This document is an amendment to a solicitation for the GATE 308504 Hangars 3 & 4 Construction/Hazardous Materials Remediation and Early Demolition project. The solicitation was issued by the Department of the Interior National Park Service National Office, a civilian agency.

The amendment provides updates to the project scope, schedule, and other solicitation requirements. Key details include revised bid opening and award dates, as well as changes to the Statement of Work and pricing instructions. The amendment also clarifies the set-aside status for small businesses and identifies the incumbent contractor. No other significant changes to the overall project requirements or federal agency involvement are noted.

View the file

Other files for this federal contract opportunity

Other files attached to GATE 308504 Hangars 3 & 4 Construction/ HazMat Dem, newest first.
File Type Posted
Sol_140P2024R0063_Amd_0003.pdf PDF
Amendment_0003_GATE_308504_0003.pdf PDF
Sol_140P2024R0063_Amd_0002.pdf PDF
Amendment_0001_GATE_308504_pdf_0001.pdf PDF
Sol_140P2024R0063_Amd_0001.pdf PDF
3_WD_NY20240003_dated_4_5_24.pdf PDF
B08_140P2024R0063.pdf PDF
4_SF_25_-_Performance_Bond.pdf PDF
1_Project_Experience_Questionnaire.pdf PDF
6_Subcontracting_Percentage_Worksheet.pdf PDF
2_Past_Performance_Questionnaire.pdf PDF
5_SF_25A_-_Payment_Bond.pdf PDF
Sol_140P2024R0063.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0063 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

GATE 30850406/27/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/23/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

GATE 308504 - Rehabilitate Hangars 3 and 4 Gateway National Recreation - Hazardous

Materials Remediation and Early Demolition.

Please refer to page 2 for changes incorporated into this solicitation.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Linda Melnick

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation # 140P2024R0063 Amendment 0002

Description of Changes: The following Changes are hereby incorporated into and made a part of this solicitation.

1. The following sheets A2, A3, H0.1, H1.3, E2 and E5. are hereby removed in their entirety and substituted therefore with revised sheets A2, A3, H0.1, H1.3, E2 and E5.

2. Additional hangar details are provided with dimensioning for hangar and truss quantity verification.

Receipt of Bids: The hour and date for receipt of proposals remains the same: July 12, 2024, at 1300 Eastern Time.

Acknowledgement: See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).

Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.

A list of questions from prospective contractors are also included with this amendment and are provided for informational purposes only. Additional questions will be addressed in a subsequent amendment. The final date for questions is July 3, 2024.

Prospective Contractor Questions and Answers

3. Since the electrical service is administered by NPS will the electricity coming into the hangars be disconnected from the feed by NPS prior to mobilization or is the contractor responsible for this disconnection?

A: The contractor will be responsible for coordinating all necessary electrical disconnections/shutdowns. See Revised Sheet E2, E5 and Question 9 in Amendment No. 02 for further details.

4. For the gas service will it be required to be shut off from the source or at the meter?

A: The contractor will be responsible for confirmation the gas is turned off from the meter.

5. Is the water service to the building off?

A: The existing water service is currently turned off.

6. Post the site walk the contractor believes that cross contamination of ACM in its failed state exists there for all material in the enclosed rooms will essentially be removed as ACM. Does the Government concur with this assumption?

A: Yes. The contractor can assume all debris in the failed areas is classified as ACM.

7. Please confirm that the remaining wall in all areas are to be “stripped” down to the stud work where possible.

A: In accordance with Note 1 on Sheet A2, All non-masonry walls are to be removed unless otherwise noted.

8. Please confirm that the area on the north side of the building can be used for temporary storage for items to be salvaged.

A: The contractor may use their staging areas for temporary storage of salvaged items.

The contractor is responsible for appropriate protections.

9. In reference to Drawing E-4, Item 1 Electrical Demolition Riser Diagram – Hangar 3 and Drawing E-5 Item 8 Existing Condition: Hangar 3, Service Disconnect Switch and Exterior Light, Please confirm service disconnect requirements.

A: The main service disconnect must remain due to existing lift station power.

Contractor shall coordinate shutoff of Hangars 3 & 4 power to complete project work while maintaining continued operation of existing lift station from same disconnect.

