This file is an Amendment 0002 Questions and Answers document for Solicitation 140P2025R0050, a George Washington Memorial Park (GWMP) Bridge Preservation project. The amendment addresses six key clarification points, including the provision of missing forms (Project Experience and General References), removal of an electronic funds transfer clause, and clarification of pavement preservation quantities for Option C and Option D.

The solicitation involves pavement preservation work for the National Park Service, encompassing seal coat, mill & overlay, full depth replacement, and preventative maintenance on asphalt roads and parking lots throughout the park. Specific preservation activities include crack sealing, chip sealing, patching, joint and crack repair, and mill and overlay. The amendment provides technical clarifications, such as confirming that repointing of mortar joints will be measured in square feet of structure face, and that FHWA specifications do not apply to this specific project.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0002 Q&A 140P2025R0050

1. In the RFP, p. 72, Section L, E. 3. CONTENTS: FACTOR 1 – PROJECT EXPERIENCE, says, “Submit the attached "Project Experience form.” We see a past performance questionnaire but no project experience form. Please provide.

Project Experience form will be provided as Amendment 0002 Attachment 2.

2. in the RFP p. 73, Section L, F 3 GENERAL REFERENCES, says, “Complete and submit the attached "General References form.“ We don’t see this form. Please provide.

General Reference form will be provided as Amendment 0002 Attachment 3.

3. In the RFP p. 68, 52.232-38 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH OFFER, says we are to provide our electronic funds transfer information with the o er. Where should we provide this--in the price volume? Or was it intended that only the successful contract awardee would provide this information AFTER the actual award?

This information is not required, clause will be removed. Please refer to Amendment 0002 Attachment 4.

4. In the Plans, p. 11, the table SUMMARY OF PAVEMENT PRESERVATION QUANTITIES - OPTION D, at the bottom it reflects the total quantities but for the OPTION C. Please clarify the optional CLIN this table refers to.

Please see Amendment 0002 Attachment 1 which updates Option Descriptions on sheet 11.

5. In the Plans, p. 11, the table SUMMARY OF PAVEMENT PRESERVATION QUANTITIES - OPTION E, at the bottom it reflects the total quantities but for the OPTION D. Please clarify the optional CLIN this table refers to.

Please see amendment 0002 Attachment 1 which updates Option Descriptions on sheet 11.

6. Additional - For items included in some CLIN's "Repointing of mortar jonits", the FHWA standard is payable by linear feet "LF", but in the Specifications provided it shows the unit of measure as square feet "SF". The SF mentioned for every item refers to the surface of the joint or the surface of the entire structure? The specification supersedes the drawing, please advice which if the unit of measure is correct.

The unit of measure is confirmed by the square foot of structure face for repointing of mortar joints. FHWA specifications do not apply to this project.