B09_Amendment_4_-_GRTE_Fire_Extinguisher_Inspections_STATEMENT_OF_WORK_Rev_09142026_0004.docx
DOCX document 139 KB Posted
- Attached to
- GRTE FIRE EXTINGUISHER INSPECTIONS
- Solicitation number
- 140P1426Q0098
About this file
This is a Statement of Work (SOW) for annual fire extinguisher inspection and maintenance services at Grand Teton National Park (GRTE). The contractor shall provide all labor, supervision, tools, equipment, transportation, materials, and testing devices necessary to perform annual service and periodic testing of approximately 677–700 government-owned portable fire extinguishers distributed across multiple park locations including Flagg Ranch, Colter Bay, Moose, Moran, Jenny Lake, and various housing areas. Services must be performed between September 1–30 annually during standard business hours (8:00 a.m.–4:00 p.m., Monday through Friday), with a government-designated laborer available to assist with navigation and access.
Required services include annual inspection and operational testing of all extinguishers; hydrostatic testing of approximately 227 units (2.5 lb, 5 lb, 10 lb, and 20 lb sizes); six-year and twelve-year internal maintenance on approximately 225 units; proper disposal of expired or non-serviceable units; and miscellaneous parts replacement (valve stems, O-rings, hoses, tamper seals). All work must comply with NFPA 10 standards, manufacturer specifications, OSHA requirements, and applicable federal, state, and local regulations. Technicians must be properly trained and certified. The contract includes one base year and two option years, with payment on a not-to-exceed lump sum basis for actual services performed. Deliverables include an itemized list of serviced extinguishers, documentation of testing performed, a list of units requiring replacement, disposal records, and updated compliance documentation suitable for audit purposes, all to be submitted electronically.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Amendment_4_Price_Worksheet_Revised_09142026_0004.xlsx | XLSX spreadsheet | |
| Sol_140P1426Q0098_Amd_0004.pdf | ||
| B09_Amendment_4_-_GRTE_Fire_Extinguishers_Amendment_1_Q_A_0004.docx | DOCX document | |
| Sol_140P1426Q0098_Amd_0003.pdf | ||
| Sol_140P1426Q0098_Amd_0002.pdf | ||
| Sol_140P1426Q0098_Amd_0001.pdf | ||
| B03_Wage_Determinations_2015-5409_Teton_County.pdf | ||
| Sol_140P1426Q0098.pdf | ||
| A04_44041831_GRTE_Fire_Extinguisher_Inspections_STATEMENT_OF_WORK.docx | DOCX document | |
| B08_40538776_Price_Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope / Statement of Work (SOW) Task: GRTE Fire Extinguisher Inspections
Contract:
Table of Contents
1.0 Project Description / Summary
2.0 Scope
3.0 Locations and Estimated Quantities
4.0 Period of Performance
5.0 Vehicle Fire Extinguisher Testing
6.0 Technical Requirements
7.0 Required Services
8.0 Work Conditions and Access
9.0 Deliverables
10.0 Schedule of Items
11.0 Acceptance
12.0 Proposed Schedule of Inspections
Scope / Statement of Work
Task Order / Project Title:
GRTE Fire Extinguisher Inspections
Park / Park Unit:
GRTE/JODR
Task Order#:
| Prepared By: |
| Kim Redding |
| Date: |
| 2/24/26 |
STATEMENT OF WORK (SOW)
Annual Service and Testing of Fire Extinguishers Grand Teton National Park
1.0 Project Description / Summary
The Government requires annual inspection, testing, and maintenance of portable fire extinguishers located throughout Grand Teton National Park to ensure compliance with applicable fire and life safety codes and to maintain operational readiness of fire protection equipment.
The following are some of the locations that the contractor will visit directly (list may not be all inclusive):
Flagg Ranch, Colter Bay, Willow Flats, Brinkerhoff (for 2026 only), Signal Mountain, Jenny Lake, Moran, Lupine Meadows, Highlands, Beaver Creek, Moose area, White Grass Ranch, LSR Preserve, Granite Entrance, South Boundary houses, Elk Refuge houses, Helitack Base, Kelly housing, Antelope Flats housing, Shadow Mountain.
This requirement will consist of one (1) Base Year and two (2) Option Years.
2.0 Scope
The Contractor shall provide all labor, supervision, tools, equipment, transportation, materials, testing devices, parts, and incidentals necessary to perform annual service and required periodic testing of Government-owned portable fire extinguishers park-wide.
Services shall include annual inspection/testing, hydrostatic testing, internal maintenance (6-year and 12-year), and disposal of expired units as specified herein.
The total estimated quantity of extinguishers is approximately 677 700 units.
3.0 Locations and Estimated Quantities
Approximate number of extinguishers are distributed throughout the park as follows:
· 341 – Moose, WY
· 66 – Beaver Creek Housing Area
· 25 – Highlands Housing Area
· 20 – Lupine Meadows Housing Area
· 40 – Moran, WY
· 146 – Colter Bay Village, WY
· 20 – Flagg Ranch Area All other remote areas will consolidate extinguishers to central locations in Moose, Moran, and Colter Bay for servicing.
