SCOPE OF WORK
KATM 245181A
NATIONAL PARK SERVICE
KATMAI NATIONAL PARK & PRESERVE
REINSTALL FIRE SUPPRESSION SYSTEMS IN FAA PERMANENT HOUSING
KING SALMON, ALASKA
REVISED 1/18/2018
Background The purpose of this contract is to provide fire suppression systems for the permanent employee housing located in King Salmon, Alaska, which supports Katmai National Park & Preserve (KATM).
Objectives The Contractor shall furnish the necessary personnel, material, equipment, and services (except as otherwise specified), to install new NFPA 13D wet-pipe fire suppression systems to the permanent housing units located at the FAA housing compound in King Salmon, Alaska. This project will include a total of nine units, five single family structures, and two duplex buildings. The housing units are shown on the attached Housing Site Survey Control and Key Map. The dwelling addresses have changed since the map was created and are indicated here as original unit numbers and (current unit numbers). The units are as follows A6 (139), A27 (150), A40 (158), A47 (161), A50 (164), D10 & D11 (142/143), and D48 & D49 (162/163).
During the performance of the work, the contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness and progress of work. The units will be occupied by tenants, and coordination will be necessary to complete the work. The park will require a 48 hour notice to the primary POC prior to any on-site activities. The tenants will not be present during daytime hours, but the residence will contain furnishings and personal property. Personnel will be provided to ensure work areas are clear of personal artifacts. The mechanical rooms are separate and isolated from the living space.
This Scope of Work includes one site visit for the purpose of site inspection and one follow up trip for the purpose of installing new fire suppression systems. It is the responsibility of the contractor to verify that all of the information provided in this solicitation is accurate.
The sprinkler system components within the living spaces are to be concealed. The surface mounted distribution piping is to be contained within a pre-manufactured soffit system as specified.
All work is to be in accordance with the Scope of Work, Specifications, and Contract Drawings, as well as all applicable Codes and Standards. Contractor shall, without additional expense to the Government, be responsible for obtaining necessary licenses and permits, and for complying with any and all applicable federal, state, and borough laws, codes, and regulations pertaining to the performance of the service that is to be rendered.
The Contractor shall take proper safety and health precautions to protect workers, the public, and property. The Contractor shall provide the Government all requested reports, and supporting material developed during the performance of the work. The Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness and progress of work. The Contractor shall ensure protection during work, and restoration (if damaged), of building finishes, tenant property, furnishings, etc.
Description of Tasks:
1. Install Wet Fire Suppression systems to meet NFPA 13D requirements. Systems to be installed in nine (9) residential units in King Salmon, Alaska.
2. Fire suppression system piping and components located within the living space shall be concealed using a soffit system as specified.
3. Upon completion of work, contractor shall test all systems, and alarms to ensure proper function, and shall provide commissioning service to ensure all facets of the newly constructed systems are operational. Testing and inspection shall be recorded on NPS forms included in this solicitation.
4. Provide current inspection certificates for all nine (9) newly installed fire suppression systems.
5. Upon completion, contractor shall inventory the newly installed fire suppression systems on government provided inventory forms, and provide photographs of the completed installation.
List of Equipment
The Contractor shall furnish all labor, management, supplies, equipment and material, and perform all tasks necessary for performance of the work.
Government Furnished Materials
Government to supply standard utilities, including water, wastewater, and electricity. Personnel will be provided to clear the work areas located in the living spaces of personal artifacts and belongings of the residents. Government personnel will also be assigned to monitor the facilities when work is in progress and take responsibility for the security of the occupants belongings.
Hazardous Materials
No hazardous materials have been identified for this project.
Re-performance of Service
When service performed does not conform to contract requirements, or when service was not performed in a specific area, the contractor shall perform or re-perform the service in conformity with contract requirements at no additional cost to the government.
Non-Payment for Additional Work
Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than the Contracting Officer, shall be performed at the financial risk of the contractor. Only the Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.
Quality Assurance
The Government may utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this Scope of Work in an acceptable manner. The use or nonuse of any quality assurance methods by the Government will not constitute a waiver of or excuse from contract requirements. The Government may implement or change quality assurance measures at any time during the term of the contract.
Period of Performance
The anticipated period of performance for the resultant contract is from May 1, 2018 through November 1, 2018.
Warranty
Provide one-year warranty from date of substantial completion.
References
General: Comply with latest appropriate standards, as listed here and in the Specifications.
American Society of Mechanical Engineers: ASME.
American Society for Testing and Materials: ASTM.
American Welding Society: AWS.
American Water Works Association: AWWA.
National Fire Protection Association: NFPA.
Underwriter Laboratories, Inc.: U.L.
Factory Mutual Standards: FM.
International Building Code: IBC
POINT OF CONTACT:
Contracting Officer’s Representative (COR) for Technical Support:
| Simon Evans, PE |
| National Park Service |
| 240 W 5th Avenue |
| Anchorage, AK 99501 |
| simon_evans@nps.gov |
| Tel: (907)644-3391 |
Contracting Office for Contractual Support:
Sharon Miner – Contracting Officer National Park Service 12795 W. Alameda Pkwy Lakewood, CO 80228 sharon_miner@nps.gov Tel: (303) 969-2562
Contracting Officer’s Authority:
The Contracting Officer is the only person with the authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to:
(1) Direct or negotiate any changes in the Scope of Work or specifications;
(2) Modify or extend the period of performance;
(3) Change the delivery schedule; or
(4) Otherwise change any terms and conditions of this contract.
The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract and not withstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
ATTACHMENTS:
Attachment 1A: FAA Housing Drawings Abbreviated Set.pdf Attachment 1B: Fire Suppression Specs 21 05 00.pdf Attachment 1C: General Specs 01 00 00.pdf Attachment 1D: Housing Site and Key Map Revised.pdf Attachment 1E: Photos.pdf Attachment 1F: 2018 AKR Structural Fire Inventory Data Collection ELECTRONIC Attachment 1G: Structural Fire Inventory Data Collection Instructions 2018_0118 Attachment 1H: Structural Fire Inspection and Testing Forms Attachment 1I: CM-16 Submittal Form
| DSC - CONTRACTOR ACCIDENT/PROPERTY DAMAGE |
| Record: |
| REPORT |
| Date: |
Name:
Trade:
Social Security No.:
Birth date:
Date of Accident:
Time of Accident:
Contractor:
Project:
Location:
Description of Accident: (BE SPECIFIC. DESCRIBE WHAT HAPPENED, WHERE.):
What was employee doing when injured?
Specific body parts injured?
Type of injury (i.e. Puncture, sprain, fracture, illness, etc)
| First Aid? |
| Yes |
No
| Medical Clinic? |
| Yes |
No
| Hospitalized? |
| Yes |
No
| Is time loss expected? |
| Yes |
No
How long?
Environmental Factors:
| Property Damage Involved? |
| Yes |
No
Describe:
Estimated dollar amount of Damages:
Corrective Action Taken:
Contractor Reporting:
Date:
Project Inspector Reporting:
Date:
ATTACH COPIES OF ANY ADDITIONAL INFORMATION (& photos)
COMMENTS
Form No. CM-22 (1/00)
KATM 245181A SOW