5Fillable__Form-B08-Solit-PSP-Vol-II-PriceSched_0001.xlsx
XLSX spreadsheet 36 KB Posted
- Solicitation number
- 140P2021R0060
About this file
This document contains three contract price schedule templates for federal construction projects. The templates provide guidance on submitting pricing for base work and optional line items for projects involving relocating a boat launch area, constructing a visitor center, and designing and building a new structure. Offerors are required to submit pricing for both base work and all optional line items using lump sum pricing or unit prices as specified. Pricing should be rounded to whole dollars. The contract line items include quantities, units of measure, unit prices, extended prices, and total proposed prices for base work and all optional line items. Measurement and payment information is to be included in the project specifications. One template provides additional context for a specific solicitation to relocate a boat launch in a National Scenic Riverway for visitor safety and enjoyment.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 4/25-18 | |||||
| Solicitation Number: 140P2021R0060 | |||||
| PARK - SACN 244692: | |||||
| Developed Area: Osceola Landing Boat Launch Area, Saint Croix National Scenic Riverway | |||||
| Project Title: | Relocate Osceola Landing Boat Launch Area for Vistor Safety and Enjoyment | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. Refer to solicitation section “H” for additional information regarding contract options | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Base Contract Work | 1 | LS | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 ) --------------------------------------------------------------------------------- | $0.00 | ||||
| 2 | OPTION 1 - New Vault Toliets | 1 | LS | $0.00 | |
| 3 | OPTION 2 - New Drinking Fountains | 1 | LS | $0.00 | |
| 4 | OPTION 3 - Concrete Walkway (Osprey Comfort Shelter to Comfort Station) | 1 | LS | $0.00 | |
| 5 | OPTION 4 - Shade Shelter | 1 | LS | $0.00 | |
| 6 | OPTION 5 - Outdoor Access Route | 1 | LS | $0.00 | |
| 7 | OPTION 6 - Day Use Parking - West Side of Road | 1 | LS | $0.00 | |
| 8 | Option 7 - Wayfinding/Orientation Elements | 1 | LS | $0.00 | |
| 9 | Option 8 - Parking Along Day Use Road | 1 | LS | ||
| 10 | Option 9 - Wayside Exhibits | 1 | LS | $0.00 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 2 through 10) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 10) -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-12-18 | |||||
| Solicitation Number: N2011080811 | |||||
| PARK - PMIS (Project Management Information System): YELL 012345 | |||||
| Developed Area: Old Faithful | |||||
| Project Title: Johnstonian Visitors Center | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-12-18 | |||||
| Solicitation Number: N2011080811 | |||||
| PARK - PMIS (Project Management Information System): YELL 012345 | |||||
| Developed Area: Yosemite Valley | |||||
| Project Title: Design and Build a New Structure | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |