This document is an amendment to a solicitation providing additional details for a federal contract opportunity to relocate a boat launch area at Osceola Landing for the Saint Croix National Scenic Riverway in Minnesota.
The amendment answers questions from potential offerors, providing suggestions for sign and interpretive wayside fabricators, and clarifying that the length of railing required for vault toilets is shown in project details. It also states that the contractor must provide all necessary surveying and staking. The proposal due date remains July 6, 2021 at 2:00 PM Central Time. The opportunity is seeking offers to relocate the boat launch area at Osceola Landing for visitor safety and enjoyment under Solicitation Number 140P2021R0060 for the National Park Service.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2021R0060 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
SACN 24469206/01/20210003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/01/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SACN-237990 - Relocate Osceola Landing Boat Launch Area for Visitor Safety and Enjoyment, ST. Croix National Scenic Riverway, Osceola, MN
The purpose of this Amendment #3 is to do the following:
Q1. Provide some potential interested bidders for sign and interpretive wayside fabrication.
A1. Sea Reach, ColorAd, Wood Product Signs, Art Sign Works, Blind Dog Productions (iZone), Gopher Signs,Pannier, 106 Group, 1220 Exhibits, Inc., Amaze Design, Andrew Merriell &
Associates, Blair, Inc., Blue Rhino Studio, Inc., Content Design Collaborative, Eisterhold
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Victoria Nosal
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2021R0060/0003
Associates, Evidence Design, Exhibit Concepts, Inc, ExPlus, Inc., Flying Fish, Formations, Inc., Hadley Exhibits Inc., Hilferty & Associates, Howard Revis Design, Kraemer Design & Production, Inc, Lee H Skolnick, Luci Creative, LLC, Malone
Design/Fabrication, Maltbie, LLC, Pacific Studio, Inc, Quatrefoil Associates, Inc., Reich + Petch
Design International, Riggs Ward Design LC, Roto
Group LLC, Solid Light, Inc., Split Rock Studios, Superior Exhibits & Design, Inc., Taylor Studios, Inc., Tessellate LLC, The Alchemy of Design, LLC, The PRD Group, LLC, West Office Exhibit Design, Whirlwind Creative, Inc., Wilderness Graphics, Inc., Xibitzone, Inc.
Q2. Do you have the length of railing that is needed for the vault toilet (Bid Option 1?)
A2. The length of the grab bars within the vault toilets (Bid Option 1) is shown in details 3/C6.7
(3'-6") and 5/C6.7 (4'-6.5"). There is also railing outside of the northern most vault toilet along the ramp which is a part of the Base Bid and not Bid Option 1. The length of these handrails are 16' 1/4" and 16' 11 1/4". For detail see 3/C6.3.
Q3. Do we need to have an engineer perform surveying and staking, or is that going to be provided/laid out by the NPS?
A3. The contractor shall provide all surveying and staking to confirm locations of utilities and layout of the plan on the ground.
Proposal due date remains July 6th, 2021 at 2:00
MDT.
Legacy Doc #: NPS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .