This document is an amendment to Solicitation 140P2024R0010 for the rehabilitation and expansion of the Wastewater Treatment Plant at MORU 272051. The key changes in this amendment are:

a) The Period of Performance has been extended from 365 days to 730 days after the Notice to Proceed (NTP).

b) There are no expected winter shutdowns.

c) The contractor shall submit a schedule in MS Project Gantt Chart format, assuming an NTP date of August 1, 2024, and include specific activities, a critical path, and major milestones.

d) A sign-in sheet from the November 2, 2023 site visit is required.

e) All other terms and conditions of the solicitation remain unchanged.

The original solicitation is for the rehabilitation and expansion of the wastewater treatment plant to increase its flow and treatment capacity. The contracting officer is Edwin Berry, and the project team includes the NPS PM/COR, PS/COR, and Contract Specialist.

View the file

Other files

File Type Posted
Sol_140P2024R0010_Amd_0004.pdf PDF
Sol_140P2024R0010_Amd_0003.pdf PDF
Addendum_2_Items_0003.pdf PDF
00-D004_ADDENDUM_0003.pdf PDF
Questions_and_Answers_for_Solicitation_140P2023R0125_140P2024R0010_0003.xlsx XLSX spreadsheet
Sol_140P2024R0010_Amd_0002.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD(1)_0002.pdf PDF
MORU_272051_Site-Visit_November_02__23_0001.pdf PDF
Attachment_11_Construction_WD_(Davis_Bacon_Wage_Rates)__SD20220032_-_Building.pdf PDF
Sol_140P2024R0010.pdf PDF
Attachment_6_STATEMENT_OF_STRUCTURAL_TESTS_AND_SPECIAL_INSPECTIONS.pdf PDF
Attachment_1a__Specs_VOL_2_CD_FINAL-_Div_1___T_O_C.pdf PDF
Attachment_9_PSP_VOL_I.pdf PDF
Attachment_4_VOLUME_3__South_Bldg__COMPLETE.pdf PDF
Attachment_2_VOLUME_1_Series_00-01__General__Civil.pdf PDF
Attachment_8_WWTP_Closeout-OperationMaintenance-Requirements.pdf PDF
B08_Solit_1442_Clauses_Construction_4_23_24.pdf PDF
Attachment_12__Construction_Contract_Administration_Form.pdf PDF
Attachment_10a_Fillable_-_ContractPriceSchedule_23_6_13_CD.xlsx XLSX spreadsheet
Attachment_3_VOLUME_2__North_Bldg__COMPLETE.pdf PDF
Attachment_10b_PSP_Vol_II_SubKPlan__Apr24.docx DOCX document
Attachment_9a_Bid_Bond__VOL-1-24-16e.pdf PDF
Attachment_10_PSP_VOL_II.pdf PDF
Attachment_5_VOLUME_4__Series_04-09__COMPLETE.pdf PDF
Attachment_1__Specs_VOL_1_CD_FINAL-_Div_1___T_O_C.pdf PDF
Attachment_7_MORUGeotechnical_Report.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0010 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

MORU 27205104/23/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/23/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The reason for Amendment 01 is to change the Period of Performance Days.

a. Change Period of Performance of 365 days after Notice to Proceed (NTP) to the new Period of Performance of 730 days after issuance of NTP.

b. No winter shutdowns expected

c. Per evaluation factor 2 Technical Approach and Schedule Subfactor 2b Schedule the following information shall change as follows:

Submit your schedule in MS Project Gantt Chart format; contractor shall assume a Notice to Proceed start date of August 1, 2024 for schedule submission only, that allow completion within the period of performance; and include specific activities required for this project and a clear critical path with major milestones and applicable predecessor activities.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Edwin Berry

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0010/0001 and

(A formal NTP will be issued after all requirements are completed and at that time a formal schedule will be required.) In your accompanying narrative, explain schedule logic, critical path activities, and key considerations and constraints including the disposal fields must be finished in 2026.

d. Provide sign-in sheet from November 02, 2023 site visit.

e. All terms and conditions of this solicitation remain unchanged.

PROJECT TEAM:

NPS PM/COR: Jason Riharb

NPS PS/COR: Kelsey Anderson

NPS CO: Edwin Berry

NPS CS: Joy Ewalt

See Contract Price Schedule under Section B -

Schedule of this Solicitation for the Contract

Line Items.

Period of Performance: 08/01/2024 to 07/31/2026