This document is an amendment to a solicitation for the GATE 308504 Hangars 3 & 4 Construction/Hazardous Materials Remediation and Early Demolition project. The solicitation was issued by the Department of the Interior National Park Service National Office, a civilian agency.
The amendment provides updates to the project scope, schedule, and other solicitation requirements. Key details include revised bid opening and award dates, as well as changes to the Statement of Work and pricing instructions. The amendment also clarifies the set-aside status for small businesses and identifies the incumbent contractor. No other significant changes to the overall project requirements or federal agency involvement are noted.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2024R0063_Amd_0003.pdf | ||
| Amendment_0003_GATE_308504_0003.pdf | ||
| Sol_140P2024R0063_Amd_0002.pdf | ||
| Amendment_0001_GATE_308504_pdf_0001.pdf | ||
| Sol_140P2024R0063_Amd_0001.pdf | ||
| 3_WD_NY20240003_dated_4_5_24.pdf | ||
| B08_140P2024R0063.pdf | ||
| 4_SF_25_-_Performance_Bond.pdf | ||
| 1_Project_Experience_Questionnaire.pdf | ||
| 6_Subcontracting_Percentage_Worksheet.pdf | ||
| 2_Past_Performance_Questionnaire.pdf | ||
| 5_SF_25A_-_Payment_Bond.pdf | ||
| Sol_140P2024R0063.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2024R0063 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
GATE 30850406/27/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/23/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
GATE 308504 - Rehabilitate Hangars 3 and 4 Gateway National Recreation - Hazardous
Materials Remediation and Early Demolition.
Please refer to page 2 for changes incorporated into this solicitation.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Linda Melnick
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation # 140P2024R0063 Amendment 0002
Description of Changes: The following Changes are hereby incorporated into and made a part of this solicitation.
1. The following sheets A2, A3, H0.1, H1.3, E2 and E5. are hereby removed in their entirety and substituted therefore with revised sheets A2, A3, H0.1, H1.3, E2 and E5.
2. Additional hangar details are provided with dimensioning for hangar and truss quantity verification.
Receipt of Bids: The hour and date for receipt of proposals remains the same: July 12, 2024, at 1300 Eastern Time.
Acknowledgement: See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).
Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
A list of questions from prospective contractors are also included with this amendment and are provided for informational purposes only. Additional questions will be addressed in a subsequent amendment. The final date for questions is July 3, 2024.
Prospective Contractor Questions and Answers
3. Since the electrical service is administered by NPS will the electricity coming into the hangars be disconnected from the feed by NPS prior to mobilization or is the contractor responsible for this disconnection?
A: The contractor will be responsible for coordinating all necessary electrical disconnections/shutdowns. See Revised Sheet E2, E5 and Question 9 in Amendment No. 02 for further details.
4. For the gas service will it be required to be shut off from the source or at the meter?
A: The contractor will be responsible for confirmation the gas is turned off from the meter.
5. Is the water service to the building off?
A: The existing water service is currently turned off.
6. Post the site walk the contractor believes that cross contamination of ACM in its failed state exists there for all material in the enclosed rooms will essentially be removed as ACM. Does the Government concur with this assumption?
A: Yes. The contractor can assume all debris in the failed areas is classified as ACM.
7. Please confirm that the remaining wall in all areas are to be “stripped” down to the stud work where possible.
A: In accordance with Note 1 on Sheet A2, All non-masonry walls are to be removed unless otherwise noted.
8. Please confirm that the area on the north side of the building can be used for temporary storage for items to be salvaged.
A: The contractor may use their staging areas for temporary storage of salvaged items.
The contractor is responsible for appropriate protections.
9. In reference to Drawing E-4, Item 1 Electrical Demolition Riser Diagram – Hangar 3 and Drawing E-5 Item 8 Existing Condition: Hangar 3, Service Disconnect Switch and Exterior Light, Please confirm service disconnect requirements.
A: The main service disconnect must remain due to existing lift station power.
Contractor shall coordinate shutoff of Hangars 3 & 4 power to complete project work while maintaining continued operation of existing lift station from same disconnect.
Contractor shall include $10,000 of electrical improvements in their bid to account for necessary coordination. Please see Revised Drawings E2 and E5 contained within this Amendment.
