8-B08_PSP_VOL_II_ContractPriceSchedule.xls

XLS spreadsheet 81 KB Posted

Attached to
Plaza Paver System Replacement and Visitor Center Rehabilitation
Solicitation number
140P2019R0013
Issued by

About this file

Fillable form Contract Price Schedule

View the file

Other files

File Type Posted
SF30_Amendment_2.pdf PDF
MORU_219680_RFI_Register_20190222.pdf PDF
MORU_219680_RFI_Register_20190219.1.xlsx XLSX spreadsheet
E09_PPT_Pre-Proposalr1.pdf PDF
SF30.pdf PDF
MORU_219680_Pre_Bid_Photo_Presentation.pdf PDF
Prebid_Sign-in_Sheet.pdf PDF
4-B08_General_Decision_Bldg.pdf PDF
9-B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
3-B08_Drwgs.pdf PDF
2-B08_Vol_2_SPECS_Div_22_thru_33.pdf PDF
5-B08_General_Decision_Heavy-Hwy.pdf PDF
7-B08_PSP_VOL_II.pdf PDF
1-B08_Vol_1_SPECS_Div_01_thru_21.pdf PDF
0-B08_SF1442_Clauses.pdf PDF
6-B08_PSP_VOL_1.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P2019R0013
PARK - PMIS: MORU - 219680
DEVELOPED AREA: Mount Rushmore National Memorial
PROJECT TITLE: Plaza Paver Replacement and Visitor Center Rehabilitation
Notice: Refer to Section H, Special Clause 1, Option for Additional Services—Separately Priced Line Items, offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. At the option of the Government, the period for exercise of options at the proposed prices shall extend 90 calendar days from the date of award.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Base Bid (Plaza Paver Replacement and Visitor Center Improvements)1Lump Sum$0.00$0.00
2Bid Option 1 – Washington Side Visitor Center Restroom Rehabilitation1Lump Sum$0.00$0.00
3Bid Option 2 – Partial Grandview Terrace Colonnade Modifications1Lump Sum$0.00$0.00
4Bid Option 3 – New Finishes in Staff Area of Visitor Center1Lump Sum$0.00$0.00
5Bid Option 4 – Parking Garage Mini Plaza Replacement1Lump Sum$0.00$0.00
6Bid Option 5 – Visitor Center Entrance Plaza1Lump Sum$0.00$0.00
TOTAL BASE PRICE (Contract Line Item Number 1) --------------------------------------------------------------------$0.00
TOTAL BID OPTION PRICEs (Contract Line Item Numbers 2 through 6) -----------------------------------------$0.00
TOTAL PROPOSED PRICE – BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 6) ---------$0.00
All measurement and payment information is included in the project specifications, Section 012700.

&RPARK - PMIS

CPS - &P

Design-Bid-Build Sample

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: N2011080811
PARK - PMIS: YELL 012345
DEVELOPED AREA: Old Faithful
PROJECT TITLE: Johnstonian Visitors Center
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Visitors Center1Lump Sum$0.00
2Water Line400L.F.- 0
3Sanitary Sewer line200L.F.- 0
4Rock Excavation150C.Y.- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum$ - 0
6OPTION B, Photovoltaic system1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 5 and 6) -------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 6) -------------$0.00
All measurement and payment information is included in the project specifications, Section 012700.

&RYELL - 012345

CPS - &P

Design-Build Sample

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: N2011080811
PARK - PMIS: YOSE 012345
DEVELOPED AREA: Yosemite Valley
PROJECT TITLE: Design and Build a New Structure
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Design1Lump Sum$0.00
2Construction1Lump Sum$0.00
TOTAL BASE PRICE (Contract Line Item Number 1 through 2) ---------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum$0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 ) -----------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 3) ------------$0.00