140P2018R0076 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
GRCA 16005707/09/20180004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/08/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purposes of Amendment 0004 are to:
1) Address contractor questions and government responses.
2) Notify offerors that a revised price schedule may be submitted to the Contracting
Officer at jason_longshore@nps.gov anytime before the proposal due date and time. Volume I and Volume II of the proposal package shall be sent via USB. If submitting a revised price schedule, offerors need only submit the Contract Price Schedule from Volume II.
The question deadline date remains unchanged as July 13, 2018, 3:00pm MT. Questions received after this date will not be answered. The proposal due date remains unchanged as
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jason Longshore
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2018R0076/0004
July 20, 2018, 2:00pm MT.
All other terms and conditions remain unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Question and Answer
Spreadsheet
140P2018R0076 /
GRCA 160057
Question No. Sheet or Reference Question Response Amendment Answered
However, some clarification is needed on the park shutdown from October 15‐
April 15. Does the 6 month shutdown affect the 244 calendar day allotment to complete the project? Will work on the project be allowed to continue during the park shutdown? Thank you.
Page 1 of the SF1442 states, "
This project will have a winter shutdown which is anticipated to occur between October 15, 2018 and April 15, 2019. This shutdown will have no impact on the actual construction duration of 244 days as cited in Clause 52.211‐10."
In other words, the construction period of performance "clock" stops during the winter shutdown.
Are we allowed to work during winter shutdown? NO
No
Does the winter shutdown impact the
244 calendar days to complete the work?
No ‐ please see response to question #1 above 0004
What is the anticipated period of performance?
Sept 2018 ‐ Oct 2019
Do we need to provide the
Subcontractor Reference form with our proposal? If so, where should it go?
Yes, please include subcontractor references.
They may be submitted as a part of the Proposal
Submission Package Volume I ‐
Page 137 of 151 of the RFP states that, "Volume II shall be submitted in an original"; however, page 136 says to submit the proposal on a USB. Can you please confirm that we are to submit both the Technical and Price Volumes on a USB?
Please submit the proposal via
USB only.
Page 137 of 151 of the RFP indicates that Proposed Equals and Hazardous
Materials are part of Volume I ‐
Technical Proposal; however, the
Proposal Submission Package shows that that Proposed Equals and
Hazardous Equals should be in the Price
Volume. Can you please clarify?
Please include the Proposed
Equals and Hazardous
Materials forms with the
Technical Volume.
Page 137 of 151 of the RFP asks us to submit resumes. Are we to use the Key
Personnel Qualifications form for the resumes?
The Key Personnel
Qualifications form is provided as a template should the offeror wish to use it.
Resumes are acceptable, as well.
Could the National Park Service provide a layered PDF of the drawings for the project?
This was provided in
Amendment 00003.
Drawing Page C203 Area south of
Generator Building, can the location of the fire hydrant be moved closer to the
Generator Building in the island? Also there was mentions by the Park Staff that the dirt loading dock may be removed. Will the loading dock be removed by NPS or Contractor?
Depending on actual field conditions at the time of construction, the locations of the fire hydrant in question may change. For proposal purposes, assume this dock remains as currently situated.
Please provide the survey data used yesterday for the pre‐bid walk.
Other than the survey information already provided in the construction documents, the prospective contractor is responsible for undertaking all surveying required to properly complete this project.
What are the requirements for reclamation of the staging areas?
The restoration of all areas disturbed during the course of this project, including staging areas, are to comply with all contract requirements.
At the fire station where the valve is replaced in the approach is there an alternative access to the area?
There is another access road to the fire station off the main road. As noted on the contract documents, the
Contractor shall submit for review and approval a traffic control plan which shall identify all in road‐way work with a specific plan to manage traffic in each such location, and the expected duration and type of impact to traffic.
Can one lane roads be closed during construction?
As noted on the contract documents, the Contractor shall submit for review and approval a traffic control plan which shall identify all in road‐ way work with a specific plan to manage traffic in each such location, and the expected duration and type of impact to traffic.
What are the hours of production in the campground, EDR and hotel locations?
Work hour limits are identified in spec section 01 11 00 ‐ 1.8. 0004
What are the average traffic counts per day on the main road to the Lodge?
In 2017, there were approximately 135,000 vehicles to North Rim with peak traffic count in July:
May ‐ 14,000
June ‐ 24,500
July ‐ 29,285
August ‐ 24,265
September ‐ 24,958
October ‐ 18,100
Can the excess excavated materials be disposed of near the project or does it have to be disposed of off of National
Park Service Property?
Disposal of surplus soil is identified in specification section 31 23 33 section 3.15.
Factor 2 ‐ Past Performance requires us to submit a Past Performance
Questionnaire for each highlighted project. In order not to over‐burden our clients with multiple questionnaires, would the government accept a CCASS, CPARS and/or a previously completed
PPQ provided with our proposal in lieu of the Past Performance Questionnaire issued with the RFP?
The Government is requesting the Past Performance
Questionnaire as stated in the
RFP.
Contracting Officer instructions: Offerors are allowed to submit a revised price schedule to the
Contracting Officer at jason_longshore@nps.gov anytime before the proposal due date and time. Volume I and Volume II of the proposal package shall be sent via USB.
If submitting a revised price schedule, offerors need only submit the Contract Price
Schedule from Volume II.