Contractor shall include $10,000 of electrical improvements in their bid to account for necessary coordination. Please see Revised Drawings E2 and E5 contained within this Amendment.

10. I would like to request the Project Experience Questionnaire limitation be extended from 5 years to 7 years.

A: Please follow the solicitation requirements as provided.

11. Regarding Asbestos Abatement & Lead Paint Abatement, the survey’s provide locations of samples and where hazardous materials are present but there are no quantities provided to be abated. Would the NPS provide a good faith survey so that all bidders are providing pricing for the same scope?

A: The project includes complete abatement of the identified areas. See attached drawings for hangar dimensions for quantity verification.

12. As an example for the Lead Paint, H1.3 indicates sample locations that are Lead Based Paint but then indicates all sample locations detected lead containing paint. Should all paint from all surfaces be abated?

A: Paint from all masonry and metal surfaces containing lead shall be abated with the exception of wood ceiling planks and corrugated metal exterior friezes above the exterior hangar doors in accordance with Note 3 on Sheet H0.1. Paint from non-masonry surfaces and non-metal surfaces shall be disposed of in accordance with Contract Documents.

13. Will there be an additional time for on-site investigation prior to bid?

A: Yes, there will be an additional open time for contractors to review the site on

Tuesday, July 2nd, from 10am – Noon ET. No NPS escorts will be attending.

Contractors will be allowed to review the project areas within the open hours.

14. Will the Questions and Answers cutoff be extended?

A: The new cutoff date/time for questions is Wednesday, July 3, 2024, at Noon ET.

Plan Sheet Revisions and Additional Information

See attached plan sheet revisions for sheets A2, A3, H0.1, H1.3, E2 and E5.

Revisions are noted in the clouded sections. Additional hangar details (3 sheets) are provided with dimensioning for hangar and truss quantity verification.

GENERAL NOTES

1. ALL NON-MASONRY WALLS ARE TO BE

REMOVED UNLESS OTHERWISE NOTED.

2. ALL EXISTING NPS ITEMS INCLUDING BUT NOT

LIMITED TO BOATS AND BOAT-RELATED

EQUIPMENT WITHIN HANGAR 4 WILL BE

REMOVED BY THE PARK PRIOR TO

COMMENCEMENT OF WORK. NOTIFY CO IF ANY

NPS BOAT EQUIPMENT IN HANGAR 4 IS

REMAINING.

3. UNLESS OTHERWISE NOTED, NO WORK IS

ANTICIPATED ON THE EXTERIOR ENVELOPE

INCLUDING ROOFS, WALLS, DOORS AND

WINDOWS.

4. UNLESS OTHERWISE NOTED, ALL DEBRIS,

TRASH AND EQUIPMENT IS TO BE REMOVED

FROM THE BUILDING AND PROPERLY DISCARDED

OR RECYCLED.

5. IF CONTRACTOR DISCOVERS ANY EXISTING

HISTORIC FABRIC SUCH AS A DOOR OR WINDOW

FRAME ANYWHERE ELSE IN THE BUILDING

OTHER THAN IN THE SW CORNER OF HANGAR 3

DURING DEMOLITION, NOTIFY CO.

6. IF ANY NEW HOLES ARE CREATED IN THE

ROOFS OF HANGAR 4 AND/OR THE WPA INFILL

DUE TO REMOVAL OF SYSTEMS EQUIPMENT,

HOLES ARE TO BE TEMPORARLY PATCHED WITH

PEEL AND STICK ROOFING.

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

190066

GATE 308504

HANGARS 3 & 4 HAZARDOUS MATERIALS

REMEDIATION AND EARLY DEMOLITION

/2

/2

:5

:3

P M

A u to d e s k D o c s /G

A T

E F lo y d

B e n n e tt F ie ld

/G A

T E

F lo y d

B e n n e tt F ie ld

.r v t

AK

CT

Checker

04/19/2024

A2

PHOTOS - DEMOLITION

A2

1 HANGAR 3 TRAILER

A2

2 HANGAR 3 BLUE PLYWOOD STRUCTURE

A2

3 HANGAR 3 FENCED AREA

REMOVE TRAILER

COORDINATE EQUIPMENT SALVAGE WITH CO

REMOVE TRAILER

REMOVE DEBRIS REMOVE

DEBRIS

A2

4 HANGAR 3 FENCED AREA AND 2X4 STRUCTURE

REMOVE FENCE.

