B09_Att_10_Phase_One_Tree_Removal_0001.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
INDU 305176 - Marquette Greenway Trail Constructio
Solicitation number
140P2024R0155
Issued by

About this file

This document is an Excel spreadsheet detailing the trees that need to be removed as part of the Marquette Greenway Trail Construction project. The spreadsheet lists the location, quantity, diameter, and status of 77 trees along the trail. The trees are primarily located near the County Line Road, Grand Boulevard bridge, and between the Grand Boulevard and the Discovery Center. Most of the trees are less than 10 inches in diameter, with a few larger trees up to 31 inches. The spreadsheet indicates which trees are on existing trails and which are not.

The related federal contract opportunity is for the Marquette Greenway Trail Construction project, solicitation number 140P2024R0155, issued by the Department of the Interior National Park Service National Office. This appears to be the solicitation for the overall trail construction project, of which the tree removal is a component.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Traveling from East to West
Picture #LocationQuantityDiameter Near GroundNotesOn existing trail?
1, 2Closer to County Line Road131"South side of trailYes
3Closer to County Line Road17"South side of trailYes
4Closer to County Line Road119"South side of trailYes
5Eastern pull offn/aFor DSC and HDRn/a
6Western pull offn/aFor DSC and HDRn/a
7, 8Near the school117"South side of trail near benchYes
9East side of Grand Blvd bridge115"At the fenceNo
10East side of Grand Blvd bridge176" or lessScrub trees btween the fence and bridgeNo
11East side of Grand Blvd bridge28", 10"Near the bridgeNo
32East side of Grand Blvd bridge318", 18", 12"All are dead, north side of trailNo
12-18Trees along the boardwalk77", 10", 6", 10", 16", 26", 6"Trail spur down to Grand BlvdYes
19West side of Grand Blvd bridge34", 3", 5"At the bridgeNo
20West side of Grand Blvd bridge39", 11", 4"North side of trailNo
21West side of Grand Blvd bridge124"Leaning oak with dead limbs, north sideNo
22West side of Grand Blvd bridge213", 10"South side of trailNo
23Between Grand Blvd and the DC18"Leaning branch, south side of trailNo
24Between Grand Blvd and the DC25", 7"North side of trailNo
25Between Grand Blvd and the DC55", 7", 5", 5", 6"South side of trailNo
26Between Grand Blvd and the DC114"North side of trailNo
27Between Grand Blvd and the DC111"North side of trailNo
28Between Grand Blvd and the DC23", 11"North side of trailNo
29Between Grand Blvd and the DC112"Leaning tree, south side of trailNo
30, 31Between Grand Blvd and the DC28", 10"South side of trailNo
41Between Grand Blvd and the DC17"South side of trailNo
40Between Grand Blvd and the DC35", 4", 3"3 tree cluster, north side of trailNo
39East end of Nature Play Zone37", 8", 5"North side of trailNo
34 - 38North of the NPZ on the IHB75", 4", 4", 4", 6", 14", 7"Many small scrub trees in the area tooNo
33DC Parking Lot53", 3", 3", 4", 4"Trail spur to DC parking lotNo
77

File details come from the government source that posted it. Updated .