B09_Amendment_2_Questions_5-31-24_0002.pdf

PDF 414 KB Posted

Attached to
LIBI 241430 - Replace Dilapidated Visitor Center F Federal contract opportunity
Solicitation number
140P2024R0111
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains a series of questions and answers related to Solicitation Number 140P2024R0111 for the LIBI 241430 - Replace Dilapidated Visitor Facility project at Little Bighorn Battlefield National Monument. The solicitation is for the construction of a new visitor center facility, including site improvements, hazardous materials abatement, and demolition of the existing facility.

The document provides clarification on various technical aspects of the project, such as roof framing, wood shear wall construction, and communications infrastructure. It also addresses contractual requirements, including project experience, past performance submissions, and key personnel roles. Pricing and scheduling considerations are discussed, with information on lead times for certain materials. The document also includes revisions to the bid item structure and specification sections related to the roof observation deck.

View the file

Other files for this federal contract opportunity

Other files attached to LIBI 241430 - Replace Dilapidated Visitor Center F, newest first.
File Type Posted
B09_Amendment_2_SF30_5-31-24_0002.pdf PDF
Sol_140P2024R0111_Amd_0002.pdf PDF
B09_Amendment_1_Questions_5-24-24_0001.pdf PDF
B09_Amendment_1_SF30_5-24-24_0001.pdf PDF
Sol_140P2024R0111_Amd_0001.pdf PDF
B08_Attch_1_Specifications_4-30-24.pdf PDF
B08_Attch_2_Drawings_4-30-24.pdf PDF
B08_Attch_12_BaselineScheduleReviewChecklist.docx DOCX document
B11_Preproposal_Conference_Sign_In_Sheet_5-7-24_(2).pdf PDF
B08_Attch_8_Bid_Bond.pdf PDF
Sol_140P2024R0111.pdf PDF
B08_Attch_11_Construction_Contract_Administration.docx DOCX document
B08_Attch_7_Past_Perf_Quest.docx DOCX document
B08_Attch_4_HAZMAT_Rpt_1-10-23.pdf PDF
B11_PreProposal_Conf_Slides_LIBI_241430_5-7-24_Final.pptx PPTX presentation
B08_Attch_9_General_Ref.doc DOC document
B08_Attch_10_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_Attch_3_Wage_Determination_MT20240056_1-5-24.pdf PDF
B08_Attch_6_Project_Experience_Form.docx DOCX document
B08_LIBI_241430_Sol_140P2024R0111_5-7-24.pdf PDF
B08_Attch_5_Geotech_Rpt_2-8-23.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number - 1140P2024R0111 Replace Dilapidated Visitor Facility, Little Bighorn Battlefield National Monument, LIBI 241430

Question: Answer: Amendment Number:

1 Sheet S1.4, What Type/Size beams are in these two locations (pic attached)?

Grid Lines 7 & A, See Figure 1

Grid Lines 2 & E, See Figure 2

Beam types and sizes are shown on elevations A3 and A4 on sheet S2.0

2 Sheet S6.5, Detail A3, Can we use T&G Sheeting in lieu of blocking sheet edges or is blocking absolutely necessary? When using wood ‘I’ joists for the floor system, it’s really difficult to get a good connection with blocking because you only have the top cord to shoot a nail through. You will wind up solid filling the ‘I’ joist webbing, then shooting the blocking in, which will be extremely time consuming.

Detail A3/S6.5 show panel joints for wood shear walls.

This detail does not apply to the floor/roof deck. T&G does not meet structural demands. The diaphragm panel edge blocking may be turned flat against the sheathing to allow for easier installation.

3 Sheets A1.12, A2.0, A2.1, The observation area on the roof area has been removed in the updated design.

S1.5 still shows shear walls and misc. framing on the roof. I believe this page should be deleted entirely. I would believe there still is a small elevator tower on the roof for elevator equipment and clearance but nothing else. Please clarify and advise.

Sheet S1.5 is intended to be used for the Add Alternate design.

4 Sheet A1.12, The Roof Plan does not show any type of roof access. S1.4 Roof Framing Plan does not show any openings that may be considered a roof access.