10. I would like to request the Project Experience Questionnaire limitation be extended from 5 years to 7 years.
A: Please follow the solicitation requirements as provided.
11. Regarding Asbestos Abatement & Lead Paint Abatement, the survey’s provide locations of samples and where hazardous materials are present but there are no quantities provided to be abated. Would the NPS provide a good faith survey so that all bidders are providing pricing for the same scope?
A: The project includes complete abatement of the identified areas. See attached drawings for hangar dimensions for quantity verification.
12. As an example for the Lead Paint, H1.3 indicates sample locations that are Lead Based Paint but then indicates all sample locations detected lead containing paint. Should all paint from all surfaces be abated?
A: Paint from all masonry and metal surfaces containing lead shall be abated with the exception of wood ceiling planks and corrugated metal exterior friezes above the exterior hangar doors in accordance with Note 3 on Sheet H0.1. Paint from non-masonry surfaces and non-metal surfaces shall be disposed of in accordance with Contract Documents.
13. Will there be an additional time for on-site investigation prior to bid?
A: Yes, there will be an additional open time for contractors to review the site on
Tuesday, July 2nd, from 10am – Noon ET. No NPS escorts will be attending.
Contractors will be allowed to review the project areas within the open hours.
14. Will the Questions and Answers cutoff be extended?
A: The new cutoff date/time for questions is Wednesday, July 3, 2024, at Noon ET.
Plan Sheet Revisions and Additional Information
See attached plan sheet revisions for sheets A2, A3, H0.1, H1.3, E2 and E5.
Revisions are noted in the clouded sections. Additional hangar details (3 sheets) are provided with dimensioning for hangar and truss quantity verification.
GENERAL NOTES
1. ALL NON-MASONRY WALLS ARE TO BE
REMOVED UNLESS OTHERWISE NOTED.
2. ALL EXISTING NPS ITEMS INCLUDING BUT NOT
LIMITED TO BOATS AND BOAT-RELATED
EQUIPMENT WITHIN HANGAR 4 WILL BE
REMOVED BY THE PARK PRIOR TO
COMMENCEMENT OF WORK. NOTIFY CO IF ANY
NPS BOAT EQUIPMENT IN HANGAR 4 IS
REMAINING.
3. UNLESS OTHERWISE NOTED, NO WORK IS
ANTICIPATED ON THE EXTERIOR ENVELOPE
INCLUDING ROOFS, WALLS, DOORS AND
WINDOWS.
4. UNLESS OTHERWISE NOTED, ALL DEBRIS,
TRASH AND EQUIPMENT IS TO BE REMOVED
FROM THE BUILDING AND PROPERLY DISCARDED
OR RECYCLED.
5. IF CONTRACTOR DISCOVERS ANY EXISTING
HISTORIC FABRIC SUCH AS A DOOR OR WINDOW
FRAME ANYWHERE ELSE IN THE BUILDING
OTHER THAN IN THE SW CORNER OF HANGAR 3
DURING DEMOLITION, NOTIFY CO.
6. IF ANY NEW HOLES ARE CREATED IN THE
ROOFS OF HANGAR 4 AND/OR THE WPA INFILL
DUE TO REMOVAL OF SYSTEMS EQUIPMENT,
HOLES ARE TO BE TEMPORARLY PATCHED WITH
PEEL AND STICK ROOFING.
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
HANGARS 3 & 4 HAZARDOUS MATERIALS
REMEDIATION AND EARLY DEMOLITION
/2
/2
:5
:3
P M
A u to d e s k D o c s /G
A T
E F lo y d
B e n n e tt F ie ld
/G A
T E
F lo y d
B e n n e tt F ie ld
.r v t
AK
CT
Checker
04/19/2024
A2
PHOTOS - DEMOLITION
A2
1 HANGAR 3 TRAILER
A2
2 HANGAR 3 BLUE PLYWOOD STRUCTURE
A2
3 HANGAR 3 FENCED AREA
REMOVE TRAILER
COORDINATE EQUIPMENT SALVAGE WITH CO
REMOVE TRAILER
REMOVE DEBRIS REMOVE
DEBRIS
A2
4 HANGAR 3 FENCED AREA AND 2X4 STRUCTURE
REMOVE FENCE.
