YOSE_215798_RFP_140P2022R0038_-_QR_Tracker_Amd1_0001.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
YOSE 215798 - Bridalveil Fall Comfort Station
Solicitation number
140P2022R0038
Issued by

About this file

This document contains questions and answers regarding Amendment 0001 to the solicitation for the YOSE 215798 - Bridalveil Fall Comfort Station project. The amendment addresses missing specification divisions and questions about pump requirements, static mixer certifications, and drawings. Bidders sought clarification on voltage and phase for submersible pumps, NSF-61 compliance for static mixers, and missing details for static mixer sizing. The National Park Service is the contracting agency and Yosemite National Park in California is the project location. This exchange of questions and answers aims to provide bidders with needed details to complete their proposals for building a new comfort station and water supply systems.

View the file

Other files

File Type Posted
Sol_140P2022R0038_Amd_0005.pdf PDF
Sol_140P2022R0038_Amd_0004.pdf PDF
YOSE_215798_RFP_140P2022R0038_-_QR_Tracker_Amd4_0004.xlsx XLSX spreadsheet
Sol_140P2022R0038_Amd_0003.pdf PDF
B08_UPDATED_RFP_Body_-_YOSE_215798_Amd3_0003.pdf PDF
YOSE_215798_RFP_140P2022R0038_-_QR_Tracker_Amd3_0003.xlsx XLSX spreadsheet
STO18L80332_-_Bridalveil_Addendum_Letter_Amd3_0003.pdf PDF
Bridalveil_Donation_List_Kohler_Replacements_Amd3_0003.xlsx XLSX spreadsheet
MOD18R78466_Bridalveil_Falls_Report_5-17-18_Amd3_0003.pdf PDF
B08_Attach1_-_UPDATED_Specifications_Amd2_0002.pdf PDF
Sol_140P2022R0038_Amd_0002.pdf PDF
YOSE215798_PrePropolaslSiteWalk_SignIn_-_Amd2_0002.pdf PDF
YOSE_215798_RFP_140P2022R0038_-_QR_Tracker_Amd2_0002.xlsx XLSX spreadsheet
Sol_140P2022R0038_Amd_0001.pdf PDF
B08_Attach1_-_UPDATED_Specifications_Amd1_0001.pdf PDF
B08_RFP_Body_-_YOSE_215798.pdf PDF
B08_Attach1_-_Specifications.pdf PDF
B08_Attach7_-_PastPerformanceQ.docx DOCX document
Sol_140P2022R0038.pdf PDF
B08_Attach5_-_Certification_Form.pdf PDF
B08_Attach2_-_Drawings.pdf PDF
B08_Attach8_-_GeneralReferences.doc DOC document
B08_Attach9_-_SubcontractingWorksheet.xlsx XLSX spreadsheet
B08_Attach3_-_CA20220018_WD.pdf PDF
B08_Attach6_-_ProjectExperienceQ.docx DOCX document
B08_Attach4_-_Implementation_Memo.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0001

Question SetSet NumberQuestionResponse
A1In the Table of Contents in the Specifications, it has Division 03, Division 04, Division 06, Division 07, Division 08, Division 09, and Division 10 as applicable specifications but they were not included. Can you please upload these specifications if they are applicable?Refer to the Solicitation Amendment 0001 document, entitled, "B08_Attach1 - UPDATED Specifications_Amd1.pdf."
2I was reviewing the Spec book for this project and I see Division’s 3 through 12 are missing, can you please review this and advise please?Refer to the Solicitation Amendment 0001 document, entitled, "B08_Attach1 - UPDATED Specifications_Amd1.pdf."
3Plans A4.1 and A7.1 mention bird spikes, but there is no specification. Can Bird-X Stainless Steel Spikes be used for this scope of work?Refer to the Solicitation Amendment 0001 document, entitled, "B08_Attach1 - UPDATED Specifications_Amd1.pdf."
4Division 43 -
The specifications require a Grundfos pump Model #25S20-11, and it has to have a cast iron bowls and bronze impellers. This pump is 100% stainless steel and cannot be rebuilt as required. Please advise?Question Received. Pending Response.
5Division 43 -
4” Submersible pumps – the specifications state that the motor needs to be a single phase 460v, which doesn’t exist per suppliers. All 460v is three phase. Can you please advise on the true voltage and phase required for these pumps?Question Received. Pending Response.
6Division 44 -
Article 1.4.D. requires a certificate of NSF-61 compliance. We cannot meet this requirement as stated. When specified by the engineer we manufacture static mixers from materials that are NSF-61 compliant, but do not carry a certification of NSF compliance for the full assembly. Please advise?Question Received. Pending Response.
7Division 44 -
Articles 2.2.A., 2.2.C., 2.3.A., 2.4.A, 2.5.A., and 2.6.B. all refer to the “Service Conditions” section to provide all the necessary details to design a static mixer. This section does not appear to be included in the specifications or addenda under specification section 44 42 48.Question Received. Pending Response.
8Division 44 -
The static mixer was located on sheet 22 of 27 of the drawings indicating that it is to be 2” with a quantity of 3, ¾” dosing ports. However, the flow rate, available lay length, construction material, pressure rating, CoV, and allowable pressure drop will be required to provide a quote.Question Received. Pending Response.
B9It has been brought to our attention that the project specifications book is missing sections DIV. 3 thru Div. 10. Current specification book goes from section 024100-132110 and finishes from there with the remaining specification sections. Please advise.Refer to the Solicitation Amendment 0001 Attachment document, entitled, "B08_Attach1 - UPDATED Specifications_Amd1.pdf."