B09_Att_9_RFI_9-12-24_0001.pdf
PDF 137 KB Posted
- Attached to
- INDU 305176 - Marquette Greenway Trail Constructio Federal contract opportunity
- Solicitation number
- 140P2024R0155
About this file
This document is a Request for Information (RFI) and Clarification related to the Marquette Greenway Trail Construction solicitation (Solicitation Number: 140P2024R0155) issued by the Department of the Interior National Park Service National Office.
The RFI addresses several questions from prospective contractors, including qualifications for the 8(a) set-aside, the composition of the 6-inch aggregate base, tree removal responsibilities, reuse of existing gravel, and utility locations. The National Park Service provides responses to these questions, clarifying that contractors must follow the engineered plans and specifications, that the contractor is responsible for identifying tree removal means and methods, and that the contractor should submit a ticket to Indiana 811 to locate utilities. The document also includes a clarification on the process for submitting questions per the solicitation instructions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2024R0155_Amd_0002.pdf | ||
| B09_Att_14_Solicitation_Sections_B-M_(rev)_9-24-24_0002.pdf | ||
| B09_Att_13_RFI_9-24-24_0002.pdf | ||
| Sol_140P2024R0155_Amd_0001.pdf | ||
| B09_Att_10_Phase_One_Tree_Removal_0001.xlsx | XLSX spreadsheet | |
| B09_Att_11_Identified_Tree_Photos_0001.pdf | ||
| B09_Att_12_Site_Visit_Sign_In_Sheet_0001.jpg | JPG image | |
| B08_Attach_1_Specifications.pdf | ||
| B08_Solit_INDU_305176_Sections_B-M__.pdf | ||
| B08_Attach_8_Limitations_On_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Attach_7_Banking_Information_Questionnaire.docx | DOCX document | |
| B08_Attach_2_Drawings.pdf | ||
| B08_Attach_5_Project_Experience_Questionnaire.docx | DOCX document | |
| B08_Attach_3_Contract_Price_Schedule.xlsx | XLSX spreadsheet | |
| B08_Attach_4_Wage_Determination_IN20240001.pdf | ||
| Sol_140P2024R0155.pdf | ||
| B08_Attach_6_Past_Performance_Questionnaire.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI and Clarification
INDU 305176 Marquette Greenway Trail
Solicitation 140P2024R0155
9-12-24
1. Question: My company is registered on Sam.gov. I see there is an 8(a) set-aside, and want to make sure we qualify to bid as a prime contractor as a small business, size standard 237990, $45.0 million.
Answer: Please refer to Section K of the solicitation, 52.219-1 Small Business
Representations, Small Disadvantaged Business Concern.
2. Question: Does the 6” aggregate base have to be limestone? Can it be an alternate material like “slag” or “recycled”?
Answer: Contractors are to utilize the engineered plans and specifications found in the solicitation. Sheet C1 documents the typical sections for the trail including the required aggregate base. No alternate will be accepted at this time.
3. Question: Will NPS mark trees within the limit(s) of disturbance, or will it be up to the
Contractor’s discretion?
Answer: NPS performed an initial assessment and quantification of tree removals for the project scope, see Attachment 10 Phase One Tree Removal and accompanying 41 photos of the identified trees. This list is information only and contractor will be responsible for identifying means and methods to perform the requirements of Site Clearing (Section 31
10 00) for the project.
4. Question: Is the existing gravel being hauled off or can it be re-used in the project?
Answer: Contractor will refer to the plan and profile sheets as well as cross sections sheets (C56-C101) for the project grading. Refer to the project specifications and sheet
C1 Typical Sections for the subgrade compaction requirements. As noted, the extent of trail from Grand Blvd west to the Douglas Center parking lot has not been improved and has existing railroad ties. The trail from Grand Blvd. east to County Line Road has been improved.
5. Question: Do you know of any utilities?
Answer: Contractor shall submit a ticket for utility location to Indiana 811 before starting construction. Following notes are informational only, and it is up to the contractor to confirm. Sheets G2 and C3 depict a water line to a drinking fountain adjacent to the Douglas Center parking lot.
6. Question: Could you post the sign in sheet for this project.
Answer: Yes, this is included with Amendment One of the Solicitation.
Clarification:
1. Please review Solicitation Section L, B. Questions for procedure with questions. This process shall be followed when asking a question and the following NPS response.