CUT POSTS AT GRADE
REMOVE 2X4 STRUCTURE
REMOVE
DEBRIS
REMOVE
DEBRIS
A2
5 HANGAR 3 BROWN PLYWOOD SHED AND SAFE
A2
6 HANGAR 3 CONCRETE PIPES
DEMO
STRUCTURE
REMOVE DEBRIS REMOVE BARRELS
DEMO
STRUCTURE
DEMO
STRUCTURE
REMOVE DEBRISREMOVE BARRELS REMOVE DEBRIS
REMOVE FENCE.
CUT POSTS AT GRADE
REMOVE DEBRIS REMOVE DEBRIS
REMOVE FENCE.
CUT POSTS AT GRADE
DEMO
STRUCTURE
DEMO
STRUCTURE
REMOVE DEBRISDEMO SAFE REMOVE DEBRIS
REMOVE DEBRIS
12 32
ABATE LEAD
PAINT ON
EXISTING STEEL
TRUSSES
NO LEAD PAINT
ABATEMENT AT
EXISTING WOOD
ROOF DECKING
ABATE LEAD PAINT
ON EXISTING
MASONRY WALLS AND
STEEL COLUMNS
7. ABATEMENT OF LEAD PAINT IN
ARCHITECTURAL DRAWING NOTES
ARE FOR SCOPE CLARIFICATION ONLY.
FOR ADDITIONAL LEAD PAINT
ABATEMENT SCOPE, REFER TO
HAZMAT DRAWINGS AND REPORT.
NOTE "DO NOT ABATE LEAD PAINT
AT CORRUGATED METAL FRIEZES."
GENERAL NOTES
1. ALL NON-MASONRY WALLS ARE TO BE
REMOVED UNLESS OTHERWISE NOTED.
2. ALL EXISTING NPS ITEMS INCLUDING BUT NOT
LIMITED TO BOATS AND BOAT-RELATED
EQUIPMENT WITHIN HANGAR 4 WILL BE
REMOVED BY THE PARK PRIOR TO
COMMENCEMENT OF WORK. NOTIFY CO IF ANY
NPS BOAT EQUIPMENT IN HANGAR 4 IS
REMAINING.
3. UNLESS OTHERWISE NOTED, NO WORK IS
ANTICIPATED ON THE EXTERIOR ENVELOPE
INCLUDING ROOFS, WALLS, DOORS AND
WINDOWS.
4. UNLESS OTHERWISE NOTED, ALL DEBRIS,
TRASH AND EQUIPMENT IS TO BE REMOVED
FROM THE BUILDING AND PROPERLY DISCARDED
OR RECYCLED.
5. IF CONTRACTOR DISCOVERS ANY EXISTING
HISTORIC FABRIC SUCH AS A DOOR OR WINDOW
FRAME ANYWHERE ELSE IN THE BUILDING
OTHER THAN IN THE SW CORNER OF HANGAR 3
DURING DEMOLITION, NOTIFY CO.
6. IF ANY NEW HOLES ARE CREATED IN THE
ROOFS OF HANGAR 4 AND/OR THE WPA INFILL
DUE TO REMOVAL OF SYSTEMS EQUIPMENT,
HOLES ARE TO BE TEMPORARLY PATCHED WITH
PEEL AND STICK ROOFING.
A B C
A B A B
A B
A B
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
HANGARS 3 & 4 HAZARDOUS MATERIALS
REMEDIATION AND EARLY DEMOLITION
/2
/2
:5
:3
P M
A u to d e s k D o c s /G
A T
E F lo y d
B e n n e tt F ie ld
/G A
T E
F lo y d
B e n n e tt F ie ld
.r v t
AK
CT
AK
04/19/2024
A3
PHOTOS - DEMOLITION
MATERIALS TO BE SALVAGED TO INCLUDE ALUMINUM HANGAR DOORS, STEEL
WINDOW FRAMES, BRICKS, WIREGLASS PANELS, AND PAVERS. COORDINATE
STORAGE LOCATIONS OF SALVAGED MATERIALS WITHIN HANGAR 4 WITH CO.