Sheet S4.1, Detail B3 is referred to as Roof Access Stair Framing Plan. Please clarify and advise. I think a much simpler alternative would be a roof access ladder in Room 110 or Room 106 with an access hatch through the roof. This would be a more cost-effective

The stair framing is intended for the Add Alternate design. A-one story building does not require a roof access hatch. The roof can be accessed with a ladder or lift from the North and West side of the building.

alternative than building a big set of stairs that will only get used a dozen times a year. Thoughts?

5 Sheet S1.4, Between Grid Lines A&B and Grid Lines 5&6. This area helps create the opening for the stairs (See Figure 3, highlighted in green). What size beam is it supposed to be?

The referenced area shows the framing around the skylight above the stairs. The highlighted beam should be a 3.1/8"x12" GLB.

6 Factor 3, Project Experience, page 61. Regarding relevant projects completed in the past 7 years would you accept a project that is substantially complete (i.e., 85% or more)?

That is acceptable. 1

7 Factor 3, Project Experience, page 61. To demonstrate proof of project experience, as per FAR 15.305(a)(2)(iii)), may the ISBEE prime contractor submit relevant project experience from its other ISBEE sister businesses?

No, it must be the company submitting the proposal. 1

8 Factor 6, Past Performance, page 62. Will you accept a Past Performance Questionnaire previously completed by the client for a different proposal submission?

That is acceptable. 1

Is the park going to be closed to visitors at any point?

The park’s tour road will generally be closed during summer construction Monday-Thursday, and be open to the public Friday-Sunday. With low winter visitation, the tour road will be open all winter. Also, the cemetery adjacent to the Visitor Center will be open year-round on a “permit” basis – the entrance gate will be closed Monday-Thursday, but permitted cemetery visitors will be allowed. No construction-related traffic congestion is allowed on days where the tour road is open.

10 Are there any holidays or anniversary events where the park will need to remain open?

The park’s tour road will be open to the public on Memorial Day and on the anniversary of the Battle of the Little Bighorn, June 25 and 26 (2025 and 2026). No construction will be allowed on these dates. There will be a demolition ceremony for the Visitor Center in July 2024. It will last two days maximum, during which time no construction will be allowed. It is unlikely construction will have started on this project when the demolition ceremony takes place.

11 Factor 2, Key Personnel, page 60. Can the superintendent, if appropriately qualified, also perform either one or both Onsite Safety Specialist or Onsite Quality Control Manager roles?

The superintendent may perform as the Safety Specialist, however the QC Manager must be a stand-alone position.

12 Not all Light Fixtures meet the BAA or the DLC listing requirements in the specifications. Fixtures that do meet the specifications were not approved nor on the fixture schedule. In order to meet these requirements, different fixtures would need to be approved, and of course, there would be a cost increase.

To be answered in a future amendment. 2

13 Some of the switchgear (DISTRIBUTION PANEL “MDP) for this project currently have a 50-week lead time upon time of order.

Noted. Your schedule should reflect market conditions, be realistic and achievable. If there is a long lead item, state that specifically in your narative. However, If there is another product with a shorter lead time, but more expensive, also state that in your narative.

14 The prints reference the structured cabling as CAT 6a, however the spec documents only reference Cat 6.

Can you confirm what type of cable needs to be supplied for the project?

The cables are CAT 6A, per the drawings. The specs are incorrect.

15 There is a contradiction between the Bid Schedule that is included in the Solicitation Document 140P2024R011 versus the definition of the line items in the project specifications (Spec Section 012700) related to the costs associated with the roof deck observation area.

In the solicitation, it indicates that the roof observation deck systems would be an add alternate for the project (CLIN5), whereas in the specifications, it shows this work item as CLIN3, and would be a deduct to the project.

We just need to know which Bid Item Structure is correct so we can provide pricing as requested by the Owner.

Referenced spec section has been revised and is attached to this amendment.

16 Factor 4 Management Approach & Project Team on Page 61:

Just to confirm, the only pages subject to the five-page limit in Factor 4 Management Approach & Project Team are for No. 2 Narrative? No. 1 Organizational Chart including Roles and Responsibilities and No. 3 Letters of Commitment do not have a page count?

This is correct 2

17 Sheet ET6.1 calls out for existing fiber to a new ground box then on to the new building. Do you have a distance from the admin building to the new building?

