Amendment_2_Q_As_0002.docx

DOCX document 15 KB Posted

Attached to
YELL GROUNDWATER MONITORING WELLS
Solicitation number
140P1424R0022
Issued by

About this file

This document is an Amendment 0002 to Solicitation No. 140P1424R0022 for the Installation of Groundwater Monitoring Wells in Yellowstone National Park. The solicitation is issued by the Department of the Interior National Park Service Intermountain Region.

The key details from the document include:

  • The solicitation is for the installation of groundwater monitoring wells throughout Yellowstone National Park.
  • The amendment provides responses to several questions from bidders, including:
    • There are no existing logs or lithology information available for the drill sites.
    • Mud mats will be required, with distances from existing roads to the borehole locations provided in the plan set.
    • All drill cuttings and drilling mud must be hauled off-site for disposal.
    • The well casing will extend 18-24 inches above grade, with a well cover to be installed per the plan set details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0002

SOLICITATION NO. 140P1424R0022

INSTALLATION OF GROUNDWATER MONITORING WELLS, YELLOWSTONE

JUNE 27, 2024

QUESTION 1: Do you have any logs? Any lithology info?

ANSWER 1: Not for the drill sites.

QUESTION 2: We have mud mats, what is approximate distance mud mats would be required?

ANSWER 2: See plan set with distances from existing roads to the borehole location.

QUESTION 4: Do drill cuttings need to be drummed or can cuttings be spread on site?

ANSWER 4: All drill cuttings and drilling mud shall be hauled off site.

QUESTION 5: If cuttings are drummed, will they be stored on-site or would you require we dispose of off-site?

ANSWER 5: Dispose of off-site.

QUESTION 6: I see the well casing will extend 18-24 inches above grade. Would an above ground monument be installed over casing? If so, would bollard posts be required as well?

ANSWER 6: See well cover detail B/3 on sheet 3 of the plan set.