SUCR Inspect & Clean Potable Water Tank
Solicitation number
140P1525Q0043
Issued by

About this file

This document is an Amendment (0001) to Solicitation 140P1525Q0043 for inspecting and cleaning a 50,000-gallon potable water storage tank at Sunset Crater National Monument in Flagstaff, Arizona. The amendment includes responses to contractor questions and updates to the Statement of Work, removing the "Inspection Reports" section. The project requires a comprehensive tank inspection using ROV (Remotely Operated Vehicle) or diver methods, including exterior and interior examinations, testing (mil thickness, cross hatch, ultrasonic), sediment removal, and complete disinfection following AWWA standards.

Key project requirements include: submitting a detailed written report with photographs and recommendations, providing a safety plan, using fall protection equipment, and performing bacteriological testing after disinfection. Contractors must have at least three years of experience in potable water tank inspection and cleaning. The work must comply with Arizona State Department of Environmental Quality, NPS Public Health, AWWA, OSHA, EPA, and NFPA standards. A pre-award site visit is encouraged, and contractors must minimize environmental impact during the project. The solicitation is issued by the Department of the Interior National Park Service Intermountain Region.

View the file

Other files

File Type Posted
Sol_140P1525Q0043.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P1525Q0043 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PIA

Flagstaff AZ 86001-2694 1824 S Thompson St, Ste 200 NPS, IMR - Arizona MABO

02/21/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/21/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment, 0001, is to:

1. Post responses to questions received

2. Update the SOW to remove the "Inspection Reports" section

The hour and date for receipt of offers remains the same

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rebecca Myers

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation #: 140P1525Q0043

Amendment #: 01

SUCR- Inspect and Clean Potable Water Tank

Questions and Answers listed below:

QUESTIONS:

Question # Question Answer/Response

1. We were in this tank with an ROV about a year ago

December and there was not any sediment seen in the pictures or photographs. Do we have any reason to believe that has changed?

We don't have a reason this may have changed, but it was recommended that we do a follow-up inspection by our last Utility Operator.

2. If the tank is full of water, we will have to empty it, do you want that water disposed of?

If not do you want the water put into holding tanks so the big tank can be cleaned and inspected and put back into the big tank?

The intent of this contract is to not drain the tank for inspection, but to use either divers or robotics to inspect the tanks. If for some reason the tank does need to be drained, then yes, they would like to save the water in a holding tank.

3. On the Inspection Report requirements:

Inspection Reports The contractor shall prepare a binder with O&M manuals, and product information of the new well pump, and associated components.

Is the above a typo left from a previous solicitation? Can we disregard it?

Yes, please disregard. The SOW will be updated with this amendment (01).

National Park Service U.S. Department of the Interior

Flagstaff Area National Monuments Division of Facility Management

6400 N HWY 89

Flagstaff, AZ 86004

Scope of work Potable Water Storage Tank Cleaning & Inspection Flagstaff Area National Monuments – Sunset Crater National Monument

General Project Description

This project will inspect and clean the 50,000-gallon Sunset Crater National Monument elevated potable water tank. All work to comply with Arizona State Department of Environmental Quality, NPS Public Health, AWWA, and OSHA standards.

Scope of Services

1. Perform interior in-service inspection using ROV Inspection Robot, divers, or a combination of the two methods. Perform exterior inspection by trained personnel abiding by OSHA regulations utilizing fall protection equipment. ROV equipment to be disinfected before use in water tank interior.

2. Check for deficiencies and meet tank inspection requirements of OSHA, EPA, AWWA and

NFPA. Review all structural, sanitary, safety, security and coating conditions. Examine ladders, shell, roof, vent, manways, welds, seams, foundation, anchors, safety systems, hatch, and external overflow. Take photographs of all deficiencies and tank appurtenances.

3. Perform the following tests during the inspection:

a. Mil thickness test (coating thickness) – Exterior only

b. Cross hatch test (paint adhesion) – Exterior only

c. Ultra-sonic test of tank shell– Exterior only

4. Perform interior in-service cleanout of sediment from the tank floors using ROV equipment, divers, or a combination of the two methods.

5. You are encouraged to visit the site in order to determine the proper equipment for this work.

6. Tanks, Clearwell, and Vaults will remain as full as possible during inspections.

7. Furnish a certificate of insurance covering Workman’s Compensation, Occupational

Disease, Employer’s Liability, and General Liability.

8. Submit a detailed written report of findings with photographs, DVD of inspection, corrective recommendations and cost estimates. The report shall be signed by registered personnel. Two paper copies and an electronic copy of the report shall be submitted to this office within one calendar week after completing all inspection services.

9. Contractor have at least three (3) years of experience in inspecting and cleaning potable water tanks

Site Location This project is located in and directly adjacent to the developed Visitor Center and Housing Area at Sunset Crater National Monument (SUCR) in Coconino County, Arizona. The SUCR Visitor Center area is located at 6082 Sunset Crater Rd. Flagstaff, AZ, 86004.

