GRCA 230561 DV Tank Rehab Submittal Register_0001.pdf
PDF 146 KB Posted
- Attached to
- GRCA 230561 DESERT VIEW WATER TANK REHAB
- Solicitation number
- 140P1521Q0031
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P R
E- C
O N
ST
R
U C
TI
O
N
C
ER
T.
/L
A B
T
ES
T
R
EP
O R
T/ C
A
LC
O R
P
LA
N
M fg
. D A
T A
IN
ST
R
U C
TI
O
N S
P R
O D
U C
T D
A T
A
P R
E- C
O N
ST
R
U C
TI
O
N
D
ES
IG
N
C
O N
ST
D R
A W
IN
G
S
SH
O
P D
R A
W
IN
G
SA
M
P
LE
M fg
. D A
T A
IN
ST
R
U C
TI
O
N S
TR
A
N
SM
IT
TA
L
N U
M B
ER
013100 1.3.A.1 Letter designating Project Superintendent X
013100 1.3.A.5 List of Subcontractors X
013100 1.3.A.6 Written statements from subcontractors certifying compliance with applicable labor clauses X
013100 1.3.A.7 Satisfactory evidence of liability insurance coverage and workman's compensation for Contractor & Subcontractors X
013216 2.1 Schedule of Values X
013216 2.2 Construction Schedule X
013523 2.1 Site Specific Accident Prevention Plan X
014000 1.4.B Testing Agency Qualification Data X
014000 2.1.A Quality Control Plan X
014000 3.3.A Daily Reports X
017419 2.1 Waste Management Plan X
055213 2.1 Aluminum Handrail X X X
055213 2.1.A Professional Engineer Qualification X
055313 2.1 Grating (for hatch access platform) X X X
055313 2.1.A Welding Certificates (if welding is necessary) X
331302 2.2 Exterior Ladder Modifications X X
331302 2.4.1 Water Resistivity Test Results X
331302 2.4.2 Cathodic Protection Anodes X
331302 2.5 Confined Space Signs X
331302 2.6 Joint Sealer - exterior X X
DESERT VIEW WATER TANK REHABILITATION 230561
INFORMATIONAL
DIVISION 01 35 23 - SAFETY REQUIREMENTS
LIST OF MATERIAL SUBMITTALS
Spec.
Sec.
REQUIREMENTS
(indicate with an "X")
SUBMITTAL
Par. No. Description
DIVISION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
DIVISION 05 52 13 - PIPE TUBE AND RAILINGS
ACTION
DIVISION 33 13 02 - WATER STORAGE TANK MODIFICATIONS
DIVISION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
STATUS
DIVISION 01 32 16 - CONSTRUCTION SCHEDULE
DIVISION 01 40 00 - QUALITY REQUIREMENTS
DIVISION 05 53 13 - BAR GRATINGS
File details come from the government source that posted it. Updated .