The scope of work is to intercept the existing communications runs to the existing building with a new handhole, and then to continue to the VC from there.

The distance from the Admin Building to the Visitor Center, measured along the road, is 1,550 feet.

18 Regarding the XPS taper package for this project:

Please provide a minimum, maximum or average R-value to accurately to draw/quote this taper.

Building Envelope R value requirements are listed on Sheet G5. R-value for roof is R-49.

19 Glazing Type 'GL-4' ... Plan Pages Call Out as '1-3/16" Bird Safe Glass' Spec 88000 3.10 calls out overall thickness as 1". Please verify which thickness should be used for the curtain wall system estimate.

1-3/16" bird-safe glass overall is correct. The insulated glass is 1" thick. The bird-safe product is 6mm. The two figures added together result in the 1-3/16" overall thickness.

20 Spec. Section 01 11 00-3, 1.4, A conflicts with keynote #1 on C2.0 of the contract drawings, please clarify which note is applicable.

FHWA is responsible for the demolition of all sidewalk, curb and asphalt within the heavy dashed line shown on Sheet C1.0. See Note 1. FHWA is responsible for all rough grading in this area. FHWA contractor is responsible for installation of the electrical conduit. Visitor Center contractor is responsible for all fine-grading, asphalt, curb and concrete/sidewalk installation shown outside of heavy dashed line shown on Sheet C2.0. The Visitor Center contractor will not have access to the area within the heavy dashed line on C2.0 for use as a staging area after August 1, 2025.

21 Pertaining to Factor 6. Past Performance: Please confirm it is permissible to include original PPQs sent to references at the time of original submittal in November 2023; or if PPQs must be resent to be completed by references again and resubmitted to the Contracting Officer’s attention. Our assumption is that original PPQs are acceptable and will be considered compliant for Factor 6.

Original PPQs can be used. 2

22 Please confirm there are no restrictions to margin sizes within Volumes I and II. Our assumption is that there are no margin requirements or restrictions.

That is correct 2

23 Please confirm it is permissible to provide items such as date, company logo, proprietary statements, security markings, page numbers, etc. within the margin areas for Volumes I and II?

This is permissible 2

24 Please confirm illustrations (e.g., graphic figures, graphs, tables, call-out boxes, etc.) can be with font colors other than black and in font sizes 12, 11, 10, and/or 9 pt. font?

This is permissible 2

25 Please confirm non-narrative content (e.g., section headers, call-out boxes, etc.) within the volumes can be colors other than black and font size greater than 12 pt. font.

This is permissible 2

26 Please confirm it is acceptable to use the font Arial for body text, tables, figures, covers, headers/footers, call-out boxes and/or graphics?

This is permissible 2

27 Please confirm it is acceptable to use the font Times New Roman for body text, tables, figures, covers, headers/footers, call-out boxes and/or graphics?

This is permissible 2

28 Please confirm main body text is not restricted by font size limitations in Volumes I and II. Our assumption is that font sizes of 10, 11, and 12 point are permissible.

This is permissible 2

29 Please confirm covers, headers, and footers are not restricted by the font and size limitations.

This is permissible 2

30 Please confirm if there is a total page limit for Volume I Technical Proposal, our assumption based on requirements of the solicitation is that there are only limits to the narratives for Factor 1. Technical Approach (7 pages) and Factor 4. Management Approach & Project Team (5 pages).

This is correct. No overall page limit for Volume 1, only where specifically stated.

31 Refer to Question 5. Replace existing Sheet S1.4 with the sheet attached to this amendment. The new sheet updates roof framing between Grids C and E to match the framing on S1.4B (Bid Option 3).

32 Do you know what height the flagpole should be, or can you put me in touch with who does?

No work related to flagpole furnishing or installation is included in this project.

A B C D

S2.0

C3

E

S2.0

A4

S2.0

A3

S2.0

C1

S2.0

A1

5.1/2"x19.1/2" GLBHSS3x 3x

1/

3- 2x

2-

2x

3-2x8-K1-T1

2- 2x

6.

3/

4" x1

2" G

LB

6.

3/

4" x3

6" G

LB

5.

1/

2" x1

2" G

LB

2- 2x

6x

4- 2x

6 3-2x6 5.