A3
1 HANGAR 3 CONSTRUCTION MATERIALS
A3
2 WPA INFILL BOILER ROOM
ABATE AND PROTECT IN
PLACE. SEE MECHANICAL
DRAWINGS FOR ASSOCIATED
PIPING TO REMAIN.
REMOVE BOILER REMOVE BOILER PROTECT IN PLACE REMOVE BOILER
REMOVE BARREL, REMOVE
DEBRIS, FURNITURE, ETC.
SALVAGE
EXISTING SIGN
AND RETURN
TO CO.
A3
3 HANGAR 3 & 4 TYPICAL CONDITIONS
A3
4 WPA INFILL TYPICAL CONDITIONS
A3
5 WPA INFILL TYPICAL CONDITIONS - MEZZANINE
A3
6 HANGAR 3 INFILL TYPICAL CONDITIONS
A3
7 HANGAR 4 INFILL TYPICAL CONDITIONS
REMOVE WOOD STRUCTURE AND STAIR REMOVE DEBRIS
REMOVE DEBRIS
REMOVE DEBRIS
13 32
RELOCATE EXIST SHIPPING CONTAINER
FROM HANGAR 4 TO PLAN EAST EXTERIOR
OF THE BUILDING.
ABATE LEAD PAINT
ON EXISTING
MASONRY WALLS
AND STEEL
COLUMNS
ABATE LEAD
PAINT ON
EXISTING
STEEL
TRUSSES
NO LEAD PAINT
ABATEMENT AT
EXISTING WOOD
ROOF DECKING
ABATE LEAD PAINT
AT EXISTING STEEL
TRUSSES AND
CONCRETE ROOF
DECK
7. ABATEMENT OF LEAD
PAINT IN
ARCHITECTURAL
DRAWING NOTES ARE
FOR SCOPE
CLARIFICATION ONLY.
FOR ADDITIONAL LEAD
PAINT ABATEMENT
SCOPE, REFER TO
HAZMAT DRAWINGS AND
REPORT.
mwmoore Polygon
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
HANGARS 3 & 4 HAZARDOUS MATERIALS
REMEDIATION AND EARLY DEMOLITION
/2
/2
:2
:4
P
M A u to d e s k D o c s /G
A T
E F lo y d B e n n e tt F ie ld
/N P
S G a te
F lo y d B e n n e tt F ie ld
-G H
D .r v t
DAZ
LDB
CCW
04/19/2024
H0.1
GENERAL NOTES, SYMBOLS
AND ABBREVIATIONS
3 32
GENERAL NOTES
1. A HAZARDOUS MATERIALS INSPECTION WAS PERFORMED. THE
SURVEY/INSPECTION REPORT IS ATTACHED TO THE SPECIFICATION AS
APPENDIX A FOR INFORMATION. THE WORK WILL REQUIRE THE REMOVAL
OF ASBESTOS CONTAINING MATERIALS AS INDICATED. DESTRUCTIVE
ACTIVITIES SUCH AS BREAKING INTO WALLS, CEILINGS, AND FLOORS WERE
NOT PERFORMED IN ORDER TO LOCATE MATERIALS. THEREFORE, IF DURING
THE WORK SUSPECT MATERIALS ARE UNCOVERED, STOP WORK AND
NOTIFY THE CO. DRAWINGS, SPECIFICATIONS, AND REPORT ARE PROVIDED
FOR INFORMATION ONLY. ASSESS HAZARDOUS CONDITIONS PRIOR TO
START OF CONSTRUCTION AND COLLECT WASTE CHARACTERIZATION
SAMPLES PRIOR TO DISPOSAL.
