Amendment_001_0001.pdf
PDF 869 KB Posted
- Solicitation number
- 140P2025R0066
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Knife River Elbee Bend Bank Stabilization project at the Knife River Indian Villages National Historic Site. Amendment 0001 updates two specific attachments: Section J Attachment 14 (Solicitation Volume II PSP Cover) is being replaced with an updated version, and Section J Attachment 6 (Appendix C Permit Conditions) is being updated to include 401 and 404 permits. The amendment is issued by the National Park Service Denver Service Center, with a solicitation number of 140P2025R0066 and an effective date of 06/30/2025. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2025R0066 x x x
PDS
Denver CO 80225-0287 P.O. Box 25287 1 Denver Federal Center, Building 50 NPS, DSC Contracting Services Div
06/30/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning ___1________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/30/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to replace
Section_J_Attachment_14_Solit_Volume_II_PSP_Cover.pdf with updated version and to include the 401 and 404 permits to
Section_J_Attachment_6_Appendix_C_Permit_Conditions_affecting_the_construction_process. All other terms and conditions remain unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Stormy Gallagher
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
KNIFE RIVER INDIAN VILLAGES
NATIONAL HISTORIC SITE
STANTON, ND
KNIFE RIVER ELBEE BEND BANK
STABILIZATION
VOLUME II – BUSINESS & PRICE
KNRI 257081
Solicitation #: 140P2025R0066
REQUEST FOR PROPOSAL
(RFP)
Proposal Submission Package
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
For Technical Volume I:
FACTOR 1 – TECHNICAL APPROACH AND SCHEDULE
FACTOR 2 – PROJECT EXPERIENCE
FACTOR 3 – KEY PERSONNEL EXPERIENCE
FACTOR 4 – MANAGEMENT APPROACH
FACTOR 5 – PAST PERFORMANCE
For Business & Price Volume II:
1. SF 1442
2. AMENDMENTS
3. SECTION B PRICE SCHEDULE
4. SF 24 BID BOND
5. SECTION K REPRESENTATIONS AND CERTIFICATIONS
6. GENERAL REFERENCES
7. SUBCONTRACTING PERCENTAGE WORKSHEET
4201 Normandy Street | Bismarck ND 58503-1324 | Fax 701-328-5200 | deq.nd.gov
Director’s Office Division of Division of Division of Division of Division of Chemistry 701-328-5150 Air Quality Municipal Facilities Waste Management Water Quality 701-328-6140
701-328-5188 701-328-5211 701-328-5166 701-328-5210 2635 East Main Ave Bismarck ND 58501
February 3, 2025
Pamela Massaro, Agent Benjamin Reile, Project Manager
Stantec Consulting Services Inc. US Army Corps of Engineers, Omaha District
3325 South Timberline Rd, 2nd Floor 3319 University Driver
Fort Collins, Co 80525 Bismarck, ND 58504 pamela.massaro@stantec.com Benjamin.D.Reile@usace.army.mil
Thomas Smith, Park Manager
National Park Service (Knife River Indian Village)
564 County Rd. 37
Staton, ND 58571
Tom_Smith@nps.gov
Clean Water Certification for: NWO-2021-01797-BIS [Elbee Bend Bank Stabilization Project at Knife River Indian Village Historical Site]
Dear Ms. Massaro, Mr. Smith, and Mr. Reile:
The North Dakota Department of Environmental Quality (DEQ) has reviewed the bank stabilization project for compliance with the Standards of Quality for Waters of the State (N.D.A.C. 33.1-16-
02.1). Based on the review, the DEQ issues clean water certification with the following condition:
If a spill of fuels, lubricants, antifreeze, hydraulic fluids, petroleum products, hazardous and/or potentially hazardous materials occurs during construction submit an environmental incident report at https://deq.nd.gov/WQ/4_spill_Investigations/IncidentReporting.aspx.
