Sol_140P2023R0087_Amd_0003.pdf

PDF 110 KB Posted

Attached to
CAHA 249093 Replace Hatteras Island Trailers Federal contract opportunity
Solicitation number
140P2023R0087
Issued by
Department of the Interior National Park Service National Office

About this file

This document is an amendment to a federal solicitation. The amendment extends the response due date from October 2nd to October 5th for solicitation number 140P2023R0087 to replace trailers on Hatteras Island for the Department of the Interior National Park Service. The amendment also incorporates answers to seven questions from potential offerors. The questions and answers clarify that modular homes will include residential fire sprinkler systems per NFPA 13D, confirm adequate water pressure for the systems, clarify that a new fire line is not required as the site has three existing hydrants between 30 and 180 feet from new home locations, and confirm this is an 8(a) competitive set-aside solicitation requiring only North Carolina licensure for architects.

View the file

Other files for this federal contract opportunity

Other files attached to CAHA 249093 Replace Hatteras Island Trailers, newest first.
File Type Posted
Sol_140P2023R0087_Amd_0004.pdf PDF
Sol_140P2023R0087_Amd_0002.pdf PDF
Sol_140P2023R0087_Amd_0001.pdf PDF
Attachment_1_Experience_Questionnaire.rtf RTF text file
Sol_140P2023R0087.pdf PDF
Attachment_3_SF_330.pdf PDF
Attachment_2_Past_Performance_Questionnaire.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2023R0087 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

09/26/20230003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/23/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment 0003 is to do the following:

1. Extend the due date from 5:00 PM ET 2 October 2023 to 5:00 PM ET 5 October 2023

2. Incorporate Questions & Answers

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Bai Perney

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Question Number

Question Answer/Response

1 What is the fire suppression system to consist of?

MODULAR HOMES WILL BE EQUIPPED WITH RESIDENTIAL

FIRE PROTECTION SYSTEMS IN ACCORDANCE WITH NFPA

13D USING SCHEDULE 40 CPVC PIPING.

2 Is the government referring to a fire sprinkler system?

MODULAR HOMES WILL BE EQUIPPED WITH RESIDENTIAL

FIRE PROTECTION SYSTEMS IN ACCORDANCE WITH NFPA

13D USING SCHEDULE 40 CPVC PIPING.

3 Is water pressure in the area sufficient to support a fire sprinkler system?

YES, WATER PRESSURE IS ADEQUATE. FLOW TESTING OF

THE MUNICIPAL FIRE HYDRANTS ON SITE REFLECT A

STATIC PRESSURE OF 44 PSI, 20 PSI AT 274 GPM, AND 0

PSI AT 380 GPM. PRESSURE-FLOW CURVE AND FLOW

TEST INFORMATION WILL BE PROVIDED IN THE PHASE II

PROGRAM OF REQUIREMENTS TECHNICAL PACKAGE.

4 Are we to install a fire line? INSTALLATION OF A NEW FIRE LINE WILL NOT BE

REQUIRED AS THE ENITIRE SITE IS SUPPORTED BY A

FUNCTIONAL MUNICIPAL FIRE LINE AND THREE

HYDRANTS.

5 How far is the nearest fire hydrant? THERE ARE THREE EXISTING FUNCTIONAL MUNICIPAL

FIRE HYDRANTS ON SITE LOCATED BETWEEN 30 FEET AND

180 FEET FROM THE NEW HOME LOCATIONS.

6 Where would we obtain a set of plans and specifications?

This is a design-build project. The Program of Requirements is delivered to those five contractors selected to move to Phase II.

7 Please confirm the above referenced solicitation is 8(a) set-aside per SF1442 block 10 of the solicitation

This requirement is an 8(a) competitive Set-Aside

8 Are GCs required to be licensed within the State of N.C?

Correction --- only the AE requires licensure in N. C.

File details come from the government source that posted it. Updated .