The Contractor is responsible for all transportation to and between work locations.
4.0 Period of Performance
Services shall be performed annually between:
September 1 – September 30 (Monday through Friday) Working hours: 8:00 a.m. – 4:00 p.m.
A Government-designated laborer will be available during these hours to assist with navigation and location access.
5.0 Vehicle Fire Extinguisher Testing
Testing of fire extinguishers assigned to Government vehicles shall be scheduled in coordination with park management to ensure employee notification and operational safety. Park staff shall have divisions bring extinguishers to a centralized location for ease of testing and scheduling.
6.0 Technical Requirements
All services shall be performed in accordance with:
· NFPA 10 – Standard for Portable Fire Extinguishers
· Manufacturer specifications
· OSHA requirements
· Applicable federal, state, and local regulations The Contractor shall ensure all technicians are properly trained and certified to perform fire extinguisher inspection and hydrostatic testing.
7.0 Required Services
7.1 Annual Inspection and Maintenance
· Perform annual inspection and operational testing of approximately 677 700 extinguishers.
· Verify pressure, condition, accessibility, labeling, hose integrity, seals, and mounting brackets.
· Apply updated inspection tag with service date and technician identification.
7.2 Hydrostatic Testing (Estimated Quantities)
· 2.5 lb extinguishers – 75 EA
· 5 lb extinguishers – 75 EA
· 10 lb extinguishers – 75 EA
· 20 lb extinguishers – 2 EA Hydrostatic testing shall be performed in accordance with NFPA 10 and DOT requirements.
7.3 Six-Year Internal Maintenance (Estimated Quantities)
· 2.5 lb extinguishers – 75 EA
· 5 lb extinguishers – 75 EA
· 10 lb extinguishers – 75 EA
7.4 Twelve-Year Maintenance (Estimated Quantities)
· 2.5 lb extinguishers – 75 EA
· 5 lb extinguishers – 75 EA
· 10 lb extinguishers – 75 EA
7.5 Disposal
The Contractor shall be responsible for proper disposal of expired, condemned, or non-serviceable extinguishers in accordance with all environmental and hazardous material regulations.
7.6 Miscellaneous Parts
The Contractor may replace minor components such as:
· Valve stems
· O-rings
· Hoses
· Tamper seals
· Other minor service parts Replacement parts shall meet manufacturer and NFPA standards.
8.0 Work Conditions and Access
· Extinguishers in housing areas will be available outside residences or at designated central collection points.
· Extinguishers in work areas will be consolidated where practicable.
· The Government will provide maps identifying housing and work area locations.
· The Contractor shall coordinate as needed for direction to consolidated service locations.
· NPS staff will accompany work crews to locations, or go ahead of their arrival to ensure fire extinguishers are outside where they are easily accessible.
· Daily briefing, coordination and communication with COR is required.
9.0 Deliverables
Upon completion of services, the Contractor shall provide:
1. Itemized list of all extinguishers serviced
2. Documentation of hydrostatic and internal testing performed
3. List of extinguishers requiring replacement
4. Record of units removed and disposed
5. Updated compliance documentation suitable for audit purposes All documentation shall be submitted electronically unless otherwise directed.
10.0 Schedule of Items
Quantities are estimates. Award will be made for a Not-to-Exceed (NTE) Lump Sum amount. Payment will be made only for actual services performed. Quantities shall not be exceeded without prior written approval of the Contracting Officer.
| Item |
| Estimated Quantity |
| Unit |
| Standard Annual Inspection/Test |
| 677 700 |
| EA |
| Hydro-testing – 2.5 lb |
| 75 |
| EA |
| Hydro-testing – 5 lb |
| 75 |
| EA |
| Hydro-testing – 10 lb |
| 75 |
| EA |
| Hydro-testing – 20 lb |
| 2 |
| EA |
| 6-Year Test – 2.5 lb |
| 75 |
| EA |
| 6-Year Test – 5 lb |
| 75 |
| EA |
| 6-Year Test – 10 lb |
| 75 |
| EA |
| 12-Year Test – 2.5 lb |
| 75 |
| EA |
| 12-Year Test – 5 lb |
| 75 |
| EA |
| 12-Year Test – 10 lb |
| 75 |
| EA |
| Possible Hazardous Material Charge |
| 1 |
| LS |
| Miscellaneous Parts |
| 1 |
| LS |
11.0 Acceptance
The Government will accept services upon verification that:
· All required inspections and testing have been completed
· Documentation has been submitted and verified
· Extinguishers are properly tagged and compliant with NFPA standards
· Disposal documentation has been provided
12.0 Proposed Schedule
image1.png image2.png
File details come from the government source that posted it. Updated .