CUT POSTS AT GRADE

REMOVE 2X4 STRUCTURE

REMOVE

DEBRIS

REMOVE

DEBRIS

A2

5 HANGAR 3 BROWN PLYWOOD SHED AND SAFE

A2

6 HANGAR 3 CONCRETE PIPES

DEMO

STRUCTURE

REMOVE DEBRIS REMOVE BARRELS

DEMO

STRUCTURE

DEMO

STRUCTURE

REMOVE DEBRISREMOVE BARRELS REMOVE DEBRIS

REMOVE FENCE.

CUT POSTS AT GRADE

REMOVE DEBRIS REMOVE DEBRIS

REMOVE FENCE.

CUT POSTS AT GRADE

DEMO

STRUCTURE

DEMO

STRUCTURE

REMOVE DEBRISDEMO SAFE REMOVE DEBRIS

REMOVE DEBRIS

12 32

ABATE LEAD

PAINT ON

EXISTING STEEL

TRUSSES

NO LEAD PAINT

ABATEMENT AT

EXISTING WOOD

ROOF DECKING

ABATE LEAD PAINT

ON EXISTING

MASONRY WALLS AND

STEEL COLUMNS

7. ABATEMENT OF LEAD PAINT IN

ARCHITECTURAL DRAWING NOTES

ARE FOR SCOPE CLARIFICATION ONLY.

FOR ADDITIONAL LEAD PAINT

ABATEMENT SCOPE, REFER TO

HAZMAT DRAWINGS AND REPORT.

NOTE "DO NOT ABATE LEAD PAINT

AT CORRUGATED METAL FRIEZES."

GENERAL NOTES

1. ALL NON-MASONRY WALLS ARE TO BE

REMOVED UNLESS OTHERWISE NOTED.

2. ALL EXISTING NPS ITEMS INCLUDING BUT NOT

LIMITED TO BOATS AND BOAT-RELATED

EQUIPMENT WITHIN HANGAR 4 WILL BE

REMOVED BY THE PARK PRIOR TO

COMMENCEMENT OF WORK. NOTIFY CO IF ANY

NPS BOAT EQUIPMENT IN HANGAR 4 IS

REMAINING.

3. UNLESS OTHERWISE NOTED, NO WORK IS

ANTICIPATED ON THE EXTERIOR ENVELOPE

INCLUDING ROOFS, WALLS, DOORS AND

WINDOWS.

4. UNLESS OTHERWISE NOTED, ALL DEBRIS,

TRASH AND EQUIPMENT IS TO BE REMOVED

FROM THE BUILDING AND PROPERLY DISCARDED

OR RECYCLED.

5. IF CONTRACTOR DISCOVERS ANY EXISTING

HISTORIC FABRIC SUCH AS A DOOR OR WINDOW

FRAME ANYWHERE ELSE IN THE BUILDING

OTHER THAN IN THE SW CORNER OF HANGAR 3

DURING DEMOLITION, NOTIFY CO.

6. IF ANY NEW HOLES ARE CREATED IN THE

ROOFS OF HANGAR 4 AND/OR THE WPA INFILL

DUE TO REMOVAL OF SYSTEMS EQUIPMENT,

HOLES ARE TO BE TEMPORARLY PATCHED WITH

PEEL AND STICK ROOFING.

A B C

A B A B

A B

A B

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

190066

GATE 308504

HANGARS 3 & 4 HAZARDOUS MATERIALS

REMEDIATION AND EARLY DEMOLITION

/2

/2

:5

:3

P M

A u to d e s k D o c s /G

A T

E F lo y d

B e n n e tt F ie ld

/G A

T E

F lo y d

B e n n e tt F ie ld

.r v t

AK

CT

AK

04/19/2024

A3

PHOTOS - DEMOLITION

MATERIALS TO BE SALVAGED TO INCLUDE ALUMINUM HANGAR DOORS, STEEL

WINDOW FRAMES, BRICKS, WIREGLASS PANELS, AND PAVERS. COORDINATE

STORAGE LOCATIONS OF SALVAGED MATERIALS WITHIN HANGAR 4 WITH CO.