A pre- award site visit is greatly encouraged to determine site conditions and site limitations to conventional equipment. The contractor shall make every effort to minimize impact to the site and the natural surroundings by limiting off road travel. The date and time of the site visit will be noted in the solicitation sent to the Contractors.

Description of Potable Storage Tanks

Safety Requirements Tank Information:

1. The Elevated tank is equipped with ladders that have on-center cable catch systems for fall protection. Bidding contractors will have access to the tank location during the site visit. NPS supervisors and utility system operators will be available during this time. Contractors will be able to view the inside of the tank while it is empty, fall protection equipment will be required for climbing/ accessing the tank. Fall protection equipment for the site visit will be the responsibility of the contractor, no equipment will be provided by the NPS. The tank interior can be viewed from the top hatch. Due to the confined space permit requirements, contractors may not be able to enter the tank.

2. The NPS will not provide any fall protection/ confined space equipment for site visits or project.

3. Bidding contractors shall address questions and any concerns regarding fall protection before arriving to the site. No access will be granted without proper fall protection equipment.

Safety Plan

1. A safety site plan is required, safety plans shall be subject to review by contracting officials, and designated NPS personnel. The contractor shall not begin any onsite work until plan is received and reviewed by contracting officials.

2. The Contractor shall comply with all health and safety regulations and requirements of OSHA (or State Health and Safety Regulatory Agency), SSPC-PA Guide 3, and the paint and abrasive manufacturers.

3. All rigging and fall protection equipment used shall meet or exceed OSHA/ANSI standards.

4. Provide adequate illumination (SSPC-Guide 12) for the task being performed.

5. Contractor shall be responsible for the permitted confined space and shall adhere to all OSHA requirements regarding confined space including providing all equipment and personnel necessary.

6. The Contractor shall maintain a clean work area and have fire extinguishers on-hand.

Tank Sediment Removal and Cleaning

Tank sediment shall be collected and removed from the interior. Debris and Material can be removed through the manway entrances, slurry water from power washing can be discharged through the tank drain outlet. Any slurry or debris in which may cause clogging of tank drain shall be removed prior to using tank drainage system.

A standard Yard Hydrant is Available onsite for water need to clean tank interiors. Yard Hydrant has a ¾” hose bib connection for residential hose connections.

Tank Inspection

A Comprehensive tank Inspection Shall be performed after tank has been cleaned. Inspector shall furnish a detailed report providing recommendations of potential repairs needed to the National Park Service.

Disinfection of Water Storage Facility

The work of this section consists of the disinfection of all portions of the water storage tanks that may have become contaminated during cleaning activities. Disinfection execution will be in accordance with AWWA 652-19, Disinfection of Water Storage Facilities

Disinfection shall not take place until tank sealant is fully cured.

Forms of Chlorine

Liquid Chlorine as specified in AWWA C652-19 Sodium hypochlorite as specified in AWWA C652-19

Execution

Acceptable Methods of Chlorination Shall be:

Chlorination method 1 as specified in AWWA C652-19 Chlorination method 2 as specified in AWWA C652-19 Chlorination method 3 as specified in AWWA C652-19 Application Methods shall be consistent with AWWA C652-19, Acceptable methods shall be Chemical feed pump, spraying, brushing, or painting of all water contact surfaces

Disposal of chlorinated water

Dispose of chlorinated water by neutralizing chlorine with a chemical listed on table C.1 of AWWA C651 and flushing onto ground surface at locations approved by park facility manger.

Bacteriological Examination

After the tank has been thoroughly flushed and disinfected, take samples from representative point in storage facility, according to AWWA C652. Submit samples to a state certified lab for bacteriological examination. If the result is unsatisfactory, repeat the disinfection procedure until satisfactory results are obtained.

Verification of Existing Conditions and Utility Location Prior to preparing bid, contractor is responsible for verifying existing conditions, alert project manager of any conflicts with scope of work.

Submittals Submit manufacturer’s information for each piece of equipment. Use attached transmittal form for review and approval. Note: electronic submittals are acceptable. Sign and scan transmittal form for electronic submittals.

Product Submittals

1. A site safety plan shall be submitted for acceptance by contracting official and project NPS personnel.

2. A Service Schedule shall be provided to the National Monuments Contracting officer and onsite contract representative for acceptance of work timelines, and to organize logistical needs.

Coordination and Contacts

Contracting officer

Not Assigned

Intermountain Region Division of Facility Management:

Project Manager – Not Assigned

Flagstaff Area National Monuments

Chris Brothers, Acting Facility Manager Office: 928-525-6096 Chris_Brothers@nps.gov

Facility Supervisor Office: 928-526-0502 ext:338 chris_brothers@nps.gov

Erik Temple, Water System Operator Cell: 928-856-0049 Erik_Temple@nps.gov

Photographs of existing conditions SUCR Tower Site 50,000 Gallon Storage Tank

Site Location
Description of Potable Storage Tanks
Safety Requirements
Tank Sediment Removal and Cleaning
Tank Inspection
Disinfection of Water Storage Facility
Verification of Existing Conditions and Utility Location
Submittals
Product Submittals
Coordination and Contacts
Photographs of existing conditions