2. CONTACT THE NATIONAL PARK SERVICE (NPS) OFFICE PRIOR TO
BEGINNING THE PAINT ABATEMENT ACTIVITIES IN ARCHITECTURAL
DRAWINGS. COORDINATE WITH NPS TO SET UP AN ACCUMULATION AREA
FOR THE REMOVED PAINT WHICH TESTED HAZARDOUS. LABEL THE
CONTAINER CONTENTS AND START DATE OF ACCUMULATION. NPS MUST
PRE-APPROVE THE DISPOSAL FACILITY AND SIGN THE MANIFEST PRIOR TO
OFF-SITE DISPOSAL. PROVIDE NPS A COPY OF THE SIGNED MANIFEST
FROM THE DISPOSAL FACILITY. CONTACT THE NPS OFFICE PRIOR TO
BEGINNING THE ACM REMOVAL ACTIVITIES. SET UP AN ACCUMULATION
AREA FOR THE REMOVED ACM. NPS MUST PRE-APPROVE THE DISPOSAL
FACILITY AND SIGN THE MANIFEST PRIOR TO THE OFF-SITE DISPOSAL.
PROVIDE NPS A COPY OF THE SIGNED MANIFEST FROM THE DISPOSAL
FACILITY.
3. EXISTING PAINT HAS BEEN DETERMINED TO CONTAIN LEAD, AT
CONCENTRATIONS ABOVE THE LABORATORY'S DETECTION LIMIT. REVIEW
ENVIRONMENTAL HAZARDOUS MATERIALS REPORT FOR LEAD BASED PAINT
INFORMATION. PERFORM RENOVATION/DEMOLITION WORK IN ACCORDANCE
WITH SPECIFICATION SECTION 02 83 00 "LEAD REMEDIATION".
CONSTRUCTION STANDARDS DEVELOPED BY OSHA FOR AND LEAD ARE;
LEAD, 29 CFR 1926.62. REFER TO SPECIFICATION SECTION 02 83 33
FOR ADDITIONAL INFORMATION ON CLEANING AND PAINT REMOVAL ON
EQUIPMENT, PIPING AND CONDUIT. ALL LEAD PAINT THAT IS ON EXISTING
ITEMS TO REMAIN ARE TO BE ABATED. ALL ITEMS CONTAINING LEAD-
BASED PAINT THAT ARE NOTED TO BE REMOVED SHALL BE DISPOSED OF
PROPERLY ACCORDING TO THE SPECIFICATIONS. REFER TO HAZMAT
REPORT AND DRAWINGS FOR ITEMS AND LOCATIONS. CERTAIN ITEMS
SUCH AS THE WOOD CEILING PLANKS AND THE CORRUGATED METAL
EXTERIOR FRIEZES ABOVE THE HANGAR DOORS TESTED FOR LEAD PAINT
ARE NOT TO BE DEMOLISHED OR ABATED DURING THIS PHASE.
MATCHLINE
ENVIRONMENTAL SAMPLE
REMOVAL NOTE INDICATOR
ABBREVIATION
CMU
CONC
EV
EQUIP
FT
LF
NTS
RM
STR
TYP
UNO
DESCRIPTION
CONCRETE MASONRY UNIT
CONCRETE
ENVIRONMENTAL
EQUIPMENT
FEET
LINEAR FEET
NOT TO SCALE
ROOM
STAIR
TYPICAL
UNLESS NOTED OTHERWISE
ABBREVIATIONS
SYMBOLS LIST
4. PROVIDE AIR EXPOSURE MONITORING TO MONITOR FOR CHROMIUM, CADMIUM, AND
LEAD IN ACCORDANCE WITH GUIDANCE PROVIDED IN SPECIFICATION SECTION 02
83 33 - LEAD REMEDIATION.
5. REMOVE IDENTIFIED ASBESTOS IN ACCORDANCE WITH GUIDANCE PROVIDED IN
SPECIFICATION SECTION 02 82 13 - ASBESTOS REMEDIATION.
6. IF PAINTED METAL COMPONENTS THAT TESTED POSITIVE FOR LEAD ARE TO BE
REMOVED FROM THE SITE, THE CONTRACTOR MAY SEND THE METAL COMPONENTS
FOR OFF-SITE RECYCLING. PAINT MUST REMAIN INTACT DURING REMOVAL AND
TRANSPORTATION. REVIEW ENVIRONMENTAL HAZARDOUS MATERIALS REPORT FOR
LEAD BASED PAINT INFORMATION.