1/

2" x1

2" G

LB

2- 2x

6.3/4"x9 " G

LB-K3-T2

6.

3/

4" x2

2.

1/

2" G

LB

6.

3/

4" x3

6" G

LB

W x1

3.1 /8" x1 2"

GLB

3.1/2"x12" GLB

3.

1/

2" x1

2" G

LB

3.1/8"x12" GLB

6.

3/

4" x3

6" G

LB

2- 2x

3-2x6 6.3/4"x24" GLB

2- 2x

63.

1/

8" x1

2" G

LB

6.

3/

4" x3

6" G

LB

6.

3/

4" x3

6" G

LB

6.

3/

4" x3

6" G

LB

6.

3/

4" x3

6" G

LB

6.

3/

4" x3

6" G

LB

6.

3/ 4" x3 6"

G

LB

3.1/8"x12" GLB 3.1/8"x12" GLB 3.1/8"x12" GLB 3.1/8"x12" GLB

3.1/8"x12" GLB3.1/8"x12" GLB3.1/8"x12" GLB3.1/8"x12" GLB3.1/8"x12" GLB

3.1/8"x12" GLB

6.

3/

4" x1

8" G

LB

3.1/8"x12" GLB 3.1/8"x12" GLB3.1/8"x12" GLB5.1/2"x12" GLB

3-2x6 6x

6x

6.

3/

4" x3

6" G

LB

6.

3/

4" x3

6" G

LB

3- 2x

5.

1/

2" x1

5" G

LB

3- 2x

3- 2x

8- K1

-T

LO

W

6.

3/

4" x3

6" G

LB

3.1/8"x12" GLB 4- 2x

6 6.

3/

4" x3

6" G

LB

6.

3/

4" x3

6" G

LB

6.

3/

4" x3

6" G

LB

6.

3/

4" x1

2" G

LB

6.

3/

4" x1

6.

1/

2" G

LB

6.

x6

GLC

6.75x6

GLC6.

x6

GLC

6.75x6

GLC6.

x6

GLC

4- 2x

5.1/2"x16.1/2" GLB

6.

x9

GLC

4-2x6 4-2x6

3-2x6

6.75x6

GLC

6.75x6

GLC

6.75x6

GLC 6.

x6

GLC

DOUBLE JOIST,

ALIGN W/ COL TJI BLOCKING

DOUBLE JOIST

ALIGN W/ COL

DOUBLE JOIST

ALIGN W/ COL

2-2x12, ALIGN WITH

SHEAR WALL

SOLID

BLOCKING

2-2x12, ALIGN WITH

SHEAR WALL

DOUBLE JOIST,

ALIGN WITH BEAM

TJI BLOCKING

TJI BLOCKING

PROVIDE ECC76

COLUMN CAP

M O

M E

N T

F R

A M

E B

E A

M

WD-2

W D

-2

WD-3

W D

-2

WD-2

COL ABV

COL ABV

6.

3/

4" x1

3.

1/

2" G

LB

A2

S5.5

SIM

.7

/8 " T

JI

6"

O .C

B1

S5.4

TYP

B4

S5.5

A1

S5.5

A1

S5.5

A2

S5.5

C3

S5.8

B3

S5.9

A3

S5.6

TYP @ DOUBLE

WYTHE WALL

B4

S5.9

C3

S5.8

3.

1/

8" x1

2" G

LB

B4

S5.911 .7

/8 " T

JI

6"

O .C

3x BLOCKING

5.1/8"x12" GLB 6.3/4"x22.1/2" GLB

3.1/8"x12" GLB

3.1/8"x12" GLB

6.

3/

4" x3

6" G

LB

6.75x6

GLC

6.75x6

GLC6.

x6

GLC

ROOF FRAMING PLAN NOTES

1. SEE ARCHITECTURAL FOR ROOF SLOPES AND

DRAINS.

2. SEE S5.9 FOR WOOD DIAPHRAGM SCHEDULE.

3. ALLOWABLE PENETRATIONS THROUGH TYPICAL

SOLID SAWN WOOD STRUCTURAL MEMBERS SHALL

BE PER DETAIL ANYTHING OUTSIDE THE

LIMITS OF THAT DETAIL SHALL BE SUBMITTED FOR

APPROVAL TO THE ENGINEER.

