This document is a summary of changes made to the specifications for the CALO 226858, Repair Cape Lookout Lighthouse federal contract opportunity.

The key changes include modifications to the summary of work regarding the transport of materials on larger barges, a reduction in the size and operability requirements for the contracting officer's field office, and the removal of FM Global approval requirements for the polyvinyl-chloride (PVC) roofing due to the project not being insured by FM Global. Additionally, the electrical notes and legends were updated to remove the requirements for an intrusion detection system and horn and strobe fire alarm system, as these are no longer required as part of the solicitation.

View the file

Other files

File Type Posted
Sol_140P2024R0007_Amd_0005.pdf PDF
Sol_140P2024R0007_Amd_0004.pdf PDF
B08_140P2024R0007_Amendment_4_0004.pdf PDF
B08_140P2024R0007_Amendment_3_0003.pdf PDF
B08_Solicitation_revised_Page8_amendment03_0003.pdf PDF
B08_Solit_PSP_Vol_II_Attach_06_Price_Schedule_-_BLANK_amendment03_0003.xlsx XLSX spreadsheet
Sol_140P2024R0007_Amd_0003.pdf PDF
B08_140P2024R0007_Amendment_2_0002.pdf PDF
Amendment_02_0002.zip ZIP file
B08_CALO226858_Questions_Responses_Spreadsheet_-_Amend_02_0002.pdf PDF
Sol_140P2024R0007_Amd_0002.pdf PDF
B08_Solit_PSP_Vol_I_Soit_Attach_04_Project_Experience_Amendment_1_REQD_0001.docx DOCX document
B08_Solit_PSP_Vol_I_Soit_Attach_05_PastPerf_REQD_Amendmend_1_(2)_0001.docx DOCX document
B08_Amendment01_CALO_225868-PreBid_Sign-In_0001.pdf PDF
Sol_140P2024R0007_Amd_0001.pdf PDF
B08_140P2024R0007_Amendment_1_0001.pdf PDF
B08_Solit_PSP_Vol_II_Solit_Attach_07_GenRefs_doc.pdf PDF
Sol_140P2024R0007.pdf PDF
B08_Solit_Attach_01_Specifications_.pdf PDF
B08_Solit_Attach_03_Construciton_Wage_Decision_NC20240062_01052024.pdf PDF
B08_Solicitation_140P2024R0007_CALO_226858.pdf PDF
B08_Soli_Attach_9_-_HazardousMaterials.doc DOC document
B08__Solit_Attach_02_Drawings.pdf PDF
B08_Solit_PSP_Vol_I_Solit_Attach_04_Exp_REQD.pdf PDF
B08_Solit_Attach_10_SBSubKPlanForm.doc DOC document
B08_Solit_PSP_Vol_I_Solit_Attach_05_PastPerf_REQD.docx DOCX document
B08_Solit_PSP_Vol_II_Attach_06_Price_Schedule_-_BLANK.xlsx XLSX spreadsheet
B08_Construction_Contract_Adminstration_Provision_Attach_11.pdf PDF
B08_Solit_PSP_Vol_II_Solit_Attach_08_BidBond.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

liollio architecture 843.762.2222

■ ■ liollio.com

The following is a summary of the changes were made to the specifications. See each specification for the modification.

• 011100 – Summary of Work – Modifications to summary of work in regard to the transport of materials on a larger barge.

o 1.5.D.1 – Notes on the accommodation of larger barges

• 01 50 00 – Temporary Facilities and Controls – Modifications to the contracting officers field office requirements o 2.2.B – Reduction in size and operability

• 075419 – Polyvinyl-Chloride (PVC) Roofing – Modifications below are in response to removing

FM Global approvals due to project not being insured by FM Global.

o 2.1.C – Removed FM Global Approvals o 2.1.D – Removal of FM Global Approvals o 2.1.E – Removal of FM Global requirements o 2.3.J – Removal of FM Global requirements o 3.3.A – Removal of FM Global requirements

• Plan Sheet E1 – Electrical Notes And Legends o Removed Alternate Bid Pricing Notes – Intrusion Detection System and Horn and Strobe Fire Alarm System are not required.