B08_140P2024R0007_Amendment_2_0002.pdf

PDF 87 KB Posted

Attached to
CALO 226858, Repair Cape Lookout Lighthouse
Solicitation number
140P2024R0007
Issued by

About this file

This document is an amendment to Solicitation 140P2024R0007 for the Repair of the Cape Lookout Lighthouse project. The key details are:

The purpose of this amendment is to: 1) Provide a spreadsheet with responses to questions about the solicitation, 2) Attach a summary of changes made to the solicitation documents, and 3) Provide a zip folder containing the updated solicitation documents. Additionally, the amendment extends the due date for proposal submissions to April 10, 2024 by 5:00 PM Eastern Daylight Time. The contracting office is the Department of the Interior National Park Service National Office.

View the file

Other files

File Type Posted
Sol_140P2024R0007_Amd_0005.pdf PDF
Sol_140P2024R0007_Amd_0004.pdf PDF
B08_140P2024R0007_Amendment_4_0004.pdf PDF
B08_140P2024R0007_Amendment_3_0003.pdf PDF
B08_Solicitation_revised_Page8_amendment03_0003.pdf PDF
B08_Solit_PSP_Vol_II_Attach_06_Price_Schedule_-_BLANK_amendment03_0003.xlsx XLSX spreadsheet
Sol_140P2024R0007_Amd_0003.pdf PDF
Amendment_02_0002.zip ZIP file
B08_CALO226858_Questions_Responses_Spreadsheet_-_Amend_02_0002.pdf PDF
Sol_140P2024R0007_Amd_0002.pdf PDF
B08_Summary_of_Changes_Amendment_02_0002.pdf PDF
B08_Solit_PSP_Vol_I_Soit_Attach_04_Project_Experience_Amendment_1_REQD_0001.docx DOCX document
B08_Solit_PSP_Vol_I_Soit_Attach_05_PastPerf_REQD_Amendmend_1_(2)_0001.docx DOCX document
B08_Amendment01_CALO_225868-PreBid_Sign-In_0001.pdf PDF
Sol_140P2024R0007_Amd_0001.pdf PDF
B08_140P2024R0007_Amendment_1_0001.pdf PDF
B08_Solit_PSP_Vol_II_Solit_Attach_07_GenRefs_doc.pdf PDF
Sol_140P2024R0007.pdf PDF
B08_Solit_Attach_01_Specifications_.pdf PDF
B08_Solit_Attach_03_Construciton_Wage_Decision_NC20240062_01052024.pdf PDF
B08_Solicitation_140P2024R0007_CALO_226858.pdf PDF
B08_Soli_Attach_9_-_HazardousMaterials.doc DOC document
B08__Solit_Attach_02_Drawings.pdf PDF
B08_Solit_PSP_Vol_I_Solit_Attach_04_Exp_REQD.pdf PDF
B08_Solit_Attach_10_SBSubKPlanForm.doc DOC document
B08_Solit_PSP_Vol_I_Solit_Attach_05_PastPerf_REQD.docx DOCX document
B08_Solit_PSP_Vol_II_Attach_06_Price_Schedule_-_BLANK.xlsx XLSX spreadsheet
B08_Construction_Contract_Adminstration_Provision_Attach_11.pdf PDF
B08_Solit_PSP_Vol_II_Solit_Attach_08_BidBond.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0007 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

02/08/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/08/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment 0002 is to:

1. Attach the Responses to Questions Spreadsheet. Please refer to the attached file named:

"B08_CALO226858_Questions_Responses_Spreadsheet - Amend 02.pdf"

2. Attach the file that delineates the Summary of Changes to the Solicitation Documents.

Please refer to attached file named: "B08_Summary of Changes_Amendment_02.pdf"

3. Attach the zip folder that contains all changed Solicitation documents, that are referenced in the Responses to Questions Spreadsheet pdf document. Please refer to attached zip folder named: "Amendment 02.zip"

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

John Babcock

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0007/0002

4. Extend the due date and time for Proposal

Submissions to April 10, 2024; no later than

17:00 Eastern Daylight Time (ED)

Contracting Officer: John Babcock, john_babcock@nps.gov

Contract Specialist: Julia Sullivan, julia_sullivan@nps.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .