Sol_140P2023R0087_Amd_0003.pdf
PDF 110 KB Posted
- Attached to
- CAHA 249093 Replace Hatteras Island Trailers Federal contract opportunity
- Solicitation number
- 140P2023R0087
About this file
This document is an amendment to a federal solicitation. The amendment extends the response due date from October 2nd to October 5th for solicitation number 140P2023R0087 to replace trailers on Hatteras Island for the Department of the Interior National Park Service. The amendment also incorporates answers to seven questions from potential offerors. The questions and answers clarify that modular homes will include residential fire sprinkler systems per NFPA 13D, confirm adequate water pressure for the systems, clarify that a new fire line is not required as the site has three existing hydrants between 30 and 180 feet from new home locations, and confirm this is an 8(a) competitive set-aside solicitation requiring only North Carolina licensure for architects.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2023R0087_Amd_0004.pdf | ||
| Sol_140P2023R0087_Amd_0002.pdf | ||
| Sol_140P2023R0087_Amd_0001.pdf | ||
| Attachment_1_Experience_Questionnaire.rtf | RTF text file | |
| Sol_140P2023R0087.pdf | ||
| Attachment_3_SF_330.pdf | ||
| Attachment_2_Past_Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2023R0087 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
09/26/20230003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/23/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment 0003 is to do the following:
1. Extend the due date from 5:00 PM ET 2 October 2023 to 5:00 PM ET 5 October 2023
2. Incorporate Questions & Answers
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bai Perney
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Question Number
Question Answer/Response
1 What is the fire suppression system to consist of?
MODULAR HOMES WILL BE EQUIPPED WITH RESIDENTIAL
FIRE PROTECTION SYSTEMS IN ACCORDANCE WITH NFPA
13D USING SCHEDULE 40 CPVC PIPING.
2 Is the government referring to a fire sprinkler system?
MODULAR HOMES WILL BE EQUIPPED WITH RESIDENTIAL
FIRE PROTECTION SYSTEMS IN ACCORDANCE WITH NFPA
13D USING SCHEDULE 40 CPVC PIPING.
3 Is water pressure in the area sufficient to support a fire sprinkler system?
YES, WATER PRESSURE IS ADEQUATE. FLOW TESTING OF
THE MUNICIPAL FIRE HYDRANTS ON SITE REFLECT A
STATIC PRESSURE OF 44 PSI, 20 PSI AT 274 GPM, AND 0
PSI AT 380 GPM. PRESSURE-FLOW CURVE AND FLOW
TEST INFORMATION WILL BE PROVIDED IN THE PHASE II
PROGRAM OF REQUIREMENTS TECHNICAL PACKAGE.
4 Are we to install a fire line? INSTALLATION OF A NEW FIRE LINE WILL NOT BE
REQUIRED AS THE ENITIRE SITE IS SUPPORTED BY A
FUNCTIONAL MUNICIPAL FIRE LINE AND THREE
HYDRANTS.
5 How far is the nearest fire hydrant? THERE ARE THREE EXISTING FUNCTIONAL MUNICIPAL
FIRE HYDRANTS ON SITE LOCATED BETWEEN 30 FEET AND
180 FEET FROM THE NEW HOME LOCATIONS.
6 Where would we obtain a set of plans and specifications?
This is a design-build project. The Program of Requirements is delivered to those five contractors selected to move to Phase II.
7 Please confirm the above referenced solicitation is 8(a) set-aside per SF1442 block 10 of the solicitation
This requirement is an 8(a) competitive Set-Aside
8 Are GCs required to be licensed within the State of N.C?
Correction --- only the AE requires licensure in N. C.
File details come from the government source that posted it. Updated .