A3

1 HANGAR 3 CONSTRUCTION MATERIALS

A3

2 WPA INFILL BOILER ROOM

ABATE AND PROTECT IN

PLACE. SEE MECHANICAL

DRAWINGS FOR ASSOCIATED

PIPING TO REMAIN.

REMOVE BOILER REMOVE BOILER PROTECT IN PLACE REMOVE BOILER

REMOVE BARREL, REMOVE

DEBRIS, FURNITURE, ETC.

SALVAGE

EXISTING SIGN

AND RETURN

TO CO.

A3

3 HANGAR 3 & 4 TYPICAL CONDITIONS

A3

4 WPA INFILL TYPICAL CONDITIONS

A3

5 WPA INFILL TYPICAL CONDITIONS - MEZZANINE

A3

6 HANGAR 3 INFILL TYPICAL CONDITIONS

A3

7 HANGAR 4 INFILL TYPICAL CONDITIONS

REMOVE WOOD STRUCTURE AND STAIR REMOVE DEBRIS

REMOVE DEBRIS

REMOVE DEBRIS

13 32

RELOCATE EXIST SHIPPING CONTAINER

FROM HANGAR 4 TO PLAN EAST EXTERIOR

OF THE BUILDING.

ABATE LEAD PAINT

ON EXISTING

MASONRY WALLS

AND STEEL

COLUMNS

ABATE LEAD

PAINT ON

EXISTING

STEEL

TRUSSES

NO LEAD PAINT

ABATEMENT AT

EXISTING WOOD

ROOF DECKING

ABATE LEAD PAINT

AT EXISTING STEEL

TRUSSES AND

CONCRETE ROOF

DECK

7. ABATEMENT OF LEAD

PAINT IN

ARCHITECTURAL

DRAWING NOTES ARE

FOR SCOPE

CLARIFICATION ONLY.

FOR ADDITIONAL LEAD

PAINT ABATEMENT

SCOPE, REFER TO

HAZMAT DRAWINGS AND

REPORT.

mwmoore Polygon

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

190066

GATE 308504

HANGARS 3 & 4 HAZARDOUS MATERIALS

REMEDIATION AND EARLY DEMOLITION

/2

/2

:2

:4

P

M A u to d e s k D o c s /G

A T

E F lo y d B e n n e tt F ie ld

/N P

S G a te

F lo y d B e n n e tt F ie ld

-G H

D .r v t

DAZ

LDB

CCW

04/19/2024

H0.1

GENERAL NOTES, SYMBOLS

AND ABBREVIATIONS

3 32

GENERAL NOTES

1. A HAZARDOUS MATERIALS INSPECTION WAS PERFORMED. THE

SURVEY/INSPECTION REPORT IS ATTACHED TO THE SPECIFICATION AS

APPENDIX A FOR INFORMATION. THE WORK WILL REQUIRE THE REMOVAL

OF ASBESTOS CONTAINING MATERIALS AS INDICATED. DESTRUCTIVE

ACTIVITIES SUCH AS BREAKING INTO WALLS, CEILINGS, AND FLOORS WERE

NOT PERFORMED IN ORDER TO LOCATE MATERIALS. THEREFORE, IF DURING

THE WORK SUSPECT MATERIALS ARE UNCOVERED, STOP WORK AND

NOTIFY THE CO. DRAWINGS, SPECIFICATIONS, AND REPORT ARE PROVIDED

FOR INFORMATION ONLY. ASSESS HAZARDOUS CONDITIONS PRIOR TO

START OF CONSTRUCTION AND COLLECT WASTE CHARACTERIZATION

SAMPLES PRIOR TO DISPOSAL.