4. ROOF JOISTS TO BE 11.7/8" TJI 210 @ 24" O.C.

U.N.O.

5. CANOPY ROOF JOISTS TO BE 11.7/8" TJI 210 @ 24"

O.C. U.N.O.

/S5.6B4

WOOD WALL LEGEND

1 A 2 B

SHEATHING. SEE WOOD STUD SHEAR WALL SHEATHING SCHEDULE

HOLDOWN/STRAP. SEE SHEAR WALL STRAP/HOLDOWN SCHEDULE

OPENING STRAP. SEE OPENING STRAP SCHEDULE

END POST MEMBER. SEE END POST MEMBER SCHEDULE

HOLDOWN/STRAP LOCATION TYP

EXTENTS OF SHEAR WALL

WOOD HEADER

CALLOUT: ____-K#-T#

SEE DETAIL

NUMBER INDICATES QUANTITY OF TRIM STUDS EA. SIDE OF

OPENING. DEPTH TO MATCH WALL THICKNESS

NUMBER INDICATES QUANTITY OF KING STUDS EA. SIDE OF

OPENING. DEPTH TO MATCH WALL THICKNESS

INDICATES WOOD HEADER TO BE USED

/S5.10B2

JEROD G.

JOHNSON

No. 19480

MO N T A N A

L

IC

E N

S E

D

PROF E S S I ONA L

E N

G I

N E

E R

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.A/E FIRM TITLE OF DRAWING

OF

PMIS/PKG NO.

SHEET

DRAWING NO.

179600

241430

LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT

CONFORMANCE SET

09/21/2023

NT/RE+A

JTA/RE+A

S1.4

ROOF FRAMING PLAN -

BASE BID

JTA/RE+A

APRIL 8, 2024

AJC ARCHITECTS

SALT LAKE CITY,

UT 84104

238 254

SCALE:S1.4 1/8" = 1'-0"

A1 ROOF FRAMING PLAN - BASE BID

SEE SHEET S1.4B FOR ADD ALTERNATE INFORMATION.

MARK DATE DESCRIPTION

2 05/30/2024 RFI #01

LIBI 241430 01 27 00 - 1

DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section explains in general what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of work, include costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item Number 01: Hazardous Materials abatement for demolition of existing visitor center, demolition of existing visitor center and associated site work, construction of new visitor center.

1. This item consists of the abatement of all hazardous materials associated with the demolition of the existing visitor center, the complete demolition and hauling away of materials of the existing visitor center and the construction of the new visitor center.

2. Measurement for payment will be per the work completed in the previous month.

3. Payment will be made at the contract lump sum price (LS).

B. Contract Line Item Number 02: All site improvements (except re-grading/re-surfacing of parking area)

1. This item consists of all site improvements and associated landscaping improvements.

2. Measurement for payment will be per the work completed in the previous month.

3. Payment will be made at the contract lump sum price (LS).

C. Contract Line Item Number 03: Additive Bid Option #1 Stairs and seating surfaces at southwest side of opening in the wall at the entry.

1. This item consists of the stairs and seating area located at the southwest side of the opening in the wall at the entry.

2. Measurement for payment will be per the work completed in the previous month.

3. Payment will be made at the contract lump sum price (LS).

D. Contract Line Item Number 04: Additive Bid Option #2 Greasy Grass decorative wall panels at lower level Education Room 016

1. This item consists of the decorative wood added to the perimeter walls in room 016.

LIBI 241430 01 27 00 - 2

DEFINITION OF CONTRACT LINE ITEMS

2. Measurement for payment will be per the work completed in the previous month.

3. Payment will be made at the contract lump sum price (LS).

E. Contract Line Item Number 05: Additive Bid Option #3: ALL items associated with the public roof access and public roof viewing area @ roof including elevator going to the roof and stairs going to the roof for public access.

1. This item consists of extending the stairs and elevator to the roof, and all associated walls, covers, pavers, railings, etc. associated with the roof top viewing area.

2. Measurement for payment will be per the work completed in the previous month.

3. Payment will be made at the contract lump sum price (LS).

END OF SECTION 01 27 00