Addendum_2_Items_0003.pdf

PDF 87 KB Posted

Attached to
MORU 272051 - Rehabilitate and Expand Wastewater T
Solicitation number
140P2024R0010
Issued by

About this file

This document is an addendum to a federal contract opportunity. The addendum includes changes to specifications for Piping System 9, which is a buried force main for sanitary sewer and similar applications. The key details are:

The addendum specifies the materials, fittings, and joint requirements for 2-inch and 4-inch buried piping, including PVC Schedule 80 and HDPE SDR 17 (125 psi). It also provides test requirements such as using water as the test medium, pressure testing at 1.25 times the working pressure, and a 6-hour duration. Additionally, the addendum includes changes to drawings, such as revising the size of the force main serving the Winter Solids Building from 4-inch to 2-inch.

The related federal contract opportunity is Solicitation Number 140P2024R0010 for the rehabilitation and expansion of a wastewater treatment plant, issued by the Department of the Interior National Park Service National Office.

View the file

Other files

File Type Posted
Sol_140P2024R0010_Amd_0004.pdf PDF
Sol_140P2024R0010_Amd_0003.pdf PDF
00-D004_ADDENDUM_0003.pdf PDF
Questions_and_Answers_for_Solicitation_140P2023R0125_140P2024R0010_0003.xlsx XLSX spreadsheet
Sol_140P2024R0010_Amd_0002.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD(1)_0002.pdf PDF
MORU_272051_Site-Visit_November_02__23_0001.pdf PDF
Sol_140P2024R0010_Amd_0001.pdf PDF
Attachment_11_Construction_WD_(Davis_Bacon_Wage_Rates)__SD20220032_-_Building.pdf PDF
Sol_140P2024R0010.pdf PDF
Attachment_6_STATEMENT_OF_STRUCTURAL_TESTS_AND_SPECIAL_INSPECTIONS.pdf PDF
Attachment_1a__Specs_VOL_2_CD_FINAL-_Div_1___T_O_C.pdf PDF
Attachment_9_PSP_VOL_I.pdf PDF
Attachment_4_VOLUME_3__South_Bldg__COMPLETE.pdf PDF
Attachment_2_VOLUME_1_Series_00-01__General__Civil.pdf PDF
Attachment_8_WWTP_Closeout-OperationMaintenance-Requirements.pdf PDF
B08_Solit_1442_Clauses_Construction_4_23_24.pdf PDF
Attachment_12__Construction_Contract_Administration_Form.pdf PDF
Attachment_10a_Fillable_-_ContractPriceSchedule_23_6_13_CD.xlsx XLSX spreadsheet
Attachment_3_VOLUME_2__North_Bldg__COMPLETE.pdf PDF
Attachment_10b_PSP_Vol_II_SubKPlan__Apr24.docx DOCX document
Attachment_9a_Bid_Bond__VOL-1-24-16e.pdf PDF
Attachment_10_PSP_VOL_II.pdf PDF
Attachment_5_VOLUME_4__Series_04-09__COMPLETE.pdf PDF
Attachment_1__Specs_VOL_1_CD_FINAL-_Div_1___T_O_C.pdf PDF
Attachment_7_MORUGeotechnical_Report.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHANGES TO SPECIFICATIONS

Section 40 05 00, Paragraph 3.12, Add Piping System 9:

Piping System 9 – Buried Force Main for Sanitary Sewer and Similar Applications.

1. General:

a. Piping symbol and service:

1) FM – Force Main (Sanitary Sewer or Similar)

b. Test requirements:

1) Test medium: Water.

2) Pressure: 1.25 x working pressure.

3) Duration: 6 hours.

c. Gaskets and O-rings:

1) O-rings: Neoprene or rubber.

2) Flanged, push-on and mechanical joints (ductile iron): Rubber, AWWA/ANSI C111/A21.11.

2. System components:

a. Pipe size, 2 inches:

1) Buried service:

a) Materials: PVC, Schedule 80.

b) Reference: ASTM D1785.

c) Lining: None.

d) Coating: None.

e) Fittings: Solvent welded, PVC, Schedule 80.

f) Joints: Solvent cement weld.

b. Pipe size, 4 inches:

1) Buried service:

a) Materials: HDPE, SDR 17 (125 psi), Ductile Iron Pipe Size (DIPS)

(1) Reference: AWWA/ANSI C909, ASTM F714, ASTM D3035, ASTM D3350

Cell Class 445574C/E

(2) Lining: None.

(3) Coating: None.

(4) Fittings: Butt Fusion Fittings, ASTM D3261

(5) Joints: Butt Fusion Joints

Section 40 61 96H, Paragraph 3.2.D, Delete Sample Pumps (02-SAP-1, 02-SAP-2, 02-SAP-3, and 02-

SAP-4)

CHANGES TO DRAWINGS

Drawing 00-D004:

Replace 00-D004 with the attached Sheet 00-D004. The Tertiary Treatment Process Diagram has been revised.

Drawing 01-C806:

Change the size of the forcemain serving the Winter Solids Building from 4-inch to 2-inch.

Drawing 09-Y612:

Delete sample pumps 02-SAP-1, 02-SAP-2, 02-SAP-3, and 02-SAP-4.

ATTACHMENTS

The items listed below and bound to and a part of this Addendum.

• Drawing 00-D004

Piping System 9 – Buried Force Main for Sanitary Sewer and Similar Applications.
1. General:
a. Piping symbol and service:
1) FM – Force Main (Sanitary Sewer or Similar)
b. Test requirements:
1) Test medium: Water.
2) Pressure: 1.25 x working pressure.
3) Duration: 6 hours.
c. Gaskets and O-rings:
1) O-rings: Neoprene or rubber.
2) Flanged, push-on and mechanical joints (ductile iron): Rubber, AWWA/ANSI C111/A21.11.
2. System components:
a. Pipe size, 2 inches:
1) Buried service:
a) Materials: PVC, Schedule 80.
b) Reference: ASTM D1785.
c) Lining: None.
d) Coating: None.
e) Fittings: Solvent welded, PVC, Schedule 80.
f) Joints: Solvent cement weld.
b. Pipe size, 4 inches:
1) Buried service:
a) Materials: HDPE, SDR 17 (125 psi), Ductile Iron Pipe Size (DIPS)
(1) Reference: AWWA/ANSI C909, ASTM F714, ASTM D3035, ASTM D3350 Cell Class 445574C/E
(2) Lining: None.
(3) Coating: None.
(4) Fittings: Butt Fusion Fittings, ASTM D3261
(5) Joints: Butt Fusion Joints

ATTACHMENTS