This is an Amendment to Solicitation for federal construction services (Standard Form 30, Amendment 0002) issued by the National Park Service (NPS) Department of the Interior for Solicitation 140P2026B0003.
The amendment provides site visit sign-in sheet documentation and PowerPoint presentation materials for a pre-bid meeting related to CURE 318472, a rehabilitation project for water and wastewater systems at Curecanti National Recreation Area. The solicitation is a sealed bid, firm fixed-price contract for water and sewer line construction (NAICS 237110) with a small business size standard of $45 million and a total small business set-aside designation. Key dates include a pre-bid site visit on September 10, 2026, pre-bid questions due September 22, 2026, and sealed bids due September 29, 2026 at 2:00 p.m. MT (electronic submission to Vicki Freese-Supler and Daryl Hawkins). The contract includes five base line items covering sanitary system repairs, water supply repairs, complete SCADA system replacement, marina lift station work, and archaeological monitoring, plus four optional line items for gravity sewer, lagoon repairs, lift station replacement, and Lake Fork sanitary system work. The period of performance is 550 calendar days after Notice to Proceed, with contract value exceeding $10 million. Liquidated damages are set at $1,420 daily, and the contract requires performance and payment bonds. All terms and conditions of the original solicitation remain unchanged except as amended.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Vicki Freese-supler
See continuation page
NPS, DSC Contracting Services Div 1 Denver Federal Center, Building 50 P.O. Box 25287 Denver CO 80225-0287
DOI, NPS, DSC Contracting Services 1 Denver Federal Center, Building 50 P.O. Box 25287 Denver CO 80225-0287
PDS
PDS
140P2026B0003
09/11/2026
08/26/2026
1 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P2026B0003/0002
CURE 318472 - Rehabilitation of Water &
Wastewater System - Curecanti National
Recreation Area
The purpose of this amendment is to provide the site showing sign in sheet and power point presentation.
All other terms and conditions of the solicitation remain unchanged and in full force and effect.
CURE 318472
Replace Water and Wastewater Systems Elk Creek, Lake Fork, and Iola | Curecanti National Recreation Area
100% Final Construction Documents | July 2026
CURE 318472 | Project Scope Summary
SUMMARY:
Replace and modernize critical potable water, wastewater, lift-station, and SCADA infrastructure serving developed park areas at Elk Creek and Lake Fork, and Iola
Historic photos provided for refernece
SITE ORIENTATION
Elk Creek
Primary water distribution, wastewater collection and conveyance, lift-station work, lagoon work, and SCADA upgrades.
Lake Fork
Wastewater collection/conveyance, septic tank, leach field, lift station, electrical/mechanical upgrades, and SCADA telemetry.
Iola
SCADA replacement at well and tank sites, integrated into the system-wide controls modernization.
Source: Drawing GU.01 and Specification 01 11 00, Work Covered by Contract Documents.
ELK CREEK - SANITARY
Sanitary System Work Package
• New 4-inch HDPE force main by HDD from the primary lift station toward the lagoons
• Existing pipe/structures removed and replaced in-kind where open-cut is required
• Main lift station drywell access improvements, ventilation, controls relocation, manual transfer switch, and portable-generator connection
• Bid Item: Sanitary Sewer System
• Option 01: Gravity Sewer System
• Option 02: Lagoon Repairs
• Option 03: Lift Station Replacement
ELK CREEK - WATER
Water system work package
• Replace campground, maintenance, visitor center, and storage-tank-area distribution piping.
• Install additional isolation valves to improve maintainability.
• Use HDD for the storage tank / water-main segment while maintaining the existing potable system.
• Modify the water storage tank valve vault to improve access and reduce confined-space burden.
• Replace Wellhouse #3 raw-water sample loop.
Sources: Specification 01 27 00 CLIN 0002; Cost Estimate Narrative; Drawing water plan/profile sheets.
SCADA MODERIZATION
System scope
• New SCADA PC and headend telemetry unit at the maintenance shop
• 10 RTUs across Elk Creek, Lake Fork, and Iola
• Updated instrumentation
• Local OITs at key sites
• UPS, utility-power-failure, and communications-failure alarming
• Fiber optic communications between two Elk Creek buildings
• FAT, SAT, commissioning, and training.
Sources: Specification 01 11 00 SCADA description; Specification Divisions 25, 26, and 40; Drawing controls sheets.
LIFT STATIONS
SCOPE:
• Marina Lift station @ Elk Creek Marina: replacement in kind with larger internal capacity.
• Primary (Main) Lift Station @ Elk Creek: rehabilitation / replacement items in base and options.
• Lake Fork Lift Station: replacement in the Lake Fork option package.
• Options for complete lift station replacement (option 03)
Sources: Specification 01 27 00 CLINs 0001, 0004, and options; Drawing civil/electrical/mechanical lift-station sheets.
LAKE FORK & IOLA
Lake Fork Wastewater collection and conveyance piping, septic tank, leach field, and lift station removal/replacement, plus SCADA telemetry and electrical/mechanical upgrades.
