VICK_209256_-_PREBID_MEETING_07.18.2019_-_REVISED.pdf
PDF 2 MB Posted
- Solicitation number
- 140P2019R0063
About this file
Architect's Site Presentation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Amendment_04_REQD.pdf | ||
| B08_Solit_PSP_Vol_II_GenRefs.doc | DOC document | |
| Key_Personnel.docx | DOCX document | |
| B08_Attch_5_Exp_Qstr.docx | DOCX document | |
| B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc | DOC document | |
| Working_On_Kansas_City_Southern_Railway_Company_Property.pdf | ||
| Questions_from_pre-bid_visit_7-18-19_SS.xlsx | XLSX spreadsheet | |
| B08_Solit_PSP_Vol_I_PastPerf_REQD.docx | DOCX document | |
| B09_Amendment_03_REQD.pdf | ||
| B08_Solit_PSP_Vol_II_HazMat.doc | DOC document | |
| B08_Solit_PSP_Vol_II_Equals.doc | DOC document | |
| VICK_209256_Sign_In_Sheet.pdf | ||
| B09_Amendment_02_REQDX.pdf | ||
| B09_Amendment_01_REQD.pdf | ||
| Att_03_WD_MS20190069_M1_021519.pdf | ||
| Att_02_VICK_209256_-_PROJECT_DRAWINGS_-_JUNE_2019_(2).pdf | ||
| Att_01_VICK_209256_-_PROJECT_SPECIFICATIONS_-_JUNE_2019_(1).pdf | ||
| Att_05_SF24-16.pdf | ||
| B08_Solicitation_140P2019R0063.pdf | ||
| Att_04_Proposed_Submittal_Pkg_Docs.pdf | ||
| B01_Synopsis_PreSolitNotice_5.8.19.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICK 209256 - Stabilize Railroad Redoubt Earthworks Vicksburg National Military Park
VICK 209256 – Stabilize Railroad Redoubt Earthworks
PREBID MEETING
JULY 18, 2019, 9:30 a.m.
Agenda Topics
• Introductions
• Project Description
• Construction Access/Staging
• Key Sections Within Drawings/Specifications
• Required Permits
• Coordination with Kansas City Southern Railway
• Site Visit
Introductions
• Vicksburg National Military Park
• NPS Denver Service Center
• VHB – Civil Engineer
• Terracon – Geotechnical Engineer
Project Description
• Construction of Soldier Pile Wall between Texas State Monument &
Texas Southern Railroad
• Contract Documents
• Construction Drawings
• Project Specifications (including Geotechnical Report)
• Site located adjacent to Texas State Monument and Kansas City
Southern (KCS) Railroad
VISITOR
CENTER
TEXAS
STATE
MEMORIAL
MELBORN
PLACE
CLAY STREET
PROJECT
SITE
Construction Access/Staging
• Primary Access & Materials Deliveries from Melborn Place
• Contractor Trailer to be located on Melborn Place
• Secondary Access through Confederate Avenue (for vehicle parking only)
• Access route east of Texas State Monument can only be used for Mobilizing/Demobilizing Construction Equipment
• All Construction activities to be within Limits of Construction
LIMITED CONSTRUCTION
EQUIPMENT MOBILIZATION/
DEMOBILIZATION ACCESS
TEXAS STATE
MONUMENT
PRIMARY
ACCESS
CONTRACTOR
VEHICLE
PARKING (NO
DELIVERIES
EQUIPMENT
PARKING)
MELBORN
PLACE
CONFEDERATE
AVENUE
PROJECT AREA
Sheet C4 – Access Staging & Erosion Control Plan
Construction Trailer Location – Melborn Place (Looking North)
Vehicle Parking Area – Confederate Avenue (Looking South)
Mobilization/Demobilization Access Only – Confederate Avenue
(Looking East)
Key Sections Within Drawings/Specifications
• Top of Slope located within 8’-10’ of the Texas State Memorial
• Review Geotechnical Engineering Report (Appendix A of Specifications)
• Fill Lift Thickness Requirements
• Minimum Compaction Requirements
• Moisture Content
• See Inspection & Monitoring Notes on Sheet C1
• See Specification Section 316616.56 – Permanently-Anchored Soldier
Pile Wall
• Section 1.4 – Submittals
• Section 1.5 – Contractor Alternate Designs
• Section 1.7 – Qualifications
• Section 3.1 – Soldier Pile Installation Plan
• Section 3.3 – Soldier Pile Placement & Alignment
• Section 3.10 – Installation
Key Sections Within Drawings/Specifications (Cont.)
• See Specification Section 31 80 00 – Structural Monitoring
• Section 1.4C – Monitoring & Instrument Installation Plan
• Section 1.4F – Data Summary Report to be generated by geotechnical engineer registered in MS
• Section 3.2D – Movement Monitoring
• Section 3.2E – Vibration Monitoring
Texas State Monument Close Proximity to Slope
Sheet C7 – Soldier Pile Wall Profile
Soldier Pile Wall Typical Section
Contractor Required Permits
• Street Closure Permit – City of Vicksburg/MDOT
• Heavy Load Road Permit – City of Vicksburg/MDOT/Park
• Large Construction General Permit (LCGP)/Stormwater Pollution
Prevention Permit – MDEQ
• Kansas City Southern Right-Of-Entry Permit – Kansas City Southern
• Archeological Monitor Permit – NPS VICK (Park)
Government Furnished Permit
• Park has acquired USCOE Nationwide Permit 33 (Appendix C)
Project Area (view from top of the slope)
Project Area (view from bottom KCS Railroad)
Questions shall be submitted in writing to the Contracting Officer
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
File details come from the government source that posted it.