140P1522R0003_Amd_3_0003.pdf
PDF 289 KB Posted
- Attached to
- GRCA 229058 NORTH RIM WWTP REHAB
- Solicitation number
- 140P1522R0003
About this file
This document is an amendment to a solicitation for the rehabilitation of valves, pumps, and headworks at the North Rim Wastewater Treatment Plant in Grand Canyon National Park, Arizona. The National Park Service is seeking to replace valves, pumps, and the headworks and install a new ladder system and roof over existing vaults and pits. The time and date for receipt of proposals is extended to August 3, 2022 at 2:00pm local time. Questions from potential offerors are included regarding allowable work times due to plant operations, the structural integrity of the concrete walls and ability to support a new roof, and details of the column base plates for a cover over sludge holding ponds. The agency responses maintain the design as shown in the contract documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P1522R0003 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PIA
Flagstaff AZ 86001-2694 1824 S Thompson St, Ste 200 NPS, IMR - Arizona MABO
07/27/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/23/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. Project Title: Rehabilitation of North Rim WWTP Valves, Pumps, and Headworks, Grand
Canyon National Park, AZ
B. The time and date for receipt of proposals is extended to August 3, 2022 at 2:00pm Local
Time.
See Attachment for text of Amendment.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Connie Gordon
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140P1522R0003 Rehabilitation of North Rim WWTP Valves, Pumps, & Headworks, Grand Canyon National Park, AZ Amendment 003
C. Acknowledgement: See block 11 above regarding how to acknowledge this amendment. The acknowledgment must be received at the place designated for receipt of offers (see block 8 of the “Solicitation, Offer and Award” Standard Form 1442).
D. Offer Modification: See block 11 above if you have submitted your offer and now desire to modify or withdraw it.
E. Third Party: If you have given your copy of the solicitation to someone else, please forward this amendment accordingly.
FOR INFORMATION ONLY: See attached questions from potential Offerors and subsequent Answers.
Attachments
Solicitation No. 140P1522R0003 Rehabilitation of North Rim WWTP Valves, Pumps, & Headworks, Grand Canyon National Park, AZ Amendment No. 003
Rehabilitation of North Rim WWTP Valves, Pumps, & Headworks
AZ CONTRACTOR QUESTIONS/ANSWERS
1. The period of performance on this project calls out September 22’ – June 23’. It was brought to our attention at the site visit that there was only a short period of time (within those dates) that the new pumps and valves could be replaced due to the fact that the treatment plant can not be completely pumped out and has to be in use during different times. Can you confirm with us the time that work can be done on the new pumps, valves, headworks and ladder system?
RESPONSE: See Spec Section 01 11 00 – Summary of Work, Paragraph 1.4.A.
2. There was a lot of talk at the site visit about the concrete walls failing if the weight of a structural steel roof system was added to them. There were some on the site that seemed to think the concrete surrounding the vaults has already been compromised over time and is already failing. Has this been verified by the engineer?
RESPONSE: Design to remain as shown on Contract Documents.
3. There was also talk about the roof system barely being sloped. The operator on site said that was unacceptable to him however, that is what the plans show. He said it is common to see 10 feet of snow pile up on things and that the snow needs to slide off the roof. All the existing areas in that WWTP have pretty good sloped green aluminum roofs. The drawn system itself looks like it was designed to hold the snow load. However, that leads back to the previous question. Is the substrate strong enough to hold the new system with the snow load as well?
Has it been verified that the roof “as drawn” is how you would like it to be bid and installed?
RESPONSE: Design to remain as shown on Contract Documents
4. After reviewing Addendum #2, I did not see an answer to the question regarding the cover over the pits (Sludge Holding Ponds).
Please see attached PDF showing the condition of the pond wall and the requirements for the column base plates (see snapshot below from sheet S4.1 Roof Framing Details) I (we) do not believe that the existing conditions will not allow to install as shown t=on the drawings. Please advise.
Solicitation No. 140P1522R0003 Rehabilitation of North Rim WWTP Valves, Pumps, & Headworks, Grand Canyon National Park, AZ Amendment No. 003
RESPONSE: Design to remain as shown on Contract Documents