AMENDMENT_0002_Q_As_0002.docx
DOCX document 14 KB Posted
- Solicitation number
- 140P1424R0020
About this file
This document is an Amendment to Solicitation #140P1424R0020 for the Stabilization of Cabin 4 at the Grand Teton Climbers' Ranch. The amendment addresses a set of questions and responses related to the scope of work.
The key details are:
- The scope of work is for the stabilization of Cabin 4, not Cabin 6 as previously referenced.
- Temporary reinforcement that was in place over the winter has been removed and is not required for the stabilization work.
- Drawings related to Cabin 6 should be disregarded, as the scope is focused solely on Cabin 4.
- Cabin 4 is currently occupied, but the agency can coordinate to have it vacated for the stabilization work.
- Water is available on site via yard hydrants and deep sinks, but contractors will need to provide their own containers for mixing concrete and cleaning tools.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0002
Stabilize Climbers' Ranch Cabin 4 Solicitation #140P1424R0020 June 28, 2024
QUESTION 1: Scope of work is stated as Cabin #4. There are references to cabin #6. (4.1). 4.1’s floor plan is not cabin #6. (typo)?
RESPONSE 1: Yes, it’s a typo. 4.1 should say Cabin #4.
QUESTION 2: 4.2.1 States temporary reinforcement is in place. I did not see any on my site visit.
Will temporary reinforcement be needed for this correction?
RESPONSE 2: We had temporary bracing for the winter only. We took it down when the season started. When the scope was written, it was still up, and we weren’t sure if we would leave it up. It is down and does not need to be up for the stabilization work. It was for the winter snow load only.
QUESTION 3: Drawing (SK1) Is the temporary reinforcement. With above question should this be disregarded?
RESPONSE 3: Yes, disregard the temporary reinforcement (SK1)
QUESTION 4: Drawing (S2.0) is for cabin #6. Is this in the purview of the scope?
RESPONSE 4: Remove anything regarding Cabin #6.
QUESTION 5: Drawing (S2.1) is for cabin #6. Is this in the purview of the scope?
RESPONSE 5: Remove anything regarding Cabin #6.
QUESTION 6: Will cabin #4 be vacant for this work? It was occupied during my site visit.
RESPONSE 6: It is not at the moment, but we can vacate it for the work. We just need to coordinate.
QUESTION 7: Scope advises water is not provided. Water is not accessible on the ranch at all?
RESPONSE 7: There are yard hydrants and deep sinks available, but buckets or some other container to mix concrete / clean tools will have to be used.
END OF AMENDMENT 0002