7. DOORS MARKED TO REMAIN IN PLACE OR SALVAGE ON AD-101 TO BE ABATED
FOR LEAD PAINT. ASSUME FIRE RATED DOORS CONTAIN ASBESTOS. FOLLOWING
INSPECTION, NON-ASBESTOS FIRE DOORS CAN BE DISPOSED OF AS REGULAR
CONSTRUCTION WASTE IF NOT MARKED TO REMAIN IN PLACE OR SALVAGE ON
AD-101.
8. LIGHT BALLAST HAVE BEEN INSPECTED. NO INDICATION IS PROVIDED IF PCB
FLUIDS ARE PRESENT IN BALLAST. BASED ON AGE OF HANGAR BALLAST SHOULD
BE TREATED AS PCB CONTAINING UNLESS TESTING DETERMINES OTHERWISE.
9. INCORPORATE POTENTIAL EXPOSURE TO BIRD DROPPINGS AND MOLD INTO HEALTH
AND SAFETY PLAN.
10. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH STATE OF NEW YORK
STANDARDS.
ABBREVIATION
ACM
PC
PCB
DESCRIPTION
ASBESTOS
PAINT CHIP
POLYCHLORINATED BIPHENYL
SAMPLE DESCRIPTION
H3.1
PC-03
PC-04
PC-06
PC-07
PC-05
PC-08
PC-01
PC-04
PC-09
PC-13
PC-12
PC-10
PC-11
PC-16PC-15
PC-27
PC-26
PC-14
PC-18
PC-17
PC-21
P C
-2
PC-19
PC-35
PC-36
PC-34
HANGER 4
HANGAR 3
SHOOTING RANGE
BOILER ROOM
004A
HANGER 4 ADMIN
003A
HANGAR 3 ADMIN
H3.1
H3.1
H3.1
H3.2
PC-11 - 3.13.24 PC-10 - 3.13.24
PC-07 - 3.13.24
PC-08 - 3.13.24
PC-09 - 3.13.24
PC-04 - 3.13.24
PC-05 - 3.13.24
PC-06 - 3.13.24 PC-33
PC-32
PC-31
PC-30
PC-29
PC-28
PC-25
PC-02
PC-23
PC-24 PC-22
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
HANGARS 3 & 4 HAZARDOUS MATERIALS
REMEDIATION AND EARLY DEMOLITION
/2
/2
:2
:5
P
M A u to d e s k D o c s /G
A T
E F lo y d B e n n e tt F ie ld
/N P
S G a te
F lo y d B e n n e tt F ie ld
-G H
D .r v t
DAZ
LDB
CCW
04/19/2024
H1.3
LEVEL 01 PC SAMPLE
LOCATION -
ENVIRONMENTAL
6 32
REFERRED FROM:1/16" = 1'-0"H1.3 H3.1
1 LEVEL 01 PC SAMPLE LOCATION - ENVIRONMENTAL
REFERRED FROM:1/16" = 1'-0"H1.3 H3.1
2 LEVEL 01M PC SAMPLE LOCATION - ENVIRONMENTAL
1. LEAD BASED PAINT WAS DETECTED AT THE FOLLOWING
PAINT SAMPLE LOCATIONS:
