes should be assumed at 24 inches depth; roadways must maintain one lane of traffic; and specific construction interval restrictions apply including Memorial Day, July 4th, Labor Day weekends, Fishing Opener Weekend (May 15, 2027), and various free fishing weekends. Contractors are responsible for calculating quantities, obtaining necessary permits, verifying slopes and drainage, and complying with specification sections 01 11 00, 01 32 16, 01 40 00, and 31 22 00. No site visit attendee sign-in sheet is available.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Rachel Dyer

See continuation page

NPS, DSC Contracting Services Div 1 Denver Federal Center, Building 50 P.O. Box 25287 Denver CO 80225-0287

DOI, NPS, DSC Contracting Services 1 Denver Federal Center, Building 50 P.O. Box 25287 Denver CO 80225-0287

PDS

PDS

140P2026R0045

VOYA 33500906/05/2026

05/07/2026

1 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P2026R0045/0005

The purpose of amendment 0005 is to provide answers to questions asked.

Question 1. Can we submit previously submitted

PPQs in lieu of new PPQs for Past Performance?

Answer 1. There is no issue if previously submitted PPQs are submitted in lieu of new

PPQs.

Question 2. Should Project Experience be included in Factor 1 or Factor 2? Factor 1 is titled PROJECT EXPERIENCE AND KEY PERSONNEL but the instructions for Factor 1 only mention Key

Personnel, not Project Experience. Factor 2 instructs offerors to "Submit Past Performance information for the same projects submitted under Project Experience (factor 2)". Can you please clarify?

Answer 2. Project Experience needs to be submitted under Factor 1. Factor 2 is only for past performance.

Question 3. Do the Superintendent, SSHO and QC

Manager need to be 3 separate individuals?

Answer 3. Duties for SSHO and QC Manager may be shared between one individual. Superintend duties must be assigned and performed separately.

Question 4. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?

Answer 4. Potentially, depends on materials and when they would come in ¿ period of performance is listed and estimated for park/project work and not on lead times of materials. Contractors need to understand termination can occur if transparency is not clear in the beginning of what materials are back ordered.

Question 5. Please provide the site visit attendee sign in sheet.

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

Answer 5. No sheet is available.

Question 6. Please confirm whether asbestos or lead is present on this project, and if so, provide the relevant documentation.

Answer 6. Lead and Asbestos are not anticipated. See specs. Contractor is responsible for verifying on site conditions and safety etc.

Question 7. Does this project require phasing?

Answer 7. Contractor will be responsible for phasing. Roads will need to maintain single lanes traffic. Work in parking lots with boat ramps will need to be sequenced to minimize ramp closure. See requirements in

Specification Section 01 32 16.

Question 8. Is this project tax exempt?

Answer 8. No.

Question 9. When do you anticipate on site work starting?

Answer 9. Contract is anticipated to award in late September 2026. Contractor will be responsible for submitting schedule as part of the solicitation and include submittal/procurement durations as well as any season restrictions for proposed work within the schedule.

Question 10. Are third party inspections required?

Answer 10. Third party inspections are required as indicated in the specifications for independent testing requirement.

Question 11. Is permitting required?

Answer 11. NPDES permit is not expected.

Contractor will be responsible for all other permits as necessary.

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

Question 12. Are red, yellow and blue tops required?

Answer 12. Refer to solicitation documents for this answer.

Question 13. Is there a bulk water fill i.e. a hydrant or water source we can pump from for grading operations in close proximity?

Answer 13. There are no hydrants located within park boundaries at the Rainy Lakes project limits. Contractor will be responsible for sourcing water. Ash River has one hydrant within park property located near the employee housing area at approximately

48.43441247904648, -92.84542166103998.

Question 14. Is any landscaping restoration required for this project? For example;

topsoil, seeding, and fertilizer.

Answer 14. Landscaping restoration required per the plans and specifications. Park standard seed mix is ¿Midwest Master Premium Grass

Seed¿.

Question 15. Please provide staking data points for the project.

Answer 15. All available information has been provided in the solicitation.

Question 16. Can we shutdown the road for the duration of the project or do we need to maintain one lane of traffic?

Answer 16. Roadways will need to be maintain one lane of traffic.

Question 17. Please provide approximate depth of existing sinkholes.

Answer 17. Contractor to assume 24" depth for sinkholes indicated on drawings.

Question 18. Does the QCM and Tester have to be

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

2 separate individuals?

Answer 18. Tester must meet all certification requirements for respective testing. See requirements in specification section 01 40

00.

Question 19. What are the limitations for construction intervals (for proposed road work)?

Answer 19. See section 01 11 00 in specs for further restrictions. Memorial Day Weekend starting Friday and extending through Tuesday.

July 4th weekend starting Friday and extending through Monday. Labor Day weekend starting

Friday and extending through Tuesday. Fishing

Opener Weekend May 15th, 2027. Rainy Lake Base

Fishing Tournament Weekend August 27-29, 2026 & late August 2027. Free Fishing Weekends per

Minnesota Department of Natural Resources

(1/16-1/18 2027, 5/8-5/9 2027, 6/4-6/6 2027)

Question 20. Please provide bidding quantities for deteriorated base course.

Answer 20. Calculating quantities to complete the subject work as per plans and specs are the responsibility of the contractor.

Question 21. Is survey required?

Answer 21. Contractor will be responsible for verifying slopes for accessibility walkways and parking spots and to ensure no standing or ponding water per requirements of Grading specification 31 22 00.

All other terms and conditions hereby remain unchanged.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110