North Dakota Department of Environmental Quality reserves the right to amend this certification if conditions change or alternatives are proposed that meet the goal of sustaining the standards.
Should you have any questions, I may be reached at 701.328.5268.
Sincerely, Peter N. Wax
Division of Water Quality • Old Scientist
701.328.5268 • 701.328.5200 (fax) • pWax@nd.gov • https://deq.nd.gov/ mailto:pamela.massaro@stantec.com mailto:Benjamin.D.Reile@usace.army.mil mailto:Tom_Smith@nps.gov https://deq.nd.gov/WQ/4_spill_Investigations/IncidentReporting.aspx mailto:pWax@nd.gov https://deq.nd.gov/ http://www.health.nd.gov/
DEPARTMENT OF THE ARMY PERMIT
Permittee: National Park Service (Attn: Mr. Thomas Smith, Superintendent)
Permit No. NWO-2021-01797-BIS
Issuing Office North Dakota Regulatory Office
NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term “this office” refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer.
You are authorized to perform work in accordance with the terms and conditions specified below.
Project Description: The project will stabilize the right/west bank of the Knife River by installing 1,100 linear feet of longitudinal peak stone toe protection (LPSTP) approximately 80-feet riverward of the existing toe of slope. An earthen embankment would be constructed between the existing bank and LPSTP to establish slopes able to support riprap covered with topsoil to promote vegetation establishment. A 10-foot-wide trench of buried rock would be constructed upstream at the tie point to hold the existing slope in place during construction and prevent future flanking of the embankment. The downstream end of the project would transition to a simple revetment at the existing grade. The project would result in the permanent discharge of fill into approximately 4.56 acres of waters of the United States. Work includes bank stabilization to protect cultural resource and improve safety of visitors and staff at the Knife River Indian Villages National Historic Site.
Project Location: The project is located in and along the Knife River in Section 28, Township 145 North, Range 84 West, Mercer County, North Dakota.
Permit Conditions:
General Conditions:
1. The time limit for completing the work authorized ends on May 15, 2030 . If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached.
2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity, or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions.
6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Special Conditions:
a. The Permittee shall comply with all terms and conditions of the enclosed 3 February 2025 Section 401 of the Clean Water Act Water Quality Certification.
b. The Permittee shall notify the District Engineer at what time the activity authorized herein will be commenced, as far in advance of the time of commencement as the District Engineer may specify, and of any suspension of work, if for a period of more than one week, resumption of work and its completion.
c. The Permittee shall implement the Memorandum of Agreement (MOA), entitled An Undertaking to Stabilize the Riverbank to Protect Archaeological Resources and Infrastructure at the Elbee Bend of the Knife River, and signed by these entities, in its entirety.
After a detailed and careful review of all the conditions contained in this permit, the permittee acknowledges that, although said conditions were required by the Corps of Engineers, the permittee nonetheless agreed to those conditions voluntarily to facilitate issuance of the permit and will comply fully with all the terms of the permit conditions.
Further Information:
1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:
( ) Section 10 of the River and Harbors Act of 1899 (33 U.S.C. 403).
(X) Section 404 of the Clean Water Act (33 U.S.C. 1344).
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, state, or local authorizations required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal project.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.
5. Reevaluation of Permit Decision. This office may reevaluate its decision on this permit at any time circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:
May 15, 2025
1200 Memorial Highway | Bismarck, ND 58504 | 701.328.2750 | DWR.nd.gov
SOVEREIGN LAND PERMIT NO. SL2521
This permit authorizes the Permittee to construct a project on Sovereign Lands, pursuant to North Dakota Century Code ch. 61-33.
Permittee: National Park Service 564 County Road 37 Stanton, ND 58571
Location: NW ¼ SE ¼ of Section 28, Township 145 North, Range
84 West, Mercer County
Project Description:
The Permittee is hereby authorized to reshape and harden the right bank and reshape the left bank of the Knife River at the Elbee Bend Site within the Knife River Indian Village National Historic Site in Mercer County (Project).