- PC 01, 03, 04, 06, 09, 10, 11, 12, 13, 17
THROUGH 27, 29, 30, 32, 34, 35, AND 36,
PC-04 - 3.14.24, PC-05 - 3.14.24, PC-08
3.14.24, PC-09 3.14.24, PC-10 3.14.24
LEAD CONTAINING PAINT WAS DETECTED IN ALL
SAMPLE LOCATIONS
SHEET NOTES
#### - Concentrations presented in bold and red were detected above TCLP and LBP screening criteria (0.5% by weight).
Notes:
PC-11 - 3.13.24 Blue/Grey paint - Double doors from Hangar 4 to Shooting range 0.24
PC-10 - 3.13.24 Blue/Grey paint - Double doors from Hangar 3 to Shooting range 0.73
PC-09 - 3.13.24 Green paint - Boiler Pumps 5.7
PC-08 - 3.13.24 Grey/Silver paint - Boiler Door 0.93
PC-07 - 3.13.24 Black paint - Boiler Door 0.26
PC-06 - 3.13.24 Blue and green paint - Hangar 3 Catwalk 0.44
PC-05 - 3.13.24 Blue and green paint - Hangar 3 Trusses 12
PC-04 - 3.13.24 Blue and green paint - Hangar 3 Catwalk 1.8
PC-03 - 3.13.24 Orange and black paint - Above Hangar 3 Doors 6.4
PC-02 - 3.13.24 Cream paint - NYC Sign Above Hangar 4 Doors 9.7
PC-01 - 3.13.24 Orange and black paint - Above Hangar 4 Doors 4.8
PC-36 Light gray paint - Boiler room - east 21
PC-35 Black paint - Boiler room - south 0.62
PC-34 Dark gray paint - Boiler room - south 2
PC-33 Light blue paint - Hangar 3 admin - south 0.032
PC-32 Dark blue paint - Hangar 3 admin - south 0.82
PC-31 Crème paint - Hangar 3 admin - center 0.26
PC-30 Dark green paint - Hangar 3 admin - center 4.7
PC-29 Light blue paint - Hangar 3 admin - center hallway 5.8
PC-28 Crème paint - Hangar 3 admin - north wall 0.054
PC-27 White paint - Hangar 3 - west wall 37
PC-26 Gray paint - Hangar 3 - west wall 23
PC-25 Light blue paint - Hangar 3 - east wall 2.5
PC-24 Light green paint - Shooting range - 2nd floor bathroom stalls 6.7
PC-23 Black paint - Shooting range - 2nd floor structural beams 11
PC-22 Dark gray paint - Shooting range - 2nd floor bathroom door 4
PC-21 Dark brown paint - Shooting range - south wall 0.74
PC-20 Crème paint - Shooting range - south wall 1.3
PC-19 Yellow paint - Shooting range - south wall 0.83
PC-18 Dark green paint - Shooting range, west wall 5.2
PC-17 Crème paint - Shooting range - west wall 0.84
PC-16 Gray paint - Shooting range - north wall 0.3
PC-15 Yellow paint - Shooting range - north wall 0.32
PC-14 Dark blue paint - Hangar 4 - east wall 0.22
PC-13 Crème paint - Hangar 4 - west wall 31
PC-12 Pink paint - Hangar 4 - west wall 4
PC-11 Dark blue paint - Hangar 4 - west door 1.9
PC-10 Light blue paint - Hangar 4 - west wall 1.7
PC-09 Green paint - Hangar 4 admin - plaster 12
PC-08 Light blue/light green paint - Hangar 4 admin - center hallway 0.12
PC-07 Dark gray paint - Hangar 4 admin - center cabinet 0.2
PC-06 Light blue paint - Hangar 4 admin - north 7.1
PC-05 Crème paint - Hangar 4 admin - center 0.29
PC-04 Light green paint - Hangar 4 admin - center 0.85
PC-03 Dark blue paint - Hangar 4 admin - center door frame 5.2
PC-02 Green paint - Hangar 4 admin - center 0.32
PC-01 Light blue paint - Hangar 4 admin - west 0.53
Sample ID Sample Description Lead Concentration (% wt)
KITCHEN
SHOWER
STORAGE
OFFICE
RR
OFFICE AREA
LOUNGE
TOILET
OFFICE
CLASSROOM
STORAGE STORAGE
STORAGE
HANGER 3
MDP-A
ELECTRICAL
BP-3A
BP-3B
BP-3C
BP-3D
BP-3E
<O
O>
O>
<O
<O
O>
STRIP LIGHT
LIGHT
FIXTURE
(TYP.)
SCALE OF FEET
0'8' 8' 16'
SCALE A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
HANGARS 3 & 4 HAZARDOUS MATERIALS
REMEDIATION AND EARLY DEMOLITION
KEY PLAN
HANGER 3
SEAL
/1
/2
:1
:0
P M
C A u to d e s k \R e v it
L o c a l C o p y \2
-0 l_
D e m o lit io n M o d e l_ d th a m m a ia h .r v t
DAT
DAT
WJR
04/19/2024
E2
ELECTRICAL DEMOLITION
FLOOR PLAN - ENLARGED -
HANGAR 3
SCALE AE2
1 ELECTRICAL DEMOLITION FLOOR PLAN - ENLARGED - HANGAR 3
UNLESS OTHERWISE NOTED, CONTRACTOR
TO DEMOLISH ALL EXISTING ELECTRICAL
DEVICES, SYSTEMS, EQUIPMENT, CONDUITS,
WIRING AND BOXES SHOWN OR NOT SHOWN
ON PLANS THROUGHOUT THE AREA OF
WORK INCLUDING BUT NOT LIMITED TO
LIGHTING FIXTURES, FIRE ALARM DEVICES,
SWITCHES, RECEPTACLES, WIRING DEVICES,
CLOCK OUTLETS, SOUND SYSTEM,
INTERCOM, SECURITY SYSTEM DEVICES,
MOTORS AND MISCELLANEOUS EQUIPMENT.
