- ORPI RADIO TOWER INSTALLALLATION Federal contract opportunity
- Solicitation number
- 140P1525Q0156
About this file
This document is an Amendment (Amendment 0001) to a federal solicitation for a radio tower installation project at Organ Pipe Cactus National Monument (ORPI). The solicitation (140P1525Q0156) is a Total Small Business Set-Aside for installing a 30' communications tower, which includes excavating and pouring a concrete foundation, assembling and erecting the tower, and installing grounding hardware. The amendment provides official government responses to 13 contractor questions, clarifying details such as tower storage, antenna and coax installation responsibilities, foundation and grounding requirements, and utility locating. The project requires a reinforced concrete pad with embedded attachment bolts, a minimum of two 8-ft copper ground rods, and must comply with local and national electrical codes. No site visit is mandatory, but one is scheduled for July 29, 2025 at 10:00am Arizona Time at the ORPI Visitor Center. Payment bonds are required for awards over $35,000, which must be submitted within ten days of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1525Q0156.pdf | ||
| B08_Attachment_5_-_140P1525Q0156_Price_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P1525Q0156 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PIA
Flagstaff AZ 86001-2694 1824 S Thompson St, Ste 200 NPS, IMR - Arizona MABO
07/14/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/14/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AMENDMENT 0001 is issued to provide Government responses to questions received. Must acknowledge amendment with quote package.
Due date and time remains unchanged
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jessica Owens
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - CENTRAL
1849 C Street NW Washington, DC 20240
Solicitation #: 140P1525Q0156
Amendment #: 0001
ORPI Radio Tower Installation
Questions and Government Responses listed below:
Question # Question Answer/Response 1 Can you please expand on the grounding requirements?
A solid ground could be obtained from 2- 8ft driven copper rods. Detailed in the Specs on page
6 & 8 & SOW
2 Is antenna and coax installation the contractor’s responsibility?
Yes. The cable will be anchored to the corner of the building with an eye bolt, then it runs down the eave of the building to the entrance location.
3 Where is the tower stored?
Currently in our gravel pit area.
4 Will the tower be delivered or will we need to pick it up?
ORPI maintenance can deliver it.
5 Is the site visit mandatory?
No (but helpful)
6 Are there any soils report or Geotech data on the proposed location for the foundation.
The site area has approximately 12ft of fill that was brought in previous to staging the modular buildings.
7 What foundation design is required? – Is this pending the Geotech investigation? If so, who and when will the Geotech be performed?
Reinforced Concrete pad, detailed in the Specs on page 6 & 8 of the statement of work.
8 What grounding design is required?
This is an Electrical installation & would need a minimum of 2-8ft copper driven ground rods.
Detailed in the Specs & SOW.
9 What is the rebar design for the foundation?
Defined in the specifications on pages 6 & 8 reinforced pad as well as attachment bolts embedded for tower placement.
10 Please confirm that we are only including the tower and foundation install, not also relocating the equipment currently on the VPR trailer to the tower.
The Tower will be delivered by the Maintenance Dept. Requiring a reinforced base with embedded bolt attachment for the tower, the Cable will be attached to the building & installed along the eaves to the point of entry.
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - CENTRAL
1849 C Street NW Washington, DC 20240
11 Please confirm whether utility locating will be required at the new tower location.
The Only Utility in the area is a waterline, The Park Maintenance people will mark that.
12 Please provide the Grounding Plan for this project.
The Installation must be grounded in accordance with Local and National codes. Resistance to ground must not exceed 10 ohms.
13 Please confirm that no special inspections are required as mentioned on site walk.
There will be a final inspection with punch list towards the completion of the project to ensure specifications & that the system works as designed.