The Project will involve clearing and salvage of approximately 6,283 cubic yards of topsoil for reuse, construction of a temporary river crossing, reshaping approximately 1,200 and 1,015 linear feet of the right and left banks of the Knife River respectively, hardening the right bank, topsoiling and reseeding the site, and employment of erosion and sedimentation control measures.
The temporary river crossing will be located immediately upstream of Elbee Bend and would be approximately 130 feet long and 20 feet wide consisting of approximately 1,400 cubic yards of material and five 4.5-foot diameter culverts. Once construction and restoration of the left bank is complete, the temporary crossing will be removed from the river in its entirety and the bed and banks restored and revegetated with species native to the area.
The left bank (inside bend) will be reshaped to a series of shelves, topsoiled, and seeded with species native to the area and suited for the moisture regime of each shelf. The right bank (outside bend) will be reshaped and topped with approximately 1,348 cubic yards of granular bedding material topped with approximately 14,435 cubic yards of rock
Sovereign Land Permit No. SL2521 riprap. The upper portion of the riprap as well as any disturbed areas located above the riprap will be topsoiled, reseeded with species native to the area, and covered with biodegradable erosion control blankets, matting or mulch.
Erosion and sediment control measures will be deployed throughout construction to prevent loss of material, aid in restoration of all disturbed areas, and prevent sediment from entering the river.
Any other use of sovereign land is prohibited. Any proposed additional use must comply with the application and permitting process and all other requirements of state law.
RECOMMENDATIONS
1. The Permittee enter the Project area into the U.S. Fish and Wildlife Service
(Service) Information for Planning and Consultation (IpAC) on-line project planning tool paying particular attention to the Northern Long-eared Bat and consult with the Service if warranted.
GENERAL CONDITIONS
1. This Authorization is site specific for the project as proposed and outlined in the application and supporting documents. Any changes or deviation from the site or design will need authorization from the Director.
2. Authorization of this undertaking is a privileged use of a public resource and does not constitute a property right. The public use and enjoyment of the Knife River is of high priority.
3. All construction, maintenance, and reclamation activities must be carried out in a manner reasonably designed to prevent degradation of the Knife River.
4. The Permittee must implement measures to minimize the opportunity for sediment to enter the Knife River during construction.
5. The Permittee must comply with all state regulations with regard to the prevention of introduction of Aquatic Nuisance Species into the state’s waters.
6. Prior to or during construction, if items of substantial archeological value are discovered or a deposit of such items is disturbed, the Permittee must cease construction activities in the area so affected. The Director and the State
Sovereign Land Permit No. SL2521
Historical Preservation Office must be promptly notified of the discovery, and construction will not resume until both offices give written permission.
7. At the discretion of the Director, in accordance with the exercise of any of the
Director’s duties, the project is subject to modification or removal at the expense of the Permittee.
8. The Director or the Director’s representative must have access to inspect the authorized project during construction and associated activities and for the life of the project to ensure that it is being or has been accomplished and maintained in accordance with the terms and conditions of this Authorization.
9. The Permittee must obtain any other local, state, or federal permits or approvals that may be necessary prior to construction.
10. By granting this Authorization, no liability for damages of any kind, including those caused by improper construction, construction and maintenance, design or failure in design, materials, or workmanship, is assumed by or transferred to the State of North Dakota, the Director, the Department of Water Resources or any of their respective employees, agents, or assigns. The Permittee will indemnify and hold harmless the State of North Dakota, its officials, employees, agents, boards, commissions, and assigns for any and all liability for work performed and action taken under this Authorization.
Reice Haase Date Director
John Paczkowski, P.E. Date State Engineer
04/24/2025
04/30/2025
| 2025-07-02T07:55:33-0600 | |
| STORMY GALLAGHER |
File details come from the government source that posted it. Updated .