B09_Att_A0001_List_of_Pre-Bid_Attendees_and_Answer_to_Vendor_Questions_as_of_6-23-2025_0001.pdf
PDF 201 KB Posted
- Attached to
- ACAD 312014 - Park Loop Road
- Solicitation number
- 140P2025R0005
About this file
This document is a pre-bid site visit attendee list and vendor Q&A document for the ACAD 312014 Park Loop Road federal contract opportunity (Solicitation Number 140P2025R0005). The document provides key project details including that the National Park Service (NPS) intends to maintain at least one lane of travel open during construction, with potential brief closures during culvert replacements. The project end date is planned for 11/30/2025, with the notice of award expected in mid to late July 2025. NPS is flexible on the timeline and open to schedule adjustments.
Specific project requirements include disposing of millings off-site, using a paved swale, and potentially utilizing warm mix additives to optimize paving during shoulder seasons. Pre-bid site visit attendees included representatives from Harold MacQuinn and Northeast Paving. The solicitation appears to involve road construction and infrastructure improvements within a park setting, with NPS demonstrating willingness to collaborate with potential contractors on technical and scheduling considerations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Att_1_A0002_Q_A_0002.pdf | ||
| Sol_140P2025R0005_Amd_0002.pdf | ||
| Sol_140P2025R0005_Amd_0001.pdf | ||
| B08_Att_3_Contract_Price_Schedule_.xlsx | XLSX spreadsheet | |
| B08_Att_2_Drawings.pdf | ||
| B08_Att_4_Project_Experience_Questionnaire.docx | DOCX document | |
| Sol_140P2025R0005.pdf | ||
| B08_Att_1_Specifications.pdf | ||
| B08_Att_5_Past_Performance_Questionnaire.docx | DOCX document | |
| B08_Att_6_Banking_Information_Questionnaire.docx | DOCX document | |
| B08_Att_8_WD_Highway_ME20250036_1-3-25.pdf | ||
| B08_Att_7_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B09_Att_A0001 List of Pre-Bid Attendees and Answer to Vendor Questions as of 6-23-2025 140P2025R0005 ACAD 312014 Park Loop Road
Pre-Bid Site Visit Attendees:
Harold MacQuinn Chip Reeves chipreeces@haroldmacquinn.com Northeast Paving Greg Dexter greg.dexter@eurovia.us
Answers to Vendor Questions as of 6-23-2025:
1. Will there be a complete shutdown allowed?
The intention will be to maintain a lane of travel open at all times. The park is willing to discuss planned periods of closure during culvert replacements.
2. What is the expected end date for construction?
End date of project is planned for 11/30/2025. NPS understands that this timeline is tight and is open to alterations to maximize schedule eƯiciency.
3. Will NPS consider a warm mix additive to meet a fall paving time frame?
Yes, NPS will consider submissions to optimize paving during shoulder seasons.
4. Millings to be disposed of oƯ-site?
Yes, this will need to be disposed of outside of the park.
5. Will it be a chip seal swale or a paved swale?
Paved swale
6. When is the expected notice of award?
Mid to late July.