B09_Solic_Amend_0002_HAVO_196586_Phase_2_Chiller_Pad_As_Built.pdf

PDF 51 KB Posted

Attached to
Rehabilitate Historic Ohi'a Wing for Visitor Use (Phase 2)
Solicitation number
140P2019R0099
Issued by

About this file

As Built Drawing for Chiller Pad

View the file

Other files

File Type Posted
B09_Solic_Amend_0003_140P2019R0099_SF30.pdf PDF
B09_Solic_Amend_0002_140P2019R0099_SF30.pdf PDF
B09_Solic_Amend_0002_DB_WD_HI20190001_10-25-19.pdf PDF
B09_Solic_Amend_0001_140P2019R0099_SF30.pdf PDF
B09_Solic_Amend_0001_DB_WD_HI20190001_10-4-19.pdf PDF
B09_Solic_Amend_0001_PreProp_Sign_In.pdf PDF
A06_Drawings_HAVO_196586_Sheets_66_-_70.pdf PDF
B08_Solit_PSP_Cover.rtf RTF text file
B08_Solit_PSP_Vol_II_GenRefs.doc DOC document
A06_Drawings_HAVO_196586_Sheets_41_-_50.pdf PDF
B08_Solit_PSP_Vol_II_Equals.doc DOC document
A06_Drawings_HAVO_196586_Sheets_21_-_30.pdf PDF
A06_Specifications_HAVO_Phase_2_Design_Services.pdf PDF
B08_Solit_PSP_Vol_II_PriceSched.xlsx XLSX spreadsheet
B03_Const_Wage_Decision_HI20190001.pdf PDF
B08_Solic_140P2019R0099_SF_1442_&_Clauses.pdf PDF
A06_Drawings_HAVO_196586_Sheets_71_-_80.pdf PDF
E15_Deliverables_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Solic_SF24.pdf PDF
A06_Drawings_HAVO_196586_Sheets_81_-_92.pdf PDF
B08_Solit_PSP_Vol_II_HazMat.doc DOC document
A06_Drawings_HAVO_196586_Sheets_11_-_20.pdf PDF
A06_Drawings_HAVO_196586_Sheets_31_-_40.pdf PDF
A06_Drawings_HAVO_196586_Sheets_1_-_10.pdf PDF
A06_Drawings_HAVO_196586_Sheet_65.pdf PDF
A06_Drawings_HAVO_196586_Sheets_61_-_64.pdf PDF
B08_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
A06_Drawings_HAVO_196586_Sheets_51_-_60.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

11' 8"

15' 2"

1' 0" min

0' 8" +2 -0

6' 4"

1' 7 1/2"

2' 6"

0' 9"

Drop in anchor locations for Chiller Unit

Hydronic Line Pipe Sleeve

#4 Epoxy coated rebar on 12" centers max

Switch and GFI TBD

0' 1 1/2" Min

0' 1 1/2" Min

0' 6"

Detail A

Estimated Final Elevation: 3965.14 ft

HAVO - Concrete Pad for Air Cooled Chiller - Rev 1 Scale 1:20

Kahea Oval

Kahea Callout

SWITCH/GFCI LOCATION

Kahea Oval

Kahea Line

Kahea Oval

Kahea Oval

Kahea Callout

MAIN SHUTOFF

Kahea Line

Kahea Oval

Kahea Oval

Kahea Callout

CHILLER COMMUNICATION

LINE

Kahea Line

Kahea Line

Kahea Line

File details come from the government source that posted it.