2. CONTACT THE NATIONAL PARK SERVICE (NPS) OFFICE PRIOR TO

BEGINNING THE PAINT ABATEMENT ACTIVITIES IN ARCHITECTURAL

DRAWINGS. COORDINATE WITH NPS TO SET UP AN ACCUMULATION AREA

FOR THE REMOVED PAINT WHICH TESTED HAZARDOUS. LABEL THE

CONTAINER CONTENTS AND START DATE OF ACCUMULATION. NPS MUST

PRE-APPROVE THE DISPOSAL FACILITY AND SIGN THE MANIFEST PRIOR TO

OFF-SITE DISPOSAL. PROVIDE NPS A COPY OF THE SIGNED MANIFEST

FROM THE DISPOSAL FACILITY. CONTACT THE NPS OFFICE PRIOR TO

BEGINNING THE ACM REMOVAL ACTIVITIES. SET UP AN ACCUMULATION

AREA FOR THE REMOVED ACM. NPS MUST PRE-APPROVE THE DISPOSAL

FACILITY AND SIGN THE MANIFEST PRIOR TO THE OFF-SITE DISPOSAL.

PROVIDE NPS A COPY OF THE SIGNED MANIFEST FROM THE DISPOSAL

FACILITY.

3. EXISTING PAINT HAS BEEN DETERMINED TO CONTAIN LEAD, AT

CONCENTRATIONS ABOVE THE LABORATORY'S DETECTION LIMIT. REVIEW

ENVIRONMENTAL HAZARDOUS MATERIALS REPORT FOR LEAD BASED PAINT

INFORMATION. PERFORM RENOVATION/DEMOLITION WORK IN ACCORDANCE

WITH SPECIFICATION SECTION 02 83 00 "LEAD REMEDIATION".

CONSTRUCTION STANDARDS DEVELOPED BY OSHA FOR AND LEAD ARE;

LEAD, 29 CFR 1926.62. REFER TO SPECIFICATION SECTION 02 83 33

FOR ADDITIONAL INFORMATION ON CLEANING AND PAINT REMOVAL ON

EQUIPMENT, PIPING AND CONDUIT. ALL LEAD PAINT THAT IS ON EXISTING

ITEMS TO REMAIN ARE TO BE ABATED. ALL ITEMS CONTAINING LEAD-

BASED PAINT THAT ARE NOTED TO BE REMOVED SHALL BE DISPOSED OF

PROPERLY ACCORDING TO THE SPECIFICATIONS. REFER TO HAZMAT

REPORT AND DRAWINGS FOR ITEMS AND LOCATIONS. CERTAIN ITEMS

SUCH AS THE WOOD CEILING PLANKS AND THE CORRUGATED METAL

EXTERIOR FRIEZES ABOVE THE HANGAR DOORS TESTED FOR LEAD PAINT

ARE NOT TO BE DEMOLISHED OR ABATED DURING THIS PHASE.

MATCHLINE

ENVIRONMENTAL SAMPLE

REMOVAL NOTE INDICATOR

ABBREVIATION

CMU

CONC

EV

EQUIP

FT

LF

NTS

RM

STR

TYP

UNO

DESCRIPTION

CONCRETE MASONRY UNIT

CONCRETE

ENVIRONMENTAL

EQUIPMENT

FEET

LINEAR FEET

NOT TO SCALE

ROOM

STAIR

TYPICAL

UNLESS NOTED OTHERWISE

ABBREVIATIONS

SYMBOLS LIST

4. PROVIDE AIR EXPOSURE MONITORING TO MONITOR FOR CHROMIUM, CADMIUM, AND

LEAD IN ACCORDANCE WITH GUIDANCE PROVIDED IN SPECIFICATION SECTION 02

83 33 - LEAD REMEDIATION.

5. REMOVE IDENTIFIED ASBESTOS IN ACCORDANCE WITH GUIDANCE PROVIDED IN

SPECIFICATION SECTION 02 82 13 - ASBESTOS REMEDIATION.

6. IF PAINTED METAL COMPONENTS THAT TESTED POSITIVE FOR LEAD ARE TO BE

REMOVED FROM THE SITE, THE CONTRACTOR MAY SEND THE METAL COMPONENTS

FOR OFF-SITE RECYCLING. PAINT MUST REMAIN INTACT DURING REMOVAL AND

TRANSPORTATION. REVIEW ENVIRONMENTAL HAZARDOUS MATERIALS REPORT FOR

LEAD BASED PAINT INFORMATION.