Iola SCADA replacement at the well and tank sites, integrated into the overall control system.
Sources: Specification 01 11 00 scope summary; Cost Estimate Narrative CLIN 9; Drawing Lake Fork sheets.
CONSTRUCTION SEQUENCING
Key restrictions Continuous satisfactory operation • 48-hour shutdown coordination • CO pre-approval for water/sanitary impacts
• road closures limited and approved • normal work hours with campground/marina limitations
Source: Specification 01 11 00, Work Phases, Public Use of Site, and Work Restrictions.
GEOTECHNICAL AND CONSTRUCTABILITY
• Seven borings were drilled across the Elk Creek project area.
• Basic profile: roughly 3–10 feet of residual soils over sandstone bedrock.
• Sandstone is hard, weathered, and moderately to highly fractured.
• Some trench excavation may require jackhammering or blasting.
• Groundwater was not encountered during drilling, but seasonal fluctuation remains possible.
• On-site soils are generally suitable for fill/backfill except where structural fill is required.
Sources: Geotechnical Report Executive Summary, Sections 2.1 and 3.2; Geotech Figures 2 and 3.
ARCHEOLOGICAL MONITORING
• Required for all ground disturbing activities
• ARPA Permit
• Monitoring Plan
Sources: Geotechnical Report Executive Summary, Sections 2.1 and 3.2; Geotech Figures 2 and 3.
CONTRACT STRUCTURE
Sources: Cost Estimate Project Cost Summary and Cost Estimate Narrative, Budget section.
BRCA 318695 | Pre-Bid Site Visit
Solicitation 140P2026B0003
Pre-Bid Site Visit | Final Construction Documents dated July 13, 2026 | 15 Spec 01 35 13.22 + 01 27 00
Summary of Solicitation and Award Information
Refer to the Solicitation for Complete Information
• Pre-Bid on Site Meeting – September 10, 2026
• Pre-Bid Questions Due – September 22, 2026
• Bids Due – September 29, 2026
• Submission – Electronic Only to: Vicki Freese-Supler and Daryl Hawkins
• Type of Contract – Firm Fixed Price
• NAICS Code 237110 – Water and Sewer Line and Related Structures
• Small Business Size Standard - $45M
• THIS IS A TOTAL SMALL BUSINESS SET ASIDE
• PERIOD OF PERFORMANCE: Project Completion 550 calendar days after Notice to Proceed
• CONTRACT VALUE: More than $10M
• Solicitation Process: Sealed Bid
Pre-Bid Site Visit | Final Construction Documents dated July 13, 2026 | 15 Spec 01 35 13.22 + 01 27 00
Solicitation Clauses
FAR 52.211-12 – Liquidated Damages-Construction - $1,420.00 FAR 52.228-1 – Bid Guarantee FAR 52.228-15 – Performance and Payment Bonds FAR 52.236-2 – Differing Site Conditions FAR 52.236-3 – Site Investigations and Conditions Affecting the Work FAR 52.236-9 – Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements FAR 52.236-21 – Specifications and Drawings for Construction
Pre-Bid Site Visit | Final Construction Documents dated July 13, 2026 | 15 Spec 01 35 13.22 + 01 27 00
Bids should be submitted electronically with the following denoted in the subject line: CURE 318472 - 140P2026B0003 – Sealed Bid Submission, and include the Contractor’s Name. It is the responsibility of the bidders to ensure bids are received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids.
FORMAT: Submit (1) one electronic copy
ORGANIZATION:
• SF33
• Amendments
• Section B Price Schedule
• SF 24 Bid Bond (Or Other Suitable Bid Guarantee)
• Section K Representations and Certifications
• General References
LOCATION OF BID OPENING: To be held electronically via Project Teams at 2:00 p.m. MT
• Meeting ID: 231 130 473 934 268
• Passcode: pn9fq7Yv
• Phone: 1-202-640-1187, 164892384#
Solicitation 140P2026B0004
Pre-Bid Site Visit | Final Construction Documents dated July 13, 2026 | 15 Spec 01 35 13.22 + 01 27 00
Section M – Basis for Award
To be eligible for award of contract, the offeror shall submit prices for each line item in Bid Schedule to include all five (5) Base Line Items and all four (4) Line Items designated as Options. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available and the Contracting Officer determines the price to be reasonable.
Per FAR provision 52.217-5, Evaluation of Options (JULY 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for all base items, Line Items 5 through
11. Evaluation of options will not obligate the Government to exercise the option(s). If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 60 days after contract award, per FAR clause 52.217-7, Option for Increased Quantity Separately Priced Line Item (MAR 1989).
Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.
Solicitation 140P2026B0004
Pre-Bid Site Visit | Final Construction Documents dated July 13, 2026 | 15 Spec 01 35 13.22 + 01 27 00
Thank You For Your Interest in This Project
National Park Service U.S. Department of Interior
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
| ADP7198.tmp |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
File details come from the government source that posted it. Updated .