REMOVE ALL ASSOCIATED WIRING AND
CONDUIT BACK TO SOURCE OF SUPPLY. CUT
BACK, CAP AND ABANDON ALL CONCEALED
EXISTING CONDUITS WHICH ARE LOCATED IN
CONCRETE WALL OR CEILING/FLOOR SLAB.
REMOVE ALL WIRING FROM ANY ABANDONED
CONDUITS BACK TO THE SOURCE OF
SUPPLY.
REFER TO DRAWING E5 FOR EXISTING
CONDITION PHOTOS.
THE MAIN SERVICE DISCONNECT MUST
REMAIN DUE TO EXISTING LIFT STATION
POWER. CONTRACTOR SHALL COORDINATE
SHUTOFF OF HANGARS 3 & 4 POWER TO
COMPLETE PROJECT WORK WHILE
MAINTAINING CONTINUED OPERATION OF
EXISTING LIFT STATION FROM SAME
DISCONNECT. CONTRACTOR SHALL
INCLUDE $10,000 OF ELECTRICAL
IMPROVEMENTS IN THEIR BID TO ACCOUNT
FOR NECESSARY COORDINATION.
TO RYAN BUILDING MAIN ELECTRICAL ROOM
LOCATED NORTHWEST OF THE BUILDING
APPROXIMATELY 1500 FEET.
SHEET KEYED NOTES:#
6 5 4 3
NO. REVISION DATE BY
04/19/2024 mwmoore Polygon
EXISTING CONDITION : HANGAR 4
EXTERIOR LIGHTING FIXTURES
EXISTING CONDITION : HANGAR 3
MAIN ELECTRICL DISTRUBUTION SYSTEM
EXISTING CONDITION : HANGAR 3
BRANCH PANELBOARD
EXISTING CONDITION : HANGAR 3
HIGH BAY PENDANT LIGHT FIXTURE
EXISTING CONDITION : HANGAR 3
BRANCH PANELBOARD
2a 3 4 5
EXISTING CONDITION : HANGAR 3
TELECOM
EXISTING CONDITION : HANGAR 3
SERVICE DICONNECT SWITH AND EXTERIOR LIGHT
DRAWING NOTES:
1. PHOTOS ARE PROVIDED FOR SUPPLEMETARY INFORMATION, NOT ALL THE EXISTING CONDITION ARE SHOWN.
2. COLOR PHOTOS ARE BEST VIEWED IN ELECTRONIC FORMAT.
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
HANGARS 3 & 4 HAZARDOUS MATERIALS
REMEDIATION AND EARLY DEMOLITION
SEAL
/1
/2
:1
:2
P M
C A u to d e s k \R e v it
L o c a l C o p y \2
-0 l_
D e m o lit io n M o d e l_ d th a m m a ia h .r v t
DAT
DAT
WJR
04/19/2024
E5
ELECTRICAL EXISTING
CONDITION
NO. REVISION DATE BY
04/19/2024
MKutch Text Box Existing panel to remain. Operation of existing lift station is fed from this panel. Contractor shall coordinate shutoff of Hanger 3 & 4 power with operational necessity for existing lift station power. Contractor shall include $10,000 of electrical improvements in their bid.
| Amendment No. 02 - Sht Revisions A2, A3, H0.1, H1.3, E5 and Hangar Dims.pdf |
| Sheets |
| A2 - PHOTOS - DEMOLITION |
| A3 - PHOTOS - DEMOLITION |
File details come from the government source that posted it. Updated .