7. DOORS MARKED TO REMAIN IN PLACE OR SALVAGE ON AD-101 TO BE ABATED

FOR LEAD PAINT. ASSUME FIRE RATED DOORS CONTAIN ASBESTOS. FOLLOWING

INSPECTION, NON-ASBESTOS FIRE DOORS CAN BE DISPOSED OF AS REGULAR

CONSTRUCTION WASTE IF NOT MARKED TO REMAIN IN PLACE OR SALVAGE ON

AD-101.

8. LIGHT BALLAST HAVE BEEN INSPECTED. NO INDICATION IS PROVIDED IF PCB

FLUIDS ARE PRESENT IN BALLAST. BASED ON AGE OF HANGAR BALLAST SHOULD

BE TREATED AS PCB CONTAINING UNLESS TESTING DETERMINES OTHERWISE.

9. INCORPORATE POTENTIAL EXPOSURE TO BIRD DROPPINGS AND MOLD INTO HEALTH

AND SAFETY PLAN.

10. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH STATE OF NEW YORK

STANDARDS.

ABBREVIATION

ACM

PC

PCB

DESCRIPTION

ASBESTOS

PAINT CHIP

POLYCHLORINATED BIPHENYL

SAMPLE DESCRIPTION

H3.1

PC-03

PC-04

PC-06

PC-07

PC-05

PC-08

PC-01

PC-04

PC-09

PC-13

PC-12

PC-10

PC-11

PC-16PC-15

PC-27

PC-26

PC-14

PC-18

PC-17

PC-21

P C

-2

PC-19

PC-35

PC-36

PC-34

HANGER 4

HANGAR 3

SHOOTING RANGE

BOILER ROOM

004A

HANGER 4 ADMIN

003A

HANGAR 3 ADMIN

H3.1

H3.1

H3.1

H3.2

PC-11 - 3.13.24 PC-10 - 3.13.24

PC-07 - 3.13.24

PC-08 - 3.13.24

PC-09 - 3.13.24

PC-04 - 3.13.24

PC-05 - 3.13.24

PC-06 - 3.13.24 PC-33

PC-32

PC-31

PC-30

PC-29

PC-28

PC-25

PC-02

PC-23

PC-24 PC-22

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

190066

GATE 308504

HANGARS 3 & 4 HAZARDOUS MATERIALS

REMEDIATION AND EARLY DEMOLITION

/2

/2

:2

:5

P

M A u to d e s k D o c s /G

A T

E F lo y d B e n n e tt F ie ld

/N P

S G a te

F lo y d B e n n e tt F ie ld

-G H

D .r v t

DAZ

LDB

CCW

04/19/2024

H1.3

LEVEL 01 PC SAMPLE

LOCATION -

ENVIRONMENTAL

6 32

REFERRED FROM:1/16" = 1'-0"H1.3 H3.1

1 LEVEL 01 PC SAMPLE LOCATION - ENVIRONMENTAL

REFERRED FROM:1/16" = 1'-0"H1.3 H3.1

2 LEVEL 01M PC SAMPLE LOCATION - ENVIRONMENTAL

1. LEAD BASED PAINT WAS DETECTED AT THE FOLLOWING

PAINT SAMPLE LOCATIONS:

- PC 01, 03, 04, 06, 09, 10, 11, 12, 13, 17

THROUGH 27, 29, 30, 32, 34, 35, AND 36,

PC-04 - 3.14.24, PC-05 - 3.14.24, PC-08

3.14.24, PC-09 3.14.24, PC-10 3.14.24

LEAD CONTAINING PAINT WAS DETECTED IN ALL

SAMPLE LOCATIONS

SHEET NOTES

#### - Concentrations presented in bold and red were detected above TCLP and LBP screening criteria (0.5% by weight).

Notes:

PC-11 - 3.13.24 Blue/Grey paint - Double doors from Hangar 4 to Shooting range 0.24

PC-10 - 3.13.24 Blue/Grey paint - Double doors from Hangar 3 to Shooting range 0.73

