B09_Amendment_0003_SF30.pdf
PDF 160 KB Posted
- Attached to
- Replace Failing Wawona Campground Restroom Leachfields with Connection to Wawona YOSE 197065
- Solicitation number
- 140P2019R0073
About this file
Amendment 0003
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2019R0073 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
DSC
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
YOSE 19706508/14/20190003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/23/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of the amendment is to provide questions and answers received since amendment
0002, SF24 Bid Bond form(Attachment #1), word version of the Past Performance Questionnaire
(Attachment #2) and the Subcontracting Percentage worksheet(attachment #3).
Legacy Doc #: NPS
Period of Performance: 10/01/2019 to 05/31/2020
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Todd Stackhouse
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140P2019R0073, Amendment 0003
1) Is there a specific form for the Bid Bond
a. Yes the SF24 was omitted in error. It was added via amendment 0003 (attachment #1)
2) Can you provide a plan holder list?
a. There is no plan holder list. All documents have been posted to FBO.gov.
3) Do we need to complete Section H Special Clauses and submit them with the proposal? If so, should this be submitted with Volume 2?
a. Per Section L Factor 1B of the solicitation offerors should submit resumes for key personnel as identified in Section H. The government will fill in Section H at time of award with the information provided in Vol I
4) Do we need to complete and submit the fill-in provided with 52.219-28? If so, should this be submitted with Volume 2?
a. Contractor can fill in the provided 52.219-28 or they can paste it into their Vol. II
5) Volume 1, Technical Proposal indicates submission of three bound hard copies. Should offerors assume this means submission of an original + 2 hard copies?
a. Yes
6) Volume 1, Technical Proposal, Subfactor 1B Key Personnel references several positions that vary from the positions identified in Section H. Can you please confirm these titles from Section L and H are referring to the same position?
• Section L “Superintendent” and Section H “Job-site Superintendent”
• Section L “On-site Quality Control Specialist” and Section H “QC Manager”
• Section L “On-site Safety Specialist and Section H “Safety Manager”
a. Yes, See answer to question 3
7) Volume 1, Technical Proposal. Subfactor 2B-Schedule states to assume NTP of “TBD.” Can you please provide the NTP date so we can accurately prepare the project-specific schedule?
a. NTP will be issued after award.
8) Volume 1, Technical Proposal, Subfactor 3B Safety states to “Include the names, resumes, and specific safety training completed (i.e., OSHA, etc.) for the proposed Project Site Safety Manager for this project.” Is the position of Project Site Safety Manager meant to be the same position/individual as the On-Site Safety Specialist noted under Subfactor 1B in Section L and the Safety Manager noted in Section H?
a. Yes they are meant to be the same person.
9) Volume 1, Technical Proposal, Factor 4 Past Performance requires submission of a Past Performance Questionnaire (PPQ) or a PPIRS evaluation. If a PPIRS evaluation is not available, is it acceptable to submit a previously completed PPQ rather than burdening references with a duplicate request to complete a new PPQ?
140P2019R0073, Amendment 0003
a. PPQ must in the format listed in the solicitation.
10) The Past Performance Questionnaire format provided with Attachment 4 – PSP Forms does not show specific ratings for selection under the Evaluation Areas. Rather, the Rating column shows “Choose an item.” Will an updated Past Performance Questionnaire format be provided for completion?
a. A word version was posted with amendment 0003 (attachment #2)
11) Volume II, Business and Price Proposal reference a Subcontracting Percentage Worksheet (Set-aside) on RFP page 160 as part of Section M but no reference is made to this section in Section L. Further, Attachment 4 provides a Small Business Subcontracting Plan format but does not provide a Subcontracting Percentage Worksheet. Can you please clarify this worksheet is required as part of offeror submittals? If so, can you please provide this worksheet? Please confirm that this worksheet is NOT required to be submitted by small business concerns.
a. The Subcontracting Percentage worksheet was posted as part of amendment 0003.
12) A format was not provided for the Proposed Equals within the Attachment 4 PSP Forms. Can you please provide this form?
a. Proposed equals submission will be submitted after award as part of the submittal process.
13) Volume 1, Technical Proposal, Subfactor 1B Key Personnel states that there is not a preprinted form for this submittal. However, Attachment 4, PSP Forms provides a Key Personnel Qualifications format. Please confirm that we should submit resumes for Subfactor 1B using the Key Personnel Qualifications format.
a. Confirmed, please use format in PSP for key personnel.
File details come from the government source that posted it.