PC-09 - 3.13.24 Green paint - Boiler Pumps 5.7

PC-08 - 3.13.24 Grey/Silver paint - Boiler Door 0.93

PC-07 - 3.13.24 Black paint - Boiler Door 0.26

PC-06 - 3.13.24 Blue and green paint - Hangar 3 Catwalk 0.44

PC-05 - 3.13.24 Blue and green paint - Hangar 3 Trusses 12

PC-04 - 3.13.24 Blue and green paint - Hangar 3 Catwalk 1.8

PC-03 - 3.13.24 Orange and black paint - Above Hangar 3 Doors 6.4

PC-02 - 3.13.24 Cream paint - NYC Sign Above Hangar 4 Doors 9.7

PC-01 - 3.13.24 Orange and black paint - Above Hangar 4 Doors 4.8

PC-36 Light gray paint - Boiler room - east 21

PC-35 Black paint - Boiler room - south 0.62

PC-34 Dark gray paint - Boiler room - south 2

PC-33 Light blue paint - Hangar 3 admin - south 0.032

PC-32 Dark blue paint - Hangar 3 admin - south 0.82

PC-31 Crème paint - Hangar 3 admin - center 0.26

PC-30 Dark green paint - Hangar 3 admin - center 4.7

PC-29 Light blue paint - Hangar 3 admin - center hallway 5.8

PC-28 Crème paint - Hangar 3 admin - north wall 0.054

PC-27 White paint - Hangar 3 - west wall 37

PC-26 Gray paint - Hangar 3 - west wall 23

PC-25 Light blue paint - Hangar 3 - east wall 2.5

PC-24 Light green paint - Shooting range - 2nd floor bathroom stalls 6.7

PC-23 Black paint - Shooting range - 2nd floor structural beams 11

PC-22 Dark gray paint - Shooting range - 2nd floor bathroom door 4

PC-21 Dark brown paint - Shooting range - south wall 0.74

PC-20 Crème paint - Shooting range - south wall 1.3

PC-19 Yellow paint - Shooting range - south wall 0.83

PC-18 Dark green paint - Shooting range, west wall 5.2

PC-17 Crème paint - Shooting range - west wall 0.84

PC-16 Gray paint - Shooting range - north wall 0.3

PC-15 Yellow paint - Shooting range - north wall 0.32

PC-14 Dark blue paint - Hangar 4 - east wall 0.22

PC-13 Crème paint - Hangar 4 - west wall 31

PC-12 Pink paint - Hangar 4 - west wall 4

PC-11 Dark blue paint - Hangar 4 - west door 1.9

PC-10 Light blue paint - Hangar 4 - west wall 1.7

PC-09 Green paint - Hangar 4 admin - plaster 12

PC-08 Light blue/light green paint - Hangar 4 admin - center hallway 0.12

PC-07 Dark gray paint - Hangar 4 admin - center cabinet 0.2

PC-06 Light blue paint - Hangar 4 admin - north 7.1

PC-05 Crème paint - Hangar 4 admin - center 0.29

PC-04 Light green paint - Hangar 4 admin - center 0.85

PC-03 Dark blue paint - Hangar 4 admin - center door frame 5.2

PC-02 Green paint - Hangar 4 admin - center 0.32

PC-01 Light blue paint - Hangar 4 admin - west 0.53

Sample ID Sample Description Lead Concentration (% wt)

KITCHEN

SHOWER

STORAGE

OFFICE

RR

OFFICE AREA

LOUNGE

TOILET

OFFICE

CLASSROOM

STORAGE STORAGE

STORAGE

HANGER 3

MDP-A

ELECTRICAL

BP-3A

BP-3B

BP-3C

BP-3D

BP-3E

<O

O>

O>

<O

<O

O>

STRIP LIGHT

LIGHT

FIXTURE

(TYP.)

SCALE OF FEET

0'8' 8' 16'

SCALE A

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

190066

GATE 308504

HANGARS 3 & 4 HAZARDOUS MATERIALS

REMEDIATION AND EARLY DEMOLITION

KEY PLAN

HANGER 3

SEAL

/1

/2

:1

:0

P M

C A u to d e s k \R e v it

L o c a l C o p y \2

-0 l_

D e m o lit io n M o d e l_ d th a m m a ia h .r v t

DAT

DAT

WJR

04/19/2024

E2

ELECTRICAL DEMOLITION

FLOOR PLAN - ENLARGED -

HANGAR 3

SCALE AE2

1 ELECTRICAL DEMOLITION FLOOR PLAN - ENLARGED - HANGAR 3

UNLESS OTHERWISE NOTED, CONTRACTOR

TO DEMOLISH ALL EXISTING ELECTRICAL

DEVICES, SYSTEMS, EQUIPMENT, CONDUITS,

WIRING AND BOXES SHOWN OR NOT SHOWN

ON PLANS THROUGHOUT THE AREA OF

WORK INCLUDING BUT NOT LIMITED TO

LIGHTING FIXTURES, FIRE ALARM DEVICES,

SWITCHES, RECEPTACLES, WIRING DEVICES,

CLOCK OUTLETS, SOUND SYSTEM,

INTERCOM, SECURITY SYSTEM DEVICES,

MOTORS AND MISCELLANEOUS EQUIPMENT.

REMOVE ALL ASSOCIATED WIRING AND

CONDUIT BACK TO SOURCE OF SUPPLY. CUT

BACK, CAP AND ABANDON ALL CONCEALED

EXISTING CONDUITS WHICH ARE LOCATED IN

CONCRETE WALL OR CEILING/FLOOR SLAB.

REMOVE ALL WIRING FROM ANY ABANDONED

CONDUITS BACK TO THE SOURCE OF

SUPPLY.

REFER TO DRAWING E5 FOR EXISTING

CONDITION PHOTOS.

THE MAIN SERVICE DISCONNECT MUST

REMAIN DUE TO EXISTING LIFT STATION

POWER. CONTRACTOR SHALL COORDINATE

SHUTOFF OF HANGARS 3 & 4 POWER TO

COMPLETE PROJECT WORK WHILE

MAINTAINING CONTINUED OPERATION OF

EXISTING LIFT STATION FROM SAME

DISCONNECT. CONTRACTOR SHALL

INCLUDE $10,000 OF ELECTRICAL

IMPROVEMENTS IN THEIR BID TO ACCOUNT

FOR NECESSARY COORDINATION.

TO RYAN BUILDING MAIN ELECTRICAL ROOM

LOCATED NORTHWEST OF THE BUILDING

APPROXIMATELY 1500 FEET.

SHEET KEYED NOTES:#

6 5 4 3

NO. REVISION DATE BY

04/19/2024 mwmoore Polygon

EXISTING CONDITION : HANGAR 4

EXTERIOR LIGHTING FIXTURES

EXISTING CONDITION : HANGAR 3

MAIN ELECTRICL DISTRUBUTION SYSTEM

EXISTING CONDITION : HANGAR 3

BRANCH PANELBOARD

EXISTING CONDITION : HANGAR 3

HIGH BAY PENDANT LIGHT FIXTURE

EXISTING CONDITION : HANGAR 3

BRANCH PANELBOARD

2a 3 4 5

EXISTING CONDITION : HANGAR 3

TELECOM

EXISTING CONDITION : HANGAR 3

SERVICE DICONNECT SWITH AND EXTERIOR LIGHT

DRAWING NOTES:

1. PHOTOS ARE PROVIDED FOR SUPPLEMETARY INFORMATION, NOT ALL THE EXISTING CONDITION ARE SHOWN.

2. COLOR PHOTOS ARE BEST VIEWED IN ELECTRONIC FORMAT.

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

190066

GATE 308504

HANGARS 3 & 4 HAZARDOUS MATERIALS

REMEDIATION AND EARLY DEMOLITION

SEAL

/1

/2

:1

:2

P M

C A u to d e s k \R e v it

L o c a l C o p y \2

-0 l_

D e m o lit io n M o d e l_ d th a m m a ia h .r v t

DAT

DAT

WJR

04/19/2024

E5

ELECTRICAL EXISTING

CONDITION

NO. REVISION DATE BY

04/19/2024

MKutch Text Box Existing panel to remain. Operation of existing lift station is fed from this panel. Contractor shall coordinate shutoff of Hanger 3 & 4 power with operational necessity for existing lift station power. Contractor shall include $10,000 of electrical improvements in their bid.

Amendment No. 02 - Sht Revisions A2, A3, H0.1, H1.3, E5 and Hangar Dims.pdf
Sheets
A2 - PHOTOS - DEMOLITION
A3 - PHOTOS - DEMOLITION

File details